Dey, Debopriya; Kar, Samarjit; Bhattacharya, Dilip Kumar Analytical solution of a modified single item continuous production inventory model under constant deterioration, goal levels and penalties. (English) Zbl 07814740 Opsearch 61, No. 1, 399-420 (2024). MSC: 90Bxx PDFBibTeX XMLCite \textit{D. Dey} et al., Opsearch 61, No. 1, 399--420 (2024; Zbl 07814740) Full Text: DOI
Amelkin, Victor; Vohra, Rakesh Yield uncertainty and strategic formation of supply chain networks. (English) Zbl 07791155 Networks 83, No. 1, 131-152 (2024). MSC: 90B05 90B30 PDFBibTeX XMLCite \textit{V. Amelkin} and \textit{R. Vohra}, Networks 83, No. 1, 131--152 (2024; Zbl 07791155) Full Text: DOI arXiv
Wang, Tong-Yuan; Chen, Zhen-Song; Wang, Xian-Jia; Govindan, Kannan; Skibniewski, Miroslaw J. Strategic information sharing in the dual-channel closed loop supply chain with nonlinear production cost. (English) Zbl 07791088 Inf. Sci. 657, Article ID 119944, 26 p. (2024). MSC: 90B06 90B05 91A80 PDFBibTeX XMLCite \textit{T.-Y. Wang} et al., Inf. Sci. 657, Article ID 119944, 26 p. (2024; Zbl 07791088) Full Text: DOI
Furmans, Kai Material handling and production systems modelling – based on queuing models (to appear). (English) Zbl 1269.90003 Berlin: Springer (ISBN 978-3-540-31774-6/hbk; 978-3-540-31777-7/ebook). 150 p. (2023). MSC: 90-02 37N40 90B22 90B30 90B05 90B15 PDFBibTeX XMLCite \textit{K. Furmans}, Material handling and production systems modelling -- based on queuing models (to appear). Berlin: Springer (2024; Zbl 1269.90003)
Hwang, Hark-Chin; van den Heuvel, Wilco; Wagelmans, Albert P. M. Multilevel lot-sizing with inventory bounds. (English) Zbl 07822514 INFORMS J. Comput. 35, No. 6, 1470-1490 (2023). MSC: 90B05 PDFBibTeX XMLCite \textit{H.-C. Hwang} et al., INFORMS J. Comput. 35, No. 6, 1470--1490 (2023; Zbl 07822514) Full Text: DOI
Otten, Sonja; Krenzler, Ruslan; Daduna, Hans; Kruse, Karsten Exponential single server queues in an interactive random environment. (English) Zbl 07808872 Stoch. Syst. 13, No. 2, 271-319 (2023). MSC: 60K25 90B22 PDFBibTeX XMLCite \textit{S. Otten} et al., Stoch. Syst. 13, No. 2, 271--319 (2023; Zbl 07808872) Full Text: DOI arXiv
Mathew, Nisha; Joshua, V. C.; Krishnamoorthy, A.; Melikov, A.; Mathew, Ambily P. A production inventory model with server breakdown and customer impatience. (English) Zbl 07801425 Ann. Oper. Res. 331, No. 2, 1269-1304 (2023). MSC: 90B05 90B22 60K25 90B25 PDFBibTeX XMLCite \textit{N. Mathew} et al., Ann. Oper. Res. 331, No. 2, 1269--1304 (2023; Zbl 07801425) Full Text: DOI
de la Cruz, Nha-Nghi; Daduna, Hans Analysis of second order properties of production-inventory systems with lost sales. (English) Zbl 07801413 Ann. Oper. Res. 331, No. 2, 899-921 (2023). MSC: 90B05 90B30 90B10 PDFBibTeX XMLCite \textit{N.-N. de la Cruz} and \textit{H. Daduna}, Ann. Oper. Res. 331, No. 2, 899--921 (2023; Zbl 07801413) Full Text: DOI OA License
Kim, Bara; Kim, Jeongsim; Lee, Sungji Joint pricing and inventory control for a production-inventory queueing system. (English) Zbl 07801409 Ann. Oper. Res. 331, No. 2, 787-805 (2023). MSC: 90B05 90B22 90B50 PDFBibTeX XMLCite \textit{B. Kim} et al., Ann. Oper. Res. 331, No. 2, 787--805 (2023; Zbl 07801409) Full Text: DOI
Panda, Srikumar; Maiti, Tarun Two-period decision strategies in a dual-channel supply chain considering reference price and online reviews. (English) Zbl 07792472 RAIRO, Oper. Res. 57, No. 6, 2951-2979 (2023). MSC: 90B05 90B06 90B30 PDFBibTeX XMLCite \textit{S. Panda} and \textit{T. Maiti}, RAIRO, Oper. Res. 57, No. 6, 2951--2979 (2023; Zbl 07792472) Full Text: DOI
Khanna, Aditi; Priyamvada; Yadav, Shikha; Jaggi, Chandra K. Strategic investment modelling for retail sector post COVID-19. (English) Zbl 07792460 RAIRO, Oper. Res. 57, No. 5, 2735-2751 (2023). MSC: 90B50 90B60 90B05 90B30 PDFBibTeX XMLCite \textit{A. Khanna} et al., RAIRO, Oper. Res. 57, No. 5, 2735--2751 (2023; Zbl 07792460) Full Text: DOI
Lin, Feng; Lin, Weiqing; Shi, Jinzhao; Wu, Peng; Hong, Weiyi Effects of prepayment policy on equilibrium of the retailer-dominated channel considering manufacturer effort. (English) Zbl 07792453 RAIRO, Oper. Res. 57, No. 5, 2601-2618 (2023). MSC: 90B05 90B30 90B50 PDFBibTeX XMLCite \textit{F. Lin} et al., RAIRO, Oper. Res. 57, No. 5, 2601--2618 (2023; Zbl 07792453) Full Text: DOI
Bhuniya, Shaktipada; Guchhait, Rekha; Ganguly, Baishakhi; Pareek, Sarla; Sarkar, Biswajit; Sarkar, Mitali An application of a smart production system to control deteriorated inventory. (English) Zbl 07792443 RAIRO, Oper. Res. 57, No. 5, 2435-2464 (2023). MSC: 90B05 90B06 90B30 90C30 90C31 PDFBibTeX XMLCite \textit{S. Bhuniya} et al., RAIRO, Oper. Res. 57, No. 5, 2435--2464 (2023; Zbl 07792443) Full Text: DOI
