Kausar, Amrina; Hasan, Ahmad; Maheshwari, Sumit; Gautam, Prerna; Jaggi, Chandra K. Sustainable production model with advertisement and market price dependent demand under salvage option for defectives. (English) Zbl 07814736 Opsearch 61, No. 1, 315-333 (2024). MSC: 90Bxx PDFBibTeX XMLCite \textit{A. Kausar} et al., Opsearch 61, No. 1, 315--333 (2024; Zbl 07814736) Full Text: DOI
Khanna, Aditi; Gautam, Prerna; Hasan, Ahmad; Jaggi, Chandra K. Inventory and pricing decisions for an imperfect production system with quality inspection, rework, and carbon-emissions. (English) Zbl 1474.90017 Yugosl. J. Oper. Res. 30, No. 3, 337-358 (2020). MSC: 90B05 90B30 90B25 91B76 PDFBibTeX XMLCite \textit{A. Khanna} et al., Yugosl. J. Oper. Res. 30, No. 3, 337--358 (2020; Zbl 1474.90017) Full Text: DOI
Saha, Sujata; Chakrabarti, Tripti Two-echelon supply chain model in an imperfect production with stochastic demand considering the rework of the defective items. (English) Zbl 1436.90013 Castillo, Oscar (ed.) et al., Recent advances in intelligent information systems and applied mathematics. Selected papers based on the presentations at the 2nd international conference on information technology and applied mathematics, ICITAM 2019, Haldia Institute of Technology, Haldia, India, March 7–9, 2019. Cham: Springer. Stud. Comput. Intell. 863, 423-433 (2020). MSC: 90B05 PDFBibTeX XMLCite \textit{S. Saha} and \textit{T. Chakrabarti}, Stud. Comput. Intell. 863, 423--433 (2020; Zbl 1436.90013) Full Text: DOI
Taleizadeh, Ata Allah A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering. (English) Zbl 1388.90049 Ann. Oper. Res. 261, No. 1-2, 303-337 (2018). MSC: 90B30 90B05 90B25 PDFBibTeX XMLCite \textit{A. A. Taleizadeh}, Ann. Oper. Res. 261, No. 1--2, 303--337 (2018; Zbl 1388.90049) Full Text: DOI
Taleizadeh, Ata Allah; Wee, Hui-Ming; Jalali-Naini, Seyed Gholamreza Economic production quