Wu, Qinghua; Gao, Qingxuan; Liu, Weibo; Cheng, Shuai Improved NEH-based heuristic for the blocking flow-shop problem with bicriteria of the makespan and machine utilization. (English) Zbl 1523.90216 Eng. Optim. 55, No. 3, 399-415 (2023). MSC: 90B35 90C29 PDFBibTeX XMLCite \textit{Q. Wu} et al., Eng. Optim. 55, No. 3, 399--415 (2023; Zbl 1523.90216) Full Text: DOI
Panwalkar, S. S.; Koulamas, Christos Three-stage ordered flow shops with either synchronous flow, blocking or no-idle machines. (English) Zbl 1435.90071 J. Sched. 23, No. 1, 145-154 (2020). Reviewer: Sigrid Knust (Osnabrück) MSC: 90B35 68M20 PDFBibTeX XMLCite \textit{S. S. Panwalkar} and \textit{C. Koulamas}, J. Sched. 23, No. 1, 145--154 (2020; Zbl 1435.90071) Full Text: DOI
Ozolins, Ansis Improved bounded dynamic programming algorithm for solving the blocking flow shop problem. (English) Zbl 07024038 CEJOR, Cent. Eur. J. Oper. Res. 27, No. 1, 15-38 (2019). MSC: 90Bxx PDFBibTeX XMLCite \textit{A. Ozolins}, CEJOR, Cent. Eur. J. Oper. Res. 27, No. 1, 15--38 (2019; Zbl 07024038) Full Text: DOI
Shao, Zhongshi; Pi, Dechang; Shao, Weishi Estimation of distribution algorithm with path relinking for the blocking flow-shop scheduling problem. (English) Zbl 1523.90200 Eng. Optim. 50, No. 5, 894-916 (2018). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{Z. Shao} et al., Eng. Optim. 50, No. 5, 894--916 (2018; Zbl 1523.90200) Full Text: DOI
Nouri, Nouha; Ladhari, Talel Evolutionary multiobjective optimization for the multi-machine flow shop scheduling problem under blocking. (English) Zbl 1398.90159 Ann. Oper. Res. 267, No. 1-2, 413-430 (2018). MSC: 90C29 90B35 PDFBibTeX XMLCite \textit{N. Nouri} and \textit{T. Ladhari}, Ann. Oper. Res. 267, No. 1--2, 413--430 (2018; Zbl 1398.90159) Full Text: DOI
Khorasanian, Danial; Moslehi, Ghasem Two-machine flow shop scheduling problem with blocking, multi-task flexibility of the first machine, and preemption. (English) Zbl 1391.90279 Comput. Oper. Res. 79, 94-108 (2017). MSC: 90B35 90C59 90B30 90C57 PDFBibTeX XMLCite \textit{D. Khorasanian} and \textit{G. Moslehi}, Comput. Oper. Res. 79, 94--108 (2017; Zbl 1391.90279) Full Text: DOI
Moslehi, Ghasem; Khorasanian, Danial A hybrid variable neighborhood search algorithm for solving the limited-buffer permutation flow shop scheduling problem with the makespan criterion. (English) Zbl 1348.90295 Comput. Oper. Res. 52, Part B, 260-268 (2014). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{G. Moslehi} and \textit{D. Khorasanian}, Comput. Oper. Res. 52, Part B, 260--268 (2014; Zbl 1348.90295) Full Text: DOI
Davendra, Donald; Zelinka, Ivan; Senkerik, Roman; Pluhacek, Michal Complex network analysis of discrete self-organising migrating algorithm. (English) Zbl 1320.90109 Zelinka, Ivan (ed.) et al., Nostradamus 2014: prediction, modeling and analysis of complex systems. Selected papers based on the presentations at the Nostradamus conference, Ostrava, Czech Republic, June 2014. Cham: Springer (ISBN 978-3-319-07400-9/pbk; 978-3-319-07401-6/ebook). Advances in Intelligent Systems and Computing 289, 161-174 (2014). MSC: 90C59 90B35 94C99 PDFBibTeX XMLCite \textit{D. Davendra} et al., Adv. Intell. Syst. Comput. 289, 161--174 (2014; Zbl 1320.90109) Full Text: DOI
Zhang, Zhiying; Dai, Yijun; Sui, Yi Block multi-flow shop scheduling with complex buffers. (Chinese. English summary) Zbl 1313.90101 J. Harbin Eng. Univ. 35, No. 7, 875-882 (2014). MSC: 90B35 90B36 90C59 PDFBibTeX XMLCite \textit{Z. Zhang} et al., J. Harbin Eng. Univ. 35, No. 7, 875--882 (2014; Zbl 1313.90101) Full Text: DOI
