zbMATH — the first resource for mathematics

Examples
Geometry Search for the term Geometry in any field. Queries are case-independent.
Funct* Wildcard queries are specified by * (e.g. functions, functorial, etc.). Otherwise the search is exact.
"Topological group" Phrases (multi-words) should be set in "straight quotation marks".
au: Bourbaki & ti: Algebra Search for author and title. The and-operator & is default and can be omitted.
Chebyshev | Tschebyscheff The or-operator | allows to search for Chebyshev or Tschebyscheff.
"Quasi* map*" py: 1989 The resulting documents have publication year 1989.
so: Eur* J* Mat* Soc* cc: 14 Search for publications in a particular source with a Mathematics Subject Classification code (cc) in 14.
"Partial diff* eq*" ! elliptic The not-operator ! eliminates all results containing the word elliptic.
dt: b & au: Hilbert The document type is set to books; alternatively: j for journal articles, a for book articles.
py: 2000-2015 cc: (94A | 11T) Number ranges are accepted. Terms can be grouped within (parentheses).
la: chinese Find documents in a given language. ISO 639-1 language codes can also be used.

Operators
a & b logic and
a | b logic or
!ab logic not
abc* right wildcard
"ab c" phrase
(ab c) parentheses
Fields
any anywhere an internal document identifier
au author, editor ai internal author identifier
ti title la language
so source ab review, abstract
py publication year rv reviewer
cc MSC code ut uncontrolled term
dt document type (j: journal article; b: book; a: book article)
A joint optimal ordering and delivery policy for an integrated supplier-retailer inventory model with trade credit and defective items. (English) Zbl 1242.90015
Summary: We propose an integrated supplier-retailer inventory model in which both supplier and retailer have adopted trade credit policies, and the retailer receives an arriving lot containing some defective items. The customer’s market demand rate depends on the length of the credit period offered by retailer. Our objective is to determine the retailer’s optimal order cycle length, the order quantity, and the optimal number of shipments per production run from the supplier to the retailer so that the entire supply system has maximum profit. We develop an algorithm to find the optimal solution for the supply chain. Several numerical examples are provided to illustrate the theoretical results, and sensitivity analysis of major parameters including the defective rate in a production batch, the retailer’s trade credit period and the customer’s trade credit period in the model are presented.