Sana, Shib Sankar The effects of green house gas costs on optimal pricing and production lotsize in an imperfect production system. (English) Zbl 07792432 RAIRO, Oper. Res. 57, No. 4, 2209-2230 (2023). MSC: 90B05 90B06 90B30 PDFBibTeX XMLCite \textit{S. S. Sana}, RAIRO, Oper. Res. 57, No. 4, 2209--2230 (2023; Zbl 07792432) Full Text: DOI
Das, Subhajit; Rahman, Md Sadikur; Shaikh, Ali Akbar; Bhunia, Asoke Kumar; Konstantaras, Ioannis Interval Laplace transform and its application in production inventory. (English) Zbl 07781782 Math. Methods Appl. Sci. 46, No. 4, 3983-4002 (2023). MSC: 44A10 65G40 65R10 90B05 PDFBibTeX XMLCite \textit{S. Das} et al., Math. Methods Appl. Sci. 46, No. 4, 3983--4002 (2023; Zbl 07781782) Full Text: DOI
Sadeghi, Heibatolah; Golpîra, Hêriş; Hnaien, Faicel; Magazzino, Cosimo Pricing-inventory model with discrete demand and delivery orders. (English) Zbl 07780128 Oper. Res. Decis. 33, No. 3, 119-139 (2023). MSC: 90B05 90B30 90B06 PDFBibTeX XMLCite \textit{H. Sadeghi} et al., Oper. Res. Decis. 33, No. 3, 119--139 (2023; Zbl 07780128) Full Text: Link
Pishchulov, Grigory; Richter, Knut; Golesorkhi, Sougand Supply chain coordination under asymmetric information and partial vertical integration. (English) Zbl 1527.90021 Ann. Oper. Res. 329, No. 1-2, 1315-1356 (2023). MSC: 90B05 90B06 90B30 90B60 91B38 PDFBibTeX XMLCite \textit{G. Pishchulov} et al., Ann. Oper. Res. 329, No. 1--2, 1315--1356 (2023; Zbl 1527.90021) Full Text: DOI OA License
Li, Zhiwen; Xu, Xianhao; Bai, Qingguo; Chen, Cheng Optimal joint decision of information disclosure and ordering in a blockchain-enabled luxury supply chain. (English) Zbl 1527.90047 Ann. Oper. Res. 329, No. 1-2, 1263-1314 (2023). MSC: 90B06 90B05 91B24 90B30 PDFBibTeX XMLCite \textit{Z. Li} et al., Ann. Oper. Res. 329, No. 1--2, 1263--1314 (2023; Zbl 1527.90047) Full Text: DOI
Nie, Jiajia; Wang, Qijun; Li, Gendao; Liu, Dun To share or not to share? When information sharing meets remanufacturing. (English) Zbl 1527.90049 Ann. Oper. Res. 329, No. 1-2, 815-846 (2023). MSC: 90B06 90B05 90B30 PDFBibTeX XMLCite \textit{J. Nie} et al., Ann. Oper. Res. 329, No. 1--2, 815--846 (2023; Zbl 1527.90049) Full Text: DOI
Fan, Xiaoqing; Zhang, Jianxiong; Zhu, Guowei Effects of consumers’ uncertain valuation-for-quality in a distribution channel. (English) Zbl 1527.90014 Ann. Oper. Res. 329, No. 1-2, 501-526 (2023). MSC: 90B05 90B06 91B26 62P20 90B30 PDFBibTeX XMLCite \textit{X. Fan} et al., Ann. Oper. Res. 329, No. 1--2, 501--526 (2023; Zbl 1527.90014) Full Text: DOI
Alwan, Layth C.; Yang, Chen; Fang, Weiguo An advanced buyback contract and information asymmetry. (English) Zbl 1527.90007 Ann. Oper. Res. 329, No. 1-2, 331-351 (2023). MSC: 90B05 90B06 90B30 90B50 91A12 PDFBibTeX XMLCite \textit{L. C. Alwan} et al., Ann. Oper. Res. 329, No. 1--2, 331--351 (2023; Zbl 1527.90007) Full Text: DOI
Li, Qingying; Ding, Hao; Shi, Tianqin; Tang, Yanli To share or not to share: the optimal advertising effort with asymmetric advertising effectiveness. (English) Zbl 1527.90121 Ann. Oper. Res. 329, No. 1-2, 249-276 (2023). MSC: 90B60 90B06 90B50 90B05 90B30 91A28 PDFBibTeX XMLCite \textit{Q. Li} et al., Ann. Oper. Res. 329, No. 1--2, 249--276 (2023; Zbl 1527.90121) Full Text: DOI
Xiao, Lei; Chen, Shuting; Huang, Song Observability of retailer demand information acquisition in a dual-channel supply chain. (English) Zbl 1527.90066 Ann. Oper. Res. 329, No. 1-2, 191-223 (2023). MSC: 90B06 90B05 91B38 PDFBibTeX XMLCite \textit{L. Xiao} et al., Ann. Oper. Res. 329, No. 1--2, 191--223 (2023; Zbl 1527.90066) Full Text: DOI
Ganesan, S.; Uthayakumar, R. An EPQ model for a single-machine multiproduct imperfect production system using a hybrid logarithmic barrier method. (English) Zbl 07759811 Opsearch 60, No. 3, 1121-1152 (2023). MSC: 90Bxx 90B05 90B30 90B50 90C30 PDFBibTeX XMLCite \textit{S. Ganesan} and \textit{R. Uthayakumar}, Opsearch 60, No. 3, 1121--1152 (2023; Zbl 07759811) Full Text: DOI
Luo, Xuxiang; Chu, Yuqing Optimal dynamic pricing and production policy for a stochastic inventory system with perishable products and inventory-level-dependent demand. (English) Zbl 07759644 J. Ind. Manag. Optim. 19, No. 12, 8541-8557 (2023). MSC: 90B05 90B36 90C39 PDFBibTeX XMLCite \textit{X. Luo} and \textit{Y. Chu}, J. Ind. Manag. Optim. 19, No. 12, 8541--8557 (2023; Zbl 07759644) Full Text: DOI
Bao, Sulifu; Hu, Zhi-Hua; Wang, Xiaohui An integrated optimization control model of combining epidemic and production-inventory models and its numerical simulations. (English) Zbl 07758931 Commun. Nonlinear Sci. Numer. Simul. 126, Article ID 107490, 17 p. (2023). MSC: 92D30 92C60 90B05 90B30 49N90 PDFBibTeX XMLCite \textit{S. Bao} et al., Commun. Nonlinear Sci. Numer. Simul. 126, Article ID 107490, 17 p. (2023; Zbl 07758931) Full Text: DOI
