Sequencing with due-dates and early start times to minimize maximum tardiness. (English) Zbl 0277.90044


MSC:

90B35 Deterministic scheduling theory in operations research
PDFBibTeX XMLCite
Full Text: DOI

References:

[1] Bratley, Nav. Res. Log. Quart. 18 pp 511– (1971)
[2] , and , Theory of Scheduling (Addison- Wesley, Reading, Mass., 1967).
[3] Dessouky, AIIE Transactions 4 (1972) · doi:10.1080/05695557208974852
[4] ”Scheduling a Production Line to Minimize Maximum Tardiness,” Research Report #43, Management Science Research Project, UCLA (Jan. 1955). See also[2] above.
This reference list is based on information provided by the publisher or from digital mathematics libraries. Its items are heuristically matched to zbMATH identifiers and may contain data conversion errors. In some cases that data have been complemented/enhanced by data from zbMATH Open. This attempts to reflect the references listed in the original paper as accurately as possible without claiming completeness or a perfect matching.