zbMATH — the first resource for mathematics

A scheduling method for Berth and Quay cranes. (English) Zbl 1012.90011
Summary: This paper discusses a method for scheduling Berth and Quay cranes, which are critical resources in port container terminals. An integer programming model is formulated by considering various practical constraints. A two-phase solution procedure is suggested for solving the mathematical model. The first phase determines the Berthing position and time of each vessel as well as the number of cranes assigned to each vessel at each time segment. The subgradient optimization technique is applied to obtain a near-optimal solution of the first phase. In the second phase, a detailed schedule for each Quay crane is constructed based on the solution found from the first phase. The dynamic programming technique is applied to solve the problem of the second phase. A numerical experiment was conducted to test the performance of the suggested algorithms.

MSC:
90B35 Deterministic scheduling theory in operations research
90B06 Transportation, logistics and supply chain management
90C39 Dynamic programming
PDF BibTeX XML Cite
Full Text: DOI