Lin, Sen; Li, Bo; Arreola-Risa, Antonio; Huang, Yiwei Optimizing a single-product production-inventory system under constant absolute risk aversion. (English) Zbl 1525.90035 Top 31, No. 3, 510-537 (2023). MSC: 90B05 90B30 90B50 91B16 PDFBibTeX XMLCite \textit{S. Lin} et al., Top 31, No. 3, 510--537 (2023; Zbl 1525.90035) Full Text: DOI
Lin, Bing; Chen, Shaoxiang; Bhatnagar, Rohit Optimal and heuristic policies for production and inventory controls in dual supply chains with fluctuating demands. (English) Zbl 1525.90032 Nav. Res. Logist. 70, No. 7, 708-734 (2023). MSC: 90B05 90C15 90C39 90B30 90C59 PDFBibTeX XMLCite \textit{B. Lin} et al., Nav. Res. Logist. 70, No. 7, 708--734 (2023; Zbl 1525.90032) Full Text: DOI
Arikan, Mazhar; Demir, Sercan; Erkoc, Murat Inventory management with advance supply contracts across multiple replenishment periods. (English) Zbl 1525.90006 Asia-Pac. J. Oper. Res. 40, No. 3, Article ID 2250031, 26 p. (2023). MSC: 90B05 90B06 90B30 90B50 90C15 90C39 PDFBibTeX XMLCite \textit{M. Arikan} et al., Asia-Pac. J. Oper. Res. 40, No. 3, Article ID 2250031, 26 p. (2023; Zbl 1525.90006) Full Text: DOI
Wang, Ermei; Li, Lin; Yang, Kuan; Zhou, Yinggao Integrating customer order decoupling point with operation planning in deteriorating supply chain: general dynamic model and applications. (English) Zbl 1525.90045 Asia-Pac. J. Oper. Res. 40, No. 2, Article ID 2250021, 27 p. (2023). MSC: 90B05 90B06 90B30 PDFBibTeX XMLCite \textit{E. Wang} et al., Asia-Pac. J. Oper. Res. 40, No. 2, Article ID 2250021, 27 p. (2023; Zbl 1525.90045) Full Text: DOI
Peng, Hongjun; Sun, Wenting; Pang, Tao Optimal strategies for a dual-channel farming supply chain with horizontal competition and cooperation. (English) Zbl 1525.90070 Asia-Pac. J. Oper. Res. 40, No. 2, Article ID 2250015, 40 p. (2023). MSC: 90B06 91B24 90B05 PDFBibTeX XMLCite \textit{H. Peng} et al., Asia-Pac. J. Oper. Res. 40, No. 2, Article ID 2250015, 40 p. (2023; Zbl 1525.90070) Full Text: DOI
Farghadani-Chaharsooghi, Pedram; Karimi, Behrooz A robust optimization approach for the production-routing problem with lateral transshipment and outsourcing. (English) Zbl 1525.65051 RAIRO, Oper. Res. 57, No. 4, 1957-1981 (2023). MSC: 65K05 90B05 90B06 90C90 90C17 PDFBibTeX XMLCite \textit{P. Farghadani-Chaharsooghi} and \textit{B. Karimi}, RAIRO, Oper. Res. 57, No. 4, 1957--1981 (2023; Zbl 1525.65051) Full Text: DOI
Lalremruati, Lalremruati; Khanna, Aditi Analysing a lean manufacturing inventory system with price-sensitive demand and carbon control policies. (English) Zbl 1521.90006 RAIRO, Oper. Res. 57, No. 4, 1797-1820 (2023). MSC: 90B05 PDFBibTeX XMLCite \textit{L. Lalremruati} and \textit{A. Khanna}, RAIRO, Oper. Res. 57, No. 4, 1797--1820 (2023; Zbl 1521.90006) Full Text: DOI
Li, Changwen; Cao, Bin; Zhou, Yong-Wu; Cheng, T. C. Edwin Pricing, coalition stability, and profit allocation in the pull assembly supply chains under competition. (English) Zbl 1521.90007 OR Spectrum 45, No. 3, 977-1011 (2023). MSC: 90B05 90B30 90B06 90B50 91A12 91B24 PDFBibTeX XMLCite \textit{C. Li} et al., OR Spectrum 45, No. 3, 977--1011 (2023; Zbl 1521.90007) Full Text: DOI
Konstantakis, Konstantinos N.; Cheilas, Panagiotis T.; Melissaropoulos, Ioannis G.; Xidonas, Panos; Michaelides, Panayotis G. Supply chains and fake news: a novel input-output neural network approach for the us food sector. (English) Zbl 1519.90006 Ann. Oper. Res. 327, No. 2, 779-794 (2023). MSC: 90B05 62M45 PDFBibTeX XMLCite \textit{K. N. Konstantakis} et al., Ann. Oper. Res. 327, No. 2, 779--794 (2023; Zbl 1519.90006) Full Text: DOI
Zissis, Dimitris Information sharing through digitalisation in decentralised supply chains. (English) Zbl 1519.90020 Ann. Oper. Res. 327, No. 2, 763-778 (2023). MSC: 90B05 90B06 91B26 91A80 90B30 90B50 PDFBibTeX XMLCite \textit{D. Zissis}, Ann. Oper. Res. 327, No. 2, 763--778 (2023; Zbl 1519.90020) Full Text: DOI
Kumar, Patanjal; Mangla, Sachin Kumar; Kazancoglu, Yigit; Emrouznejad, Ali A decision framework for incorporating the coordination and behavioural issues in sustainable supply chains in digital economy. (English) Zbl 1519.90031 Ann. Oper. Res. 326, No. 2, 721-749 (2023). MSC: 90B06 90B05 90B50 90B30 90B25 PDFBibTeX XMLCite \textit{P. Kumar} et al., Ann. Oper. Res. 326, No. 2, 721--749 (2023; Zbl 1519.90031) Full Text: DOI
Sharma, Satyendra Kumar; Srivastava, Praveen Ranjan; Kumar, Ajay; Jindal, Anil; Gupta, Shivam Supply chain vulnerability assessment for manufacturing industry. (English) Zbl 1519.90043 Ann. Oper. Res. 326, No. 2, 653-683 (2023). MSC: 90B06 90B50 90B05 90B30 PDFBibTeX XMLCite \textit{S. K. Sharma} et al., Ann. Oper. Res. 326, No. 2, 653--683 (2023; Zbl 1519.90043) Full Text: DOI
