zbMATH — the first resource for mathematics

Examples
Geometry Search for the term Geometry in any field. Queries are case-independent.
Funct* Wildcard queries are specified by * (e.g. functions, functorial, etc.). Otherwise the search is exact.
"Topological group" Phrases (multi-words) should be set in "straight quotation marks".
au: Bourbaki & ti: Algebra Search for author and title. The and-operator & is default and can be omitted.
Chebyshev | Tschebyscheff The or-operator | allows to search for Chebyshev or Tschebyscheff.
"Quasi* map*" py: 1989 The resulting documents have publication year 1989.
so: Eur* J* Mat* Soc* cc: 14 Search for publications in a particular source with a Mathematics Subject Classification code (cc) in 14.
"Partial diff* eq*" ! elliptic The not-operator ! eliminates all results containing the word elliptic.
dt: b & au: Hilbert The document type is set to books; alternatively: j for journal articles, a for book articles.
py: 2000-2015 cc: (94A | 11T) Number ranges are accepted. Terms can be grouped within (parentheses).
la: chinese Find documents in a given language. ISO 639-1 language codes can also be used.

Operators
a & b logic and
a | b logic or
!ab logic not
abc* right wildcard
"ab c" phrase
(ab c) parentheses
Fields
any anywhere an internal document identifier
au author, editor ai internal author identifier
ti title la language
so source ab review, abstract
py publication year rv reviewer
cc MSC code ut uncontrolled term
dt document type (j: journal article; b: book; a: book article)
An inventory model for deteriorating items with partial backlogging and permissible delay in payments. (English) Zbl 1006.90002
Summary: The paper deals with an inventory model with a varying rate of deterioration and partial backlogging rate under the condition of permissible delay in payments. The existing literature on the subject generally deal with situations where the payment of an order is made on the receipt of items by the inventory system and shortages are either completely backlogged or fully lost. In this paper, a varying deterioration rate of time and the condition of permissible delay in payments used in conjunction with the economic order quantity model are the focus of discussion. In addition, the shortages are neither completely backlogged nor completely lost assuming the backlogging rate to be inversely proportional to the waiting time for the next replenishment. Numerical examples are presented to illustrate the model.

MSC:
90B05Inventory, storage, reservoirs
90B50Management decision making, including multiple objectives
WorldCat.org
Full Text: DOI