×

zbMATH — the first resource for mathematics

Bottlenecks with respect to due-time performance in pull serial production lines. (English) Zbl 0972.90022
Summary: In this work, serial production lines with finished goods buffers operating in the pull regime are considered. The machines are assumed to obey Bernoulli reliability model. The problem of satisfying customers demand is addressed. The level of demand satisfaction is quantified by the due-time performance (DTP), which is defined as the probability to ship to the customer a required number of parts during a fixed time interval. Within this scenario, the definitions of DTP bottlenecks are introduced and a method for their identification is developed.

MSC:
90B30 Production models
PDF BibTeX XML Cite
Full Text: DOI EuDML