Wang, Ziping; Cheng, Feng; Chen, Jingxian; Yao, Dong-Qing Offshoring or reshoring: the impact of tax regulations on operations strategies. (English) Zbl 1519.90066 Ann. Oper. Res. 326, No. 1, 317-339 (2023). MSC: 90B30 90B05 PDFBibTeX XMLCite \textit{Z. Wang} et al., Ann. Oper. Res. 326, No. 1, 317--339 (2023; Zbl 1519.90066) Full Text: DOI
Chen, Zhongwei; Fan, Zhi-Ping Improvement strategies of battery driving range in an electric vehicle supply chain considering subsidy threshold and cost misreporting. (English) Zbl 1519.90004 Ann. Oper. Res. 326, No. 1, 89-113 (2023). MSC: 90B05 90B06 91B76 90B50 90B30 PDFBibTeX XMLCite \textit{Z. Chen} and \textit{Z.-P. Fan}, Ann. Oper. Res. 326, No. 1, 89--113 (2023; Zbl 1519.90004) Full Text: DOI
Shakouhi, F.; Tavakkoli-Moghaddam, R.; Baboli, A.; Bozorgi-Amiri, A. A competitive pharmaceutical supply chain under the marketing mix strategies and product life cycle with a fuzzy stochastic demand. (English) Zbl 1519.90042 Ann. Oper. Res. 324, No. 1-2, 1369-1397 (2023). MSC: 90B06 90B05 91A80 90B30 PDFBibTeX XMLCite \textit{F. Shakouhi} et al., Ann. Oper. Res. 324, No. 1--2, 1369--1397 (2023; Zbl 1519.90042) Full Text: DOI
Laguir, Issam; Modgil, Sachin; Bose, Indranil; Gupta, Shivam; Stekelorum, Rebecca Performance effects of analytics capability, disruption orientation, and resilience in the supply chain under environmental uncertainty. (English) Zbl 1519.90008 Ann. Oper. Res. 324, No. 1-2, 1269-1293 (2023). MSC: 90B05 90B06 90B30 PDFBibTeX XMLCite \textit{I. Laguir} et al., Ann. Oper. Res. 324, No. 1--2, 1269--1293 (2023; Zbl 1519.90008) Full Text: DOI
Chatterjee, Moutushi Multivariate supplier selection for asymmetric specification region: using price and quality. (English) Zbl 1519.90024 Ann. Oper. Res. 324, No. 1-2, 1023-1040 (2023). MSC: 90B06 90B05 62P30 90B50 90B30 91A80 PDFBibTeX XMLCite \textit{M. Chatterjee}, Ann. Oper. Res. 324, No. 1--2, 1023--1040 (2023; Zbl 1519.90024) Full Text: DOI
Amin-Tahmasbi, Hamzeh; Sadafi, Sina; Ekren, Banu Y.; Kumar, Vikas A multi-objective integrated optimisation model for facility location and order allocation problem in a two-level supply chain network. (English) Zbl 1519.90098 Ann. Oper. Res. 324, No. 1-2, 993-1022 (2023). MSC: 90B80 90B05 90B50 90B06 90B30 90C29 90C11 90C59 PDFBibTeX XMLCite \textit{H. Amin-Tahmasbi} et al., Ann. Oper. Res. 324, No. 1--2, 993--1022 (2023; Zbl 1519.90098) Full Text: DOI
Jauhari, Wakhid Ahmad; Pujawan, I. Nyoman; Suef, Mokh Sustainable inventory management with hybrid production system and investment to reduce defects. (English) Zbl 1518.90004 Ann. Oper. Res. 324, No. 1-2, 543-572 (2023). MSC: 90B05 90B06 PDFBibTeX XMLCite \textit{W. A. Jauhari} et al., Ann. Oper. Res. 324, No. 1--2, 543--572 (2023; Zbl 1518.90004) Full Text: DOI
Ishizaka, Alessio; Khan, Sharfuddin Ahmed; Kheybari, Siamak; Zaman, Syed Imran Supplier selection in closed loop pharma supply chain: a novel BWM-GAIA framework. (English) Zbl 1518.90010 Ann. Oper. Res. 324, No. 1-2, 13-36 (2023). MSC: 90B06 90B30 90B05 PDFBibTeX XMLCite \textit{A. Ishizaka} et al., Ann. Oper. Res. 324, No. 1--2, 13--36 (2023; Zbl 1518.90010) Full Text: DOI
Jalal, Aura; Alvarez, Aldair; Alvarez-Cruz, Cesar; De La Vega, Jonathan; Moreno, Alfredo The robust multi-plant capacitated lot-sizing problem. (English) Zbl 1518.90003 Top 31, No. 2, 302-330 (2023). MSC: 90B05 90B30 90C11 PDFBibTeX XMLCite \textit{A. Jalal} et al., Top 31, No. 2, 302--330 (2023; Zbl 1518.90003) Full Text: DOI
Azcue, Pablo; Frostig, Esther; Muler, Nora Optimal strategies in a production inventory control model. (English) Zbl 1520.91211 Methodol. Comput. Appl. Probab. 25, No. 1, Paper No. 43, 43 p. (2023). MSC: 91B38 90B05 90B30 49L25 PDFBibTeX XMLCite \textit{P. Azcue} et al., Methodol. Comput. Appl. Probab. 25, No. 1, Paper No. 43, 43 p. (2023; Zbl 1520.91211) Full Text: DOI arXiv
Büyüktahtakın, İ. Esra Scenario-dominance to multi-stage stochastic lot-sizing and knapsack problems. (English) Zbl 07706567 Comput. Oper. Res. 153, Article ID 106149, 16 p. (2023). MSC: 90Bxx PDFBibTeX XMLCite \textit{İ. E. Büyüktahtakın}, Comput. Oper. Res. 153, Article ID 106149, 16 p. (2023; Zbl 07706567) Full Text: DOI
Liu, Yuan-Yuan; Chang, Kuo-Hao; Chen, You-Ying Simultaneous predictive maintenance and inventory policy in a continuously monitoring system using simulation optimization. (English) Zbl 07706566 Comput. Oper. Res. 153, Article ID 106146, 20 p. (2023). MSC: 90Bxx PDFBibTeX XMLCite \textit{Y.-Y. Liu} et al., Comput. Oper. Res. 153, Article ID 106146, 20 p. (2023; Zbl 07706566) Full Text: DOI
