zbMATH — the first resource for mathematics

Examples
Geometry Search for the term Geometry in any field. Queries are case-independent.
Funct* Wildcard queries are specified by * (e.g. functions, functorial, etc.). Otherwise the search is exact.
"Topological group" Phrases (multi-words) should be set in "straight quotation marks".
au: Bourbaki & ti: Algebra Search for author and title. The and-operator & is default and can be omitted.
Chebyshev | Tschebyscheff The or-operator | allows to search for Chebyshev or Tschebyscheff.
"Quasi* map*" py: 1989 The resulting documents have publication year 1989.
so: Eur* J* Mat* Soc* cc: 14 Search for publications in a particular source with a Mathematics Subject Classification code (cc) in 14.
"Partial diff* eq*" ! elliptic The not-operator ! eliminates all results containing the word elliptic.
dt: b & au: Hilbert The document type is set to books; alternatively: j for journal articles, a for book articles.
py: 2000-2015 cc: (94A | 11T) Number ranges are accepted. Terms can be grouped within (parentheses).
la: chinese Find documents in a given language. ISO 639-1 language codes can also be used.

Operators
a & b logic and
a | b logic or
!ab logic not
abc* right wildcard
"ab c" phrase
(ab c) parentheses
Fields
any anywhere an internal document identifier
au author, editor ai internal author identifier
ti title la language
so source ab review, abstract
py publication year rv reviewer
cc MSC code ut uncontrolled term
dt document type (j: journal article; b: book; a: book article)
Design of capacitated multicommodity networks with multiple facilities. (English) Zbl 1163.90381
Summary: This paper addresses the problem of designing a multicommodity network using several facilities with different costs and capacities. The problem is addressed in a special context of designing private telecommunications networks using Fractional-T1 services. The algorithm starts from any given solution of the problem and gradually improves it by solving a series of subproblems, arriving at a local minimum. The subproblem is defined over a subset of links, called the subnetwork, by using one of the links as the base link. It is shown that the subproblem can be formulated as a multiple choice knapsack problem that is solved by dynamic programming. Computational results and lower bounds are reported on problems of up to 20 nodes and up to 3 facilities. On most problems, the algorithm produces solutions within about 5% of lower bound on the average. Although it was not possible to compute lower bounds for larger problems, heuristic solutions and running times are reported for problems of up to 99 nodes and four facilities.
MSC:
90B10Network models, deterministic (optimization)
90C35Programming involving graphs or networks
90B18Communication networks (optimization)
90C39Dynamic programming