×

zbMATH — the first resource for mathematics

Economic order quantity model for deteriorating items with planned backorder level. (English) Zbl 1228.90011
Summary: A deteriorating inventory problem with and without backorders is developed. From the literature search, this study is one of the first attempts by researchers to solve a deteriorating inventory problem with a simplified approach. The optimal solutions are compared with the classical methods for solving deteriorating inventory model. The total cost of the simplified model is almost identical to the original model.

MSC:
90B05 Inventory, storage, reservoirs
PDF BibTeX XML Cite
Full Text: DOI
References:
[1] Grubbström, R.W.; Erdem, A., The EOQ with backlogging derived without derivatives, International journal of production economics, 59, 529-530, (1999)
[2] Cárdenas-Barrón, L.E., The economic production quantity (EPQ) with shortage derived algebraically, International journal of production economics, 70, 289-292, (2001)
[3] Yang, P.C.; Wee, H.M., The economic lot-size of the integrated vendor – buyer inventory system derived without derivatives, Optimal control applications and methods, 23, 163-169, (2002) · Zbl 1072.90503
[4] Cárdenas-Barrón, L.E.; Wee, H.M.; Blos, M.F., Solving the vendor – buyer integrated inventory system with arithmetic – geometric inequality, Mathematical and computer modelling, 53, 991-997, (2011) · Zbl 1217.90011
[5] Wee, H.M.; Chung, S.L.; Yang, P.C., Technical note — a modified EOQ model with temporary Sale price derived without derivatives, The engineering economist, 48, 190-195, (2003)
[6] Chang, J.K.; Chuang, J.P.C.; Chen, H.J., Short comments on technical note — the EOQ and EPQ models with shortages derived without derivatives, International journal production economics, 97, 241-243, (2005)
[7] Sphicas, G.P., EOQ and EPQ with linear and fixed backorder costs: two cases identified and models analyzed without calculus, International journal production economics, 100, 59-64, (2006)
[8] Cárdenas-Barrón, L.E., Optimal manufacturing batch size with rework in a single-stage production system — a simple derivation, Computers and industrial engineering, 55, 758-765, (2008)
[9] Minner, S., A note on how to compute economic order quantities without derivatives by cost comparisons, International journal production economics, 105, 293-296, (2007)
[10] Wee, H.M.; Chung, C.J., A note on the economic lot size of the integrated vendor – buyer inventory system derived without derivatives, European journal of operational research, 177, 1289-1293, (2007) · Zbl 1102.90004
[11] Cárdenas-Barrón, L.E., Optimizing inventory decisions in a multi-stage multi customer supply chain: a note, Transportation research part E: logistics and transportation :review, 43, 647-654, (2007)
[12] Teng, J.T., A simple method to compute economic order quantities, European journal of operational research, 198, 351-353, (2009) · Zbl 1163.90351
[13] L.Y. Ouyang, C.T. Chang, P. Shum, The EOQ with defective items and partially permissible delay in payments linked to order quantity derived algebraically, Central European Journal of Operations Research, doi:10.1007/s10100-0-010-0160-9. · Zbl 1245.90005
[14] Teng, J.T.; Cárdenas-Barrón, L.E.; Lou, K.R., The economic lot size of the integrated vendor – buyer inventory system derived without derivatives: a simple derivation, Applied mathematics and computation, 217, 5972-5977, (2011) · Zbl 1237.90030
[15] Cárdenas-Barrón, L.E., An easy method to derive EOQ and EPQ inventory models with backorders, Computers & mathematics with applications, 59, 948-952, (2010) · Zbl 1189.90009
[16] Cárdenas-Barrón, L.E., The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra, Applied mathematical modelling, 35, 2394-2407, (2011) · Zbl 1217.90010
[17] Yang, P.C.; Wee, H.M., An excess inventory model of deteriorating items taking account of present value, The engineering economist, 46, 139-152, (2001)
[18] Chung, K.J.; Chang, S.L.; Yang, W.D., The optimal cycle time for exponentially deteriorating products under trade credit financing, The engineering economist, 46, 232-242, (2001)
[19] Yang, P.C.; Wee, H.M., A collaborative inventory system with permissible delay in payment for deteriorating items, Mathematical and computer modelling, 43, 209-221, (2006) · Zbl 1170.90320
[20] Maity, A.K.; Maity, K.; Mondal, S.; Maiti, M., A Chebyshev approximation for solving the optimal production inventory model of deteriorating multi-item, Mathematical and computer modelling, 45, 149-161, (2007) · Zbl 1173.90311
[21] Sana, S.S., Demand influence by enterprises’ initiatives — a multi-item EOQ model of deteriorating and ameliorating items, Mathematical and computer modelling, 52, 284-302, (2010) · Zbl 1201.90018
[22] Yang, P.C.; Wee, H.M.; Ho, P.C., Sequential and global optimization for a closed-loop deteriorating inventory supply chain, Mathematical and computer modelling, 52, 161-176, (2010) · Zbl 1201.90041
[23] Sana, S.S., Optimal selling price and lotsize with time varying deterioration and partial backordering, Applied mathematics and computation, 217, 185-194, (2010) · Zbl 1231.90055
[24] Widyadana, G.A.; Wee, H.M., Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time, Applied mathematical modelling, 35, 3495-3508, (2011) · Zbl 1221.90024
[25] Sana, S.S., Price sensitive demand for perishable items — an EOQ model, Applied mathematics and computation, 217, 6248-6259, (2011) · Zbl 1208.90011
[26] Goyal, S.K.; Giri, B.C., Recent trends in modeling of deteriorating inventory, European journal of operational research, 134, 1-16, (2001) · Zbl 0978.90004
[27] Zipkin, P.H., Foundations of inventory management, (2000), McGraw-Hill Higher Education · Zbl 1370.90005
[28] Sana, S.S., A production – inventory model in an imperfect production process, European journal of operational research, 200, 451-464, (2010) · Zbl 1177.90027
[29] Sana, S.S., An economic production lot size model in an imperfect production system, European journal of operational research, 201, 158-170, (2010) · Zbl 1177.90133
[30] Sana, S.S.; Chauduri, K., An EMQ model in as imperfect production process, International journal of systems science, 41, 635-646, (2010) · Zbl 1200.90015
[31] Sana, S.S., A production – inventory model of imperfect quality products in a three-layer supply chain, Decision support systems, 50, 539-547, (2011)
[32] M.D. Roy, S.S. Sana, K Chauduri, An economic order quantity model of imperfect quality items with partial backlogging, International Journal of Systems Science, doi:10.1080/00207720903576498.
[33] Wee, H.M.; Wang, W.T.; Chung, C.J., A modified method to compute economic order quantities without derivatives by cost-difference comparisons, European journal of operational research, 194, 336-338, (2009) · Zbl 1179.90025
[34] Misra, R.B., Optimum production lot size model for a system with deteriorating inventory, International journal production research, 13, 495-505, (1975)
[35] Kang, S.; Kim, I.T., A study on the price and production level of the deteriorating inventory system, International journal production research, 21, 899-908, (1983) · Zbl 0542.90029
[36] Lin, G.C.; Gong, D.C., On a production – inventory system of the deteriorating items subject to random machine breakdowns with a fixed repair time, Mathematical and computer modelling, 43, 920-932, (2006) · Zbl 1180.90103
This reference list is based on information provided by the publisher or from digital mathematics libraries. Its items are heuristically matched to zbMATH identifiers and may contain data conversion errors. It attempts to reflect the references listed in the original paper as accurately as possible without claiming the completeness or perfect precision of the matching.