Devalkar, Sripad K.; Janakiraman, Ganesh; Seshadri, Sridhar Dual sourcing systems: an asymptotic result for the cost of optimal tailored base-surge (TBS) policy. (English) Zbl 1525.90017 Oper. Res. Lett. 51, No. 3, 338-345 (2023). MSC: 90B05 90B30 90C15 90C39 PDFBibTeX XMLCite \textit{S. K. Devalkar} et al., Oper. Res. Lett. 51, No. 3, 338--345 (2023; Zbl 1525.90017) Full Text: DOI
Su, Rung-Hung; Yang, Dong-Yuh; Lin, He-Jhen; Yang, Yu-Cheng Estimating conservative profitability of a newsboy-type product with exponentially distributed demand based on multiple samples. (English) Zbl 1517.90007 Ann. Oper. Res. 322, No. 2, 967-989 (2023). MSC: 90B05 90B06 90B30 90B50 91B76 PDFBibTeX XMLCite \textit{R.-H. Su} et al., Ann. Oper. Res. 322, No. 2, 967--989 (2023; Zbl 1517.90007) Full Text: DOI
Jiang, Xiuqi; Zheng, Yini Pricing decisions and remanufacturing strategies considering consumer recycling behavior. (English) Zbl 1517.90014 Ann. Oper. Res. 322, No. 2, 755-792 (2023). MSC: 90B06 90B30 90B05 91B24 PDFBibTeX XMLCite \textit{X. Jiang} and \textit{Y. Zheng}, Ann. Oper. Res. 322, No. 2, 755--792 (2023; Zbl 1517.90014) Full Text: DOI
Roshani, Abdolreza; Paolucci, Massimo; Giglio, Davide; Demartini, Melissa; Tonelli, Flavio; Dulebenets, Maxim A. The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network. (English) Zbl 1516.90024 Ann. Oper. Res. 321, No. 1-2, 469-505 (2023). MSC: 90B35 90B30 90B05 90C59 90B06 90C11 PDFBibTeX XMLCite \textit{A. Roshani} et al., Ann. Oper. Res. 321, No. 1--2, 469--505 (2023; Zbl 1516.90024) Full Text: DOI
Vandana Partial trade-credit policy under preservation technology: a mathematical analytic approach to inventory models. (English) Zbl 1515.90022 Proc. Natl. Acad. Sci. India, Sect. A, Phys. Sci. 93, No. 2, 243-277 (2023). MSC: 90B05 90B30 PDFBibTeX XMLCite \textit{Vandana}, Proc. Natl. Acad. Sci. India, Sect. A, Phys. Sci. 93, No. 2, 243--277 (2023; Zbl 1515.90022) Full Text: DOI
Jain, Madhu; Sharma, Nidhi; Singh, Praveendra Sustainable inventory prediction with random defect and rework using Bat algorithm. (English) Zbl 1515.90017 RAIRO, Oper. Res. 57, No. 2, 481-501 (2023). MSC: 90B05 90C59 PDFBibTeX XMLCite \textit{M. Jain} et al., RAIRO, Oper. Res. 57, No. 2, 481--501 (2023; Zbl 1515.90017) Full Text: DOI
Ding, Guolei; Kaliyaperumal, Karthikeyan; Wang, Xiaoguang A new mathematical model for economic ordering with preventive maintenance and reworking in a supply chain. (English) Zbl 1515.90049 Discrete Dyn. Nat. Soc. 2023, Article ID 8636482, 11 p. (2023). MSC: 90B30 90B05 90B25 PDFBibTeX XMLCite \textit{G. Ding} et al., Discrete Dyn. Nat. Soc. 2023, Article ID 8636482, 11 p. (2023; Zbl 1515.90049) Full Text: DOI
Amaro, Gabriel de Souza; Fiorotto, Diego Jacinto; de Oliveira, Washington Alves Impact analysis of flexibility on the integrated lot sizing and supplier selection problem. (English) Zbl 1512.90005 Top 31, No. 1, 236-266 (2023). MSC: 90B05 90B30 PDFBibTeX XMLCite \textit{G. de S. Amaro} et al., Top 31, No. 1, 236--266 (2023; Zbl 1512.90005) Full Text: DOI
Ruidas, Subhendu; Seikh, Mijanur Rahaman; Nayak, Prasun Kumar Pricing strategy in an interval-valued production inventory model for high-tech products under demand disruption and price revision. (English) Zbl 1524.90021 J. Ind. Manag. Optim. 19, No. 9, 6451-6477 (2023). MSC: 90B05 90B30 90C59 PDFBibTeX XMLCite \textit{S. Ruidas} et al., J. Ind. Manag. Optim. 19, No. 9, 6451--6477 (2023; Zbl 1524.90021) Full Text: DOI
Dolai, Madhusudan; Banu, Ateka; Mondal, Shyamal Kumar Analyzing an imperfect production inventory model for green products considering learning effect on screening process under advertisement dependent credit period. (English) Zbl 1524.90131 J. Ind. Manag. Optim. 19, No. 8, 5486-5514 (2023). MSC: 90B30 90B05 90B60 PDFBibTeX XMLCite \textit{M. Dolai} et al., J. Ind. Manag. Optim. 19, No. 8, 5486--5514 (2023; Zbl 1524.90131) Full Text: DOI
Guo, Chunxiang; Zhang, Shihao; Jiang, Xuetong The impact of retailer’s demand information sharing strategies on manufacturer encroachment. (English) Zbl 07668959 J. Ind. Manag. Optim. 19, No. 7, 5119-5142 (2023). MSC: 90B05 90B60 91B38 90B50 PDFBibTeX XMLCite \textit{C. Guo} et al., J. Ind. Manag. Optim. 19, No. 7, 5119--5142 (2023; Zbl 07668959) Full Text: DOI
Dutta, Nilanjan; Kaur, Arshinder Enabling socially responsible operations: a decision-making model for a firm contracting with decision-biased smallholders. (English) Zbl 1506.90121 Ann. Oper. Res. 320, No. 1, 509-533 (2023). MSC: 90B50 90B05 90B06 90B30 90C15 PDFBibTeX XMLCite \textit{N. Dutta} and \textit{A. Kaur}, Ann. Oper. Res. 320, No. 1, 509--533 (2023; Zbl 1506.90121) Full Text: DOI
