Presman, E. L.; Sethi, S. P.; Zhang, H.; Bisi, A. Average cost optimal policy for a stochastic two-machine flowshop with limited work-in-process. (English) Zbl 1042.90572 Nonlinear Anal., Theory Methods Appl. 47, No. 8, 5671-5678 (2001). Cited in 1 Document MSC: 90B36 Stochastic scheduling theory in operations research 90B30 Production models PDFBibTeX XMLCite \textit{E. L. Presman} et al., Nonlinear Anal., Theory Methods Appl., Ser. A, Theory Methods 47, No. 8, 5671--5678 (2001; Zbl 1042.90572) Full Text: DOI