Chen, Rongjun; Tang, Guochun Two-machine flow shop scheduling with limited cost of outsourcing. (English) Zbl 1449.90096 J. Syst. Sci. Math. Sci. 39, No. 9, 1462-1470 (2019). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{R. Chen} and \textit{G. Tang}, J. Syst. Sci. Math. Sci. 39, No. 9, 1462--1470 (2019; Zbl 1449.90096)
Chen, Rongjun; Tang, Guochun Supply chain scheduling with subcontracting options under uniform machines. (Chinese. English summary) Zbl 1274.90142 J. Syst. Sci. Math. Sci. 32, No. 1, 53-61 (2012). MSC: 90B35 90C59 90B06 PDFBibTeX XMLCite \textit{R. Chen} and \textit{G. Tang}, J. Syst. Sci. Math. Sci. 32, No. 1, 53--61 (2012; Zbl 1274.90142)
Wang, Kefeng; Ye, Chunming; Tang, Guochun The vehicle routing problem and it’s property with nodes having double demands. (Chinese. English summary) Zbl 1265.90055 J. Syst. Sci. Math. Sci. 31, No. 10, 1185-1196 (2011). MSC: 90B06 90B20 90C27 90C60 PDFBibTeX XMLCite \textit{K. Wang} et al., J. Syst. Sci. Math. Sci. 31, No. 10, 1185--1196 (2011; Zbl 1265.90055)
Zhang, Xingong; Yan, Guangle; Zhang, Feng; Tang, Guochun Machine scheduling algorithms with a new learning effect. (Chinese. English summary) Zbl 1240.90169 J. Syst. Sci. Math. Sci. 30, No. 10, 1359-1367 (2010). MSC: 90B35 90C27 68T05 PDFBibTeX XMLCite \textit{X. Zhang} et al., J. Syst. Sci. Math. Sci. 30, No. 10, 1359--1367 (2010; Zbl 1240.90169)
Chen, Rongjun; Tang, Guochun Supply chain scheduling with parallel machines. (Chinese. English summary) Zbl 1224.90068 J. Syst. Sci. Math. Sci. 30, No. 2, 274-282 (2010). MSC: 90B35 68W25 PDFBibTeX XMLCite \textit{R. Chen} and \textit{G. Tang}, J. Syst. Sci. Math. Sci. 30, No. 2, 274--282 (2010; Zbl 1224.90068)
Luo, Shoucheng; Cheng, Feng; Tang, Guochun Column generation for solving parallel machine scheduling problem. (Chinese. English summary) Zbl 1174.90484 J. Syst. Sci. Math. Sci. 28, No. 6, 739-746 (2008). MSC: 90B35 90C10 PDFBibTeX XMLCite \textit{S. Luo} et al., J. Syst. Sci. Math. Sci. 28, No. 6, 739--746 (2008; Zbl 1174.90484)