Jain, Tarun; Hazra, Jishnu; Cheng, T. C. E. Analysis of upstream pricing regulation and contract structure in an agriculture supply chain. (English) Zbl 1506.90016 Ann. Oper. Res. 320, No. 1, 85-122 (2023). MSC: 90B05 90B06 91B15 91B38 PDFBibTeX XMLCite \textit{T. Jain} et al., Ann. Oper. Res. 320, No. 1, 85--122 (2023; Zbl 1506.90016) Full Text: DOI
Metzker, Paula; Thevenin, Simon; Adulyasak, Yossiri; Dolgui, Alexandre Robust optimization for lot-sizing problems under yield uncertainty. (English) Zbl 1520.90010 Comput. Oper. Res. 149, Article ID 106025, 16 p. (2023). MSC: 90B05 90B30 90C17 PDFBibTeX XMLCite \textit{P. Metzker} et al., Comput. Oper. Res. 149, Article ID 106025, 16 p. (2023; Zbl 1520.90010) Full Text: DOI
Ruidas, Subhendu; Seikh, Mijanur Rahaman; Nayak, Prasun Kumar A production inventory model for high-tech products involving two production runs and a product variation. (English) Zbl 1513.90010 J. Ind. Manag. Optim. 19, No. 3, 2178-2205 (2023). MSC: 90B05 90B30 90C59 PDFBibTeX XMLCite \textit{S. Ruidas} et al., J. Ind. Manag. Optim. 19, No. 3, 2178--2205 (2023; Zbl 1513.90010) Full Text: DOI
Wang, Chenyin; Ni, Yaodong; Yang, Xiangfeng The inventory replenishment policy in an uncertain production-inventory-routing system. (English) Zbl 1513.90014 J. Ind. Manag. Optim. 19, No. 1, 549-572 (2023). MSC: 90B05 90C70 90B30 PDFBibTeX XMLCite \textit{C. Wang} et al., J. Ind. Manag. Optim. 19, No. 1, 549--572 (2023; Zbl 1513.90014) Full Text: DOI
Hou, Kuo-Lung; Srivastava, Hari M.; Lin, Li-Chiao; Sarker, Bhaba R.; Lee, Shih-Fang Optimal replenishment policy for non-instantaneous deteriorating items with stochastic demand under advance sales discount and available capacity. (English) Zbl 07812783 Math. Methods Appl. Sci. 45, No. 17, 11433-11448 (2022). MSC: 26A06 26A24 91B24 93C15 26D10 90B30 PDFBibTeX XMLCite \textit{K.-L. Hou} et al., Math. Methods Appl. Sci. 45, No. 17, 11433--11448 (2022; Zbl 07812783) Full Text: DOI
Bhatnagar, Pankaj; Kumar, Satish; Yadav, Dharmendra A single-stage cleaner production system with waste management, reworking, preservation technology, and partial backlogging under inflation. (English) Zbl 07799087 RAIRO, Oper. Res. 56, No. 6, 4327-4346 (2022). MSC: 90B05 90B06 90B30 PDFBibTeX XMLCite \textit{P. Bhatnagar} et al., RAIRO, Oper. Res. 56, No. 6, 4327--4346 (2022; Zbl 07799087) Full Text: DOI
Maiti, Tarun Optimal product quality and pricing strategy for a two-period closed-loop supply chain under return policy. (English) Zbl 07799061 RAIRO, Oper. Res. 56, No. 6, 3817-3843 (2022). MSC: 90B05 90B30 91B24 PDFBibTeX XMLCite \textit{T. Maiti}, RAIRO, Oper. Res. 56, No. 6, 3817--3843 (2022; Zbl 07799061) Full Text: DOI
Srivastava, H. M.; Liao, Jui-Jung; Huang, Kuo-Nan; Chung, Kun-Jen; Lin, Shy-Der; Lee, Shih-Fang Supply chain inventory model for deteriorating products with maximum lifetime under trade-credit financing. (English) Zbl 07794374 TWMS J. Pure Appl. Math. 13, No. 1, 53-71 (2022). MSC: 26A06 26A24 91B24 93C15 26D10 90B30 PDFBibTeX XMLCite \textit{H. M. Srivastava} et al., TWMS J. Pure Appl. Math. 13, No. 1, 53--71 (2022; Zbl 07794374) Full Text: Link
Ritu, Yadav; Sharma, Anil Kumar; Yadav, Subhash An economic production quantity model with selling price dependent demand under inflation and variable production rate for deteriorating items. (English) Zbl 07785348 Jñānābha 52, No. 1, 113-117 (2022). MSC: 90B05 PDFBibTeX XMLCite \textit{Y. Ritu} et al., Jñānābha 52, No. 1, 113--117 (2022; Zbl 07785348) Full Text: DOI
Sana, Shib Sankar Optimum buffer stock during preventive maintenance in an imperfect production system. (English) Zbl 07779890 Math. Methods Appl. Sci. 45, No. 15, 8928-8939 (2022). MSC: 90B05 90B30 90B25 PDFBibTeX XMLCite \textit{S. S. Sana}, Math. Methods Appl. Sci. 45, No. 15, 8928--8939 (2022; Zbl 07779890) Full Text: DOI
Alvarez, Aldair; Cordeau, Jean-François; Jans, Raf The consistent production routing problem. (English) Zbl 1528.90015 Networks 80, No. 3, 356-381 (2022). MSC: 90B06 90B05 90C57 90C59 PDFBibTeX XMLCite \textit{A. Alvarez} et al., Networks 80, No. 3, 356--381 (2022; Zbl 1528.90015) Full Text: DOI
Liu, Haitao; Wang, Yuan; Lee, Loo Hay; Chew, Ek Peng An approximate dynamic programming approach for production-delivery scheduling under non-stationary demand. (English) Zbl 1523.90176 Nav. Res. Logist. 69, No. 4, 511-528 (2022). MSC: 90B35 90B30 90B05 90C40 90C39 PDFBibTeX XMLCite \textit{H. Liu} et al., Nav. Res. Logist. 69, No. 4, 511--528 (2022; Zbl 1523.90176) Full Text: DOI
Jiang, Yi; Shu, Jia; Song, Miao Coping with shortages caused by disruptive events in automobile supply chains. (English) Zbl 1523.90009 Nav. Res. Logist. 69, No. 1, 21-35 (2022). MSC: 90B05 90B06 90B30 90C17 90C11 PDFBibTeX XMLCite \textit{Y. Jiang} et al., Nav. Res. Logist. 69, No. 1, 21--35 (2022; Zbl 1523.90009) Full Text: DOI