MSC:
90B05Inventory, storage, reservoirs
WorldCat.org
Full Text: DOI
References:
[1] Goyal, S. K.: An integrated inventory model for a single supplier -- single customer problem, International journal of production research 15, No. 1, 107-111 (1976)
[2] Monahan, J. P.: A quantity discount pricing model to increase vendor profits, Management science 30, No. 6, 720-726 (1984)
[3] Banerjee, A.: A joint economic-lot-size model for purchaser and vendor, Decision sciences 17, 292-311 (1986)
[4] Goyal, S. K.: A joint economics-lot-size model for purchaser and vendor: a comment, Decision sciences 19, No. 1, 236-241 (1988)
[5] Lu, L.: A one-vendor multi-buyer integrated inventory model, European journal of operational research 81, 312-323 (1995) · Zbl 0927.90005
[6] Goyal, S. K.: A one-vendor multi-buyer integrated inventory model: a comment, European journal of operational research 82, 209-210 (1995) · Zbl 0914.90133 · doi:10.1016/0377-2217(93)E0357-4
[7] Goyal, S. K.; Nebebe, F.: Determination of economic production-shipment policy for a single-vendor-single-buyer system, European journal of operational research 121, 175-178 (2000) · Zbl 0948.91017 · doi:10.1016/S0377-2217(99)00013-2
[8] Ouyang, L. Y.; Wu, K. S.; Ho, C. H.: An integrated vendor-buyer inventory model with quality improvement and lead time reduction, International journal of production economics 108, 349-358 (2007)
[9] Yang, P. C.; Wee, H. M.: A single-vendor and multiple-buyers production-inventory policy for a deteriorating item, European journal of operational research 143, No. 3, 570-581 (2002) · Zbl 1082.90515 · doi:10.1016/S0377-2217(01)00345-9
[10] Yang, P. C.; Wee, H. M.; Yang, H. J.: Global optimal policy for vendor-buyer integrated system with just in time environment, Journal of global optimization 37, No. 4, 505-511 (2007) · Zbl 1198.90045 · doi:10.1007/s10898-006-9058-4
[11] Wee, H. M.; Chung, C. J.: A note on the economic lot size of the integrated vendor-buyer inventory system derived without derivatives, European journal of operational research 177, No. 2, 1289-1293 (2007) · Zbl 1102.90004 · doi:10.1016/j.ejor.2005.11.035
[12] Teng, J. T.; Cardenas-Barron, L. E.; Lou, K. R.: The economic lot size of the integrated vendor-buyer inventory system derived without derivatives: a simple derivation, Applied mathematics and computation 217, 5972-5977 (2011) · Zbl 1237.90030
[13] Porteus, E. L.: Optimal lot sizing, process quality improvement and setup cost reduction, Operations research 34, 137-144 (1986) · Zbl 0591.90043 · doi:10.1287/opre.34.1.137
[14] Rosenblatt, M. J.; Lee, H. L.: Economic production cycles with imperfect production processes, IIE transactions 18, 48-55 (1986)
[15] Paknejad, M. J.; Nasri, F.; Affisco, J. F.: Defective units in a continuous review (s,Q) system, International journal of production research 33, 2767-2777 (1995) · Zbl 0910.90128 · doi:10.1080/00207549508904844
[16] Salameh, M. K.; Jaber, M. Y.: Economic production quantity model for items with imperfect quality, International journal of production economics 64, 59-64 (2000)
[17] Ouyang, L. Y.; Chang, H. C.: Impact of investing in quality improvement on (Q,r, L) model involving imperfect production process, Production planning and control 11, 598-607 (2000)
[18] Chung, K. L.; Hou, K. L.: An optimal production run time with imperfect production process and allowable shortages, Computers & operations research 30, 483-490 (2003) · Zbl 1026.90029 · doi:10.1016/S0305-0548(01)00091-0
[19] Hou, K. L.: Optimal production run length for deterioration production system with a two-state continuous-time Markovian processes under allowable shortages, Journal of the operational research society 56, 346-350 (2005) · Zbl 1114.90030 · doi:10.1057/palgrave.jors.2601792
[20] Rahim, M. A.; Al-Hajailan, W. I.: An optimal production run for an imperfect production process with allowable shortages and time-varying fraction defective rate, International journal of advanced manufacturing technology 27, No. 11-12, 1170-1177 (2006)
[21] Lin, Y. J.: A stochastic periodic review integrated inventory model involving defective items, backorder price discount, and variable lead time, A quarterly journal of operations research 8, No. 3, 281-297 (2010) · Zbl 1201.90013 · doi:10.1007/s10288-010-0124-x
[22] Wee, H. M.; Yu, J.; Chen, M. C.: Optimal inventory model for items with imperfect quality and shortage backordering, Omega 35, No. 1, 7-11 (2007)
[23] Sarkar, B.: An inventory model with reliability in an imperfect production process, Applied mathematics and computation 218, 4881-4891 (2012) · Zbl 1239.90008
[24] Barzoki, M. R.; Jahanbazi, M.; Bijari, M.: Effects of imperfect products on lot sizing with work in process inventory, Applied mathematics and computation 217, 8328-8336 (2011) · Zbl 1231.90051 · doi:10.1016/j.amc.2011.03.023
[25] Haley, C. W.; Higgins, R. C.: Inventory policy and trade credit financing, Management science 20, No. 4, 464-471 (1973) · Zbl 0303.90010 · doi:10.1287/mnsc.20.4.464
[26] Ferris, J. S.: A transactions theory of trade credit use, The quarterly journal of economics 96, No. 2, 243-270 (1981)
[27] Kingsman, B. G.: The effect of payment rules on ordering and stocking in purchasing, Journal of the operational research society 34, No. 11, 1085-1098 (1983)
[28] Goyal, S. K.: Economic order quantity under conditions of permissible delay in payments, Journal of the operational research society 36, 335-339 (1985) · Zbl 0568.90025 · doi:10.2307/2582421
[29] Aggarwal, S. P.; Jaggi, C. K.: Ordering policies of deteriorating items under permissible delay in payments, Journal of the operational research society 46, 658-662 (1995) · Zbl 0830.90032
[30] Jamal, A. M. M.; Sarker, B. R.; Wang, S.: An ordering policy for deteriorating items with allowable shortage and permissible delay in payment, Journal of the operational research society 48, 826-833 (1997) · Zbl 0890.90049
[31] Buzacott, J.; Zhang, R.: Inventory management with asset-based financing, Management science 50, No. 9, 1247-1292 (2004)
[32] Hill, H. C.; Riener, K. D.: Determining the cash discount in the firm’s credit policy, Financial management 8, 68-73 (1979)
[33] Abad, P. L.; Jaggi, C. K.: A joint approach for setting unit price and the length of the credit period for a seller when end demand is price sensitive, International journal of production economics 83, 115-122 (2003)
[34] Chen, L. H.; Kang, F. S.: Integrated vendor-buyer cooperative inventory models with variant permissible delay in payments, European journal of operational research 183, 658-673 (2007) · Zbl 1180.90008 · doi:10.1016/j.ejor.2006.10.035
[35] Huang, Y. F.; Hsu, K. H.: An EOQ model under retailer partial trade credit policy in supply chain, International journal of production economics 112, 655-664 (2008)
[36] Ho, C. H.; Ouyang, L. Y.; Su, C. H.; Pricing, Optimal: Shipment and payment policy for an integrated supplier -- buyer inventory model with two-part trade credit, European journal of operational research 187, 496-510 (2008) · Zbl 1147.90002 · doi:10.1016/j.ejor.2007.04.015
[37] Thangam, A.; Uthayakumar, R.: Two-echelon trade credit financing for perishable items in a supply chain when demand depends on both selling price and credit period, Computers and industrial engineering 57, 773-786 (2009)
[38] Huang, Y. F.: Optimal retailer’s ordering policies in the EOQ model under trade credit financing, Journal of the operational research society 54, No. 9, 1011-1015 (2003) · Zbl 1097.90501 · doi:10.1057/palgrave.jors.2601588
[39] Su, C. H.; Ouyang, L. Y.; Ho, C. H.; Chang, C. T.: Retailer’s inventory policy and supplier’s delivery policy under tow-level trade credit strategy, Asia Pacific journal of operational research 24, No. 5, 613-630 (2007) · Zbl 1162.90322 · doi:10.1142/S0217595907001413
[40] Jaggi, C. K.; Goyal, S. K.; Goel, S. K.: Retailer’s optimal replenishment decisions with credit-linked demand under permissible delay in payments, European journal of operational research 190, 130-135 (2008) · Zbl 1146.90314 · doi:10.1016/j.ejor.2007.05.042
[41] J.T. Teng, K.R. Lou, Seller’s optimal credit period and replenishment time in a supply chain with up-stream and down-stream trade credits, Journal of Global Optimization (in press) doi: 10.1007/s10898-011-9720-3. · Zbl 1260.90027