Slowinski, Roman Optimal and heuristic procedures for project scheduling with multiple constrained resources - a survey. (English) Zbl 0373.90032 Found. Control Eng. 2, 33-49 (1977). Page: −5 −4 −3 −2 −1 ±0 +1 +2 +3 +4 +5 Show Scanned Page Cited in 1 Document MSC: 90B35 Deterministic scheduling theory in operations research 90-02 Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming 90C90 Applications of mathematical programming 90C35 Programming involving graphs or networks PDF BibTeX XML Cite \textit{R. Slowinski}, Found. Control Eng. 2, 33--49 (1977; Zbl 0373.90032) OpenURL