Doh, Hyoung-Ho; Lee, Dong-Ho Integrated disassembly and reprocessing lot-sizing for multi-level structured products in remanufacturing systems. (English) Zbl 1523.90119 Eng. Optim. 54, No. 9, 1476-1493 (2022). MSC: 90B30 90B05 PDFBibTeX XMLCite \textit{H.-H. Doh} and \textit{D.-H. Lee}, Eng. Optim. 54, No. 9, 1476--1493 (2022; Zbl 1523.90119) Full Text: DOI
Zheng, Rui; Zhou, Yifan A dynamic inspection and replacement policy for a two-unit production system subject to interdependence. (English) Zbl 1525.90180 Appl. Math. Modelling 103, 221-237 (2022). MSC: 90B25 90B05 PDFBibTeX XMLCite \textit{R. Zheng} and \textit{Y. Zhou}, Appl. Math. Modelling 103, 221--237 (2022; Zbl 1525.90180) Full Text: DOI
Panja, Subrata; Mondal, Shyamal Kumar Analytics of an imperfect four-layer production inventory model under two-level credit period using branch-and-bound technique. (English) Zbl 1524.90016 J. Oper. Res. Soc. China 10, No. 4, 725-748 (2022). MSC: 90B05 90B80 90B30 90C57 PDFBibTeX XMLCite \textit{S. Panja} and \textit{S. K. Mondal}, J. Oper. Res. Soc. China 10, No. 4, 725--748 (2022; Zbl 1524.90016) Full Text: DOI
Hu, Yusheng; Zhang, Wensi; Zhang, Liying; Lei, Xiao Dual-channel dynamic pricing in the presence of low-carbon preference. (English) Zbl 1505.90011 Discrete Dyn. Nat. Soc. 2022, Article ID 3881268, 8 p. (2022). MSC: 90B05 90B06 90B30 90C15 PDFBibTeX XMLCite \textit{Y. Hu} et al., Discrete Dyn. Nat. Soc. 2022, Article ID 3881268, 8 p. (2022; Zbl 1505.90011) Full Text: DOI
Arora, Ritu; Chauhan, Anand; Sharma, Renu; Singh, Anubhav Pratap Optimization of an EPQ model in an imprecise environment with defuzzification by the centroid method under inflation. (English) Zbl 1506.90003 Oper. Res. Decis. 32, No. 3, 32-48 (2022). MSC: 90B05 PDFBibTeX XMLCite \textit{R. Arora} et al., Oper. Res. Decis. 32, No. 3, 32--48 (2022; Zbl 1506.90003) Full Text: Link
Dobos, Imre Production-inventory strategies for a linear reverse logistics system. (English) Zbl 1524.90007 PU.M.A., Pure Math. Appl. 30, No. 3, 120-147 (2022). Reviewer: Helmut G. Kahlbacher (Wien) MSC: 90B05 90B06 90B30 PDFBibTeX XMLCite \textit{I. Dobos}, PU.M.A., Pure Math. Appl. 30, No. 3, 120--147 (2022; Zbl 1524.90007) Full Text: DOI
Jaber, M. Y.; Peltokorpi, J.; Smunt, T. L. The lot size problem and the learning curve: a review of mathematical modeling (1950’s–2020). (English) Zbl 1505.90004 Appl. Math. Modelling 105, 832-859 (2022). MSC: 90-03 90B05 90C90 PDFBibTeX XMLCite \textit{M. Y. Jaber} et al., Appl. Math. Modelling 105, 832--859 (2022; Zbl 1505.90004) Full Text: DOI
Jauhari, Wakhid Ahmad; Pujawan, I. Nyoman; Suef, Mokh; Govindan, Kannan Low carbon inventory model for vendor-buyer system with hybrid production and adjustable production rate under stochastic demand. (English) Zbl 1503.90011 Appl. Math. Modelling 108, 840-868 (2022). MSC: 90B06 90B05 91B38 91B42 91B76 PDFBibTeX XMLCite \textit{W. A. Jauhari} et al., Appl. Math. Modelling 108, 840--868 (2022; Zbl 1503.90011) Full Text: DOI
Hauck, Zsuzsanna; Rabta, Boualem; Reiner, Gerald Impact of early inspection on the performance of production systems – insights from an EPQ model. (English) Zbl 1503.90008 Appl. Math. Modelling 107, 670-687 (2022). MSC: 90B05 90B30 PDFBibTeX XMLCite \textit{Z. Hauck} et al., Appl. Math. Modelling 107, 670--687 (2022; Zbl 1503.90008) Full Text: DOI
Ouaret, Samir Production control problem with semi-Markov jump under stochastic demands and deteriorating inventories. (English) Zbl 1503.90042 Appl. Math. Modelling 107, 85-102 (2022). MSC: 90B30 90B05 93E20 49K45 49L20 49N90 PDFBibTeX XMLCite \textit{S. Ouaret}, Appl. Math. Modelling 107, 85--102 (2022; Zbl 1503.90042) Full Text: DOI
Manna, Amalesh Kumar; Rahman, Md Sadikur; Shaikh, Ali Akbar; Bhunia, Asoke Kumar; Konstantaras, Ioannis Modeling of a carbon emitted production inventory system with interval uncertainty via meta-heuristic algorithms. (English) Zbl 1503.90041 Appl. Math. Modelling 106, 343-368 (2022). MSC: 90B30 90B05 PDFBibTeX XMLCite \textit{A. K. Manna} et al., Appl. Math. Modelling 106, 343--368 (2022; Zbl 1503.90041) Full Text: DOI
Feng, Yi; Abdus, Sami; Tuo, Gladys; Chen, Shaoxiang Raw materials and production control with random supply and demand, an outside market and production capacity. (English) Zbl 1525.90023 Oper. Res. Lett. 50, No. 6, 679-684 (2022). MSC: 90B05 PDFBibTeX XMLCite \textit{Y. Feng} et al., Oper. Res. Lett. 50, No. 6, 679--684 (2022; Zbl 1525.90023) Full Text: DOI
Gu, Ming; Lu, Chi-Jie; Lee, Tian-Shyug; Lee, Hsiu-Mei; Yang, Chih-Te Effects of carbon tariffs on optimal production-inventory decisions for deteriorating items under carbon tax policy. (English) Zbl 1502.90007 Int. J. Inf. Manage. Sci. 33, No. 3, 183-200 (2022). MSC: 90B05 90B30 PDFBibTeX XMLCite \textit{M. Gu} et al., Int. J. Inf. Manage. Sci. 33, No. 3, 183--200 (2022; Zbl 1502.90007) Full Text: DOI