Elmi, Atabak; Topaloglu, Seyda A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots. (English) Zbl 1348.90254 Comput. Oper. Res. 40, No. 10, 2543-2555 (2013). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{A. Elmi} and \textit{S. Topaloglu}, Comput. Oper. Res. 40, No. 10, 2543--2555 (2013; Zbl 1348.90254) Full Text: DOI
Moslehi, Ghasem; Khorasanian, Danial Optimizing blocking flow shop scheduling problem with total completion time criterion. (English) Zbl 1348.90294 Comput. Oper. Res. 40, No. 7, 1874-1883 (2013). MSC: 90B35 90C11 90C57 PDFBibTeX XMLCite \textit{G. Moslehi} and \textit{D. Khorasanian}, Comput. Oper. Res. 40, No. 7, 1874--1883 (2013; Zbl 1348.90294) Full Text: DOI
Davendra, Donald; Zelinka, Ivan; Bialic-Davendra, Magdalena; Senkerik, Roman; Jasek, Roman Clustered enhanced differential evolution for the blocking flow shop scheduling problem. (English) Zbl 1339.90130 CEJOR, Cent. Eur. J. Oper. Res. 20, No. 4, 679-717 (2012). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{D. Davendra} et al., CEJOR, Cent. Eur. J. Oper. Res. 20, No. 4, 679--717 (2012; Zbl 1339.90130) Full Text: DOI
Kharbeche, Mohamed; Carlier, Jacques; Haouari, Mohamed; Moukrim, Aziz Exact methods for the robotic cell problem. (English) Zbl 1230.90091 Flex. Serv. Manuf. J. 23, No. 2, 242-261 (2011). MSC: 90B35 90C57 PDFBibTeX XMLCite \textit{M. Kharbeche} et al., Flex. Serv. Manuf. J. 23, No. 2, 242--261 (2011; Zbl 1230.90091) Full Text: DOI
Cohn, Amy; Kurnaz, Selin; Guan, Yihan; Jiang, Yiwen Trading off between makespan and customer responsiveness in flow shop sequencing. (English) Zbl 1197.90200 Int. J. Prod. Res. 48, No. 22, 6777-6797 (2010). MSC: 90B35 PDFBibTeX XMLCite \textit{A. Cohn} et al., Int. J. Prod. Res. 48, No. 22, 6777--6797 (2010; Zbl 1197.90200) Full Text: DOI
Carlier, Jacques; Haouari, Mohamed; Kharbeche, Mohamed; Moukrim, Aziz An optimization-based heuristic for the robotic cell problem. (English) Zbl 1176.90199 Eur. J. Oper. Res. 202, No. 3, 636-645 (2010). MSC: 90B35 90C57 90C59 PDFBibTeX XMLCite \textit{J. Carlier} et al., Eur. J. Oper. Res. 202, No. 3, 636--645 (2010; Zbl 1176.90199) Full Text: DOI
Wang, Ling; Pan, Quan-Ke; Suganthan, P. N.; Wang, Wen-Hong; Wang, Ya-Min A novel hybrid discrete differential evolution algorithm for blocking flow shop scheduling problems. (English) Zbl 1175.90199 Comput. Oper. Res. 37, No. 3, 509-520 (2010). MSC: 90B35 90C39 PDFBibTeX XMLCite \textit{L. Wang} et al., Comput. Oper. Res. 37, No. 3, 509--520 (2010; Zbl 1175.90199) Full Text: DOI
Hong, Zongyou; Yan, Ping; Pang, Hali Study on minimum blocked time algorithm for Blocking flow-shop scheduling. (Chinese. English summary) Zbl 1174.90469 J. Liaoning Norm. Univ., Nat. Sci. 30, No. 2, 148-151 (2007). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{Z. Hong} et al., J. Liaoning Norm. Univ., Nat. Sci. 30, No. 2, 148--151 (2007; Zbl 1174.90469)
Companys, Ramon; Mateo, Manel Different behaviour of a double branch-and-bound algorithm on \(\mathrm {Fm}|\mathrm{prmu}|C_{\max}\) and \(\mathrm {Fm}|\mathrm {block}|C_{\max}\) problems. (English) Zbl 1107.90016 Comput. Oper. Res. 34, No. 4, 938-953 (2007). MSC: 90B35 90C57 PDFBibTeX XMLCite \textit{R. Companys} and \textit{M. Mateo}, Comput. Oper. Res. 34, No. 4, 938--953 (2007; Zbl 1107.90016) Full Text: DOI
Wie, Sung-Hwan; Pinedo, Michael On minimizing the expected makespan and flow time in stochastic flow shops with blocking. (English) Zbl 0606.90061 Math. Oper. Res. 11, 336-342 (1986). Reviewer: C.N.Potts MSC: 90B35 PDFBibTeX XMLCite \textit{S.-H. Wie} and \textit{M. Pinedo}, Math. Oper. Res. 11, 336--342 (1986; Zbl 0606.90061) Full Text: DOI