×

zbMATH — the first resource for mathematics

A heuristic algorithm to schedule work in the repair industry. (English) Zbl 0729.90817

MSC:
90B35 Deterministic scheduling theory in operations research
90-08 Computational methods for problems pertaining to operations research and mathematical programming
90B25 Reliability, availability, maintenance, inspection in operations research
PDF BibTeX XML Cite
Full Text: DOI
References:
[1] DOI: 10.1287/opre.23.1.62 · Zbl 0307.90037
[2] DOI: 10.1287/mnsc.16.10.B630 · Zbl 0194.50504
[3] ENSCORE E., Society of Manufacturing Engineers (1982)
[4] DANNENBRING D. G., Management Science 23 pp 1172– (1976)
[5] FRLNCH , S. , 1986 ,Sequencing and Scheduling An Introduction to the Mathematics of the Job–Shop( Ellis Horwood Limited , New York ) pp. 66 – 70 .
[6] DOI: 10.1080/00207547808930015
[7] DOI: 10.1057/jors.1971.18 · Zbl 0216.26705
[8] DOI: 10.1080/05695557108974807
[9] DOI: 10.1016/0305-0548(75)90011-8
[10] GUPTA J. N. D., Revue francaise d’ automatique informatique recherche operationnelle 10 pp 63– (1976)
[11] HAM I., Group Technology Applications to Production Management (1985)
[12] HICKS , C. R. , 1982 ,Fundamental Concepts in the Design of Experiments, 3rd Ed. ( Holt, Rinehart and Winston , New York ) p. 60 . · Zbl 0867.62061
[13] HITOMI K., Memoirs of the Faculty of Engineering 50 pp 176– (1988)
[14] HITOMI K., CIRP Annals 25 pp 419– (1976)
[15] DOI: 10.1080/00207548408942460
[16] DOI: 10.1002/nav.3800010110 · Zbl 1349.90359
[17] DOI: 10.1080/00207548008919673
[18] DOI: 10.1080/07408178608975349
[19] DOI: 10.1080/00207548408942505
[20] NAKAMURA N., AIIE Transactions 10 pp 157– (1978)
[21] DOI: 10.1016/0305-0483(83)90088-9
[22] PAGE E. S., Journal of the Royal Statistical Society 23 pp 484– (1961)
[23] DOI: 10.1057/jors.1965.8
[24] DOI: 10.1080/00207547608956381
[25] DOI: 10.1080/00207548408942436 · Zbl 0541.90055
[26] PETROV V. A., Flow line group production planning (1966)
[27] RADHARAMAN R., Proceedings of the International Industrial Engineering Conference pp 229– (1986)
[28] DOI: 10.1016/0360-8352(88)90004-6
[29] DOI: 10.1287/inte.19.1.102
[30] RiNNOOY KAN A. H. G., Machine Scheduling Problems–Classification, Complexity and Computations (1976)
[31] DOI: 10.1287/opre.31.6.1167 · Zbl 0538.62075
[32] DOI: 10.1287/opre.21.6.1250 · Zbl 0274.90020
[33] TAYLOR J. F., Society of Manufacturing Engineers Technical paper 82 pp 483– (1981)
This reference list is based on information provided by the publisher or from digital mathematics libraries. Its items are heuristically matched to zbMATH identifiers and may contain data conversion errors. It attempts to reflect the references listed in the original paper as accurately as possible without claiming the completeness or perfect precision of the matching.