Jiang, Baojun; Tian, Lin Effects of reactive capacity on product quality and firm profitability in an uncertain market. (English) Zbl 1502.90009 Oper. Res. 70, No. 5, 2619-2636 (2022). MSC: 90B05 90B30 PDFBibTeX XMLCite \textit{B. Jiang} and \textit{L. Tian}, Oper. Res. 70, No. 5, 2619--2636 (2022; Zbl 1502.90009) Full Text: DOI
Farraa, Berna Bou; Abbou, Rosa; Loiseau, Jean Jacques Control by set invariance of a class of convolution systems. (English) Zbl 1504.90006 Valmorbida, Giorgio (ed.) et al., Accounting for constraints in delay systems. Based on the workshop, Gif-sur-Yvette, France; November 22–24, 2017. Cham: Springer. Adv. Delays Dyn. 12, 51-69 (2022). MSC: 90B05 93C05 90B30 PDFBibTeX XMLCite \textit{B. B. Farraa} et al., Adv. Delays Dyn. 12, 51--69 (2022; Zbl 1504.90006) Full Text: DOI
Shi, Jim Optimal continuous production-inventory systems subject to stockout risk. (English) Zbl 1501.90008 Ann. Oper. Res. 317, No. 2, 777-804 (2022). MSC: 90B05 90B30 PDFBibTeX XMLCite \textit{J. Shi}, Ann. Oper. Res. 317, No. 2, 777--804 (2022; Zbl 1501.90008) Full Text: DOI
Katehakis, Michael N.; Melamed, Benjamin; Shi, Jim Junmin Optimal replenishment rate for inventory systems with compound Poisson demands and lost sales: a direct treatment of time-average cost. (English) Zbl 1501.90005 Ann. Oper. Res. 317, No. 2, 665-691 (2022). MSC: 90B05 PDFBibTeX XMLCite \textit{M. N. Katehakis} et al., Ann. Oper. Res. 317, No. 2, 665--691 (2022; Zbl 1501.90005) Full Text: DOI
Melamed, Benjamin; Leuschner, Rudolf; Chen, Weiwei; Rogers, Dale S.; Cao, Min Inventory turns and finite-horizon Little’s laws. (English) Zbl 1501.90007 Ann. Oper. Res. 317, No. 1, 129-146 (2022). MSC: 90B05 90B06 90B30 PDFBibTeX XMLCite \textit{B. Melamed} et al., Ann. Oper. Res. 317, No. 1, 129--146 (2022; Zbl 1501.90007) Full Text: DOI
Guillaume, Romain; Kasperski, Adam; Zieliński, Paweł Robust inventory problem with budgeted cumulative demand uncertainty. (English) Zbl 1505.90090 Optim. Lett. 16, No. 9, 2543-2556 (2022). MSC: 90C17 90B05 PDFBibTeX XMLCite \textit{R. Guillaume} et al., Optim. Lett. 16, No. 9, 2543--2556 (2022; Zbl 1505.90090) Full Text: DOI
Malumfashi, M. L.; Ismail, Mohd Tahir; Ali, Majid Khan Majahar An EPQ model for delayed deteriorating items with two-phase production period, exponential demand rate and linear holding cost. (English) Zbl 1498.90076 Bull. Malays. Math. Sci. Soc. (2) 45, Suppl. 1, 395-424 (2022). MSC: 90B30 90B05 PDFBibTeX XMLCite \textit{M. L. Malumfashi} et al., Bull. Malays. Math. Sci. Soc. (2) 45, 395--424 (2022; Zbl 1498.90076) Full Text: DOI
Dávila, Sebastián; Labbé, Martine; Marianov, Vladimir; Ordónẽz, Fernando; Semet, Frédéric Product line optimization with multiples sites. (English) Zbl 1520.90005 Comput. Oper. Res. 148, Article ID 105978, 14 p. (2022). MSC: 90B05 90B30 90B80 90C11 90C57 91B24 PDFBibTeX XMLCite \textit{S. Dávila} et al., Comput. Oper. Res. 148, Article ID 105978, 14 p. (2022; Zbl 1520.90005) Full Text: DOI
Torkaman, Somayeh; Akbari Jokar, Mohammad Reza; Mutlu, Nevin; Van Woensel, Tom Rolling horizon-based heuristics for solving a production-routing problem with price-dependent demand. (English) Zbl 1520.90055 Comput. Oper. Res. 148, Article ID 105973, 11 p. (2022). MSC: 90B06 90B05 90B30 90C11 90C30 90C59 PDFBibTeX XMLCite \textit{S. Torkaman} et al., Comput. Oper. Res. 148, Article ID 105973, 11 p. (2022; Zbl 1520.90055) Full Text: DOI
Lai, David; Li, Yijun; Demir, Emrah; Dellaert, Nico; Van Woensel, Tom Self-adaptive randomized constructive heuristics for the multi-item capacitated lot sizing problem. (English) Zbl 1520.90009 Comput. Oper. Res. 147, Article ID 105928, 16 p. (2022). MSC: 90B05 90B30 90C59 PDFBibTeX XMLCite \textit{D. Lai} et al., Comput. Oper. Res. 147, Article ID 105928, 16 p. (2022; Zbl 1520.90009) Full Text: DOI arXiv
Meyr, Herbert; Kiel, Mirko Minimizing setups and waste when printing labels of consumer goods. (English) Zbl 1497.90012 OR Spectrum 44, No. 3, 733-761 (2022). MSC: 90B05 90B35 90C59 90C39 PDFBibTeX XMLCite \textit{H. Meyr} and \textit{M. Kiel}, OR Spectrum 44, No. 3, 733--761 (2022; Zbl 1497.90012) Full Text: DOI
Ventura, José A.; Golany, Boaz; Mendoza, Abraham; Li, Chenxi A multi-product dynamic supply chain inventory model with supplier selection, joint replenishment, and transportation cost. (English) Zbl 1497.90027 Ann. Oper. Res. 316, No. 2, 729-762 (2022). MSC: 90B05 90B06 90C11 90C05 90B35 PDFBibTeX XMLCite \textit{J. A. Ventura} et al., Ann. Oper. Res. 316, No. 2, 729--762 (2022; Zbl 1497.90027) Full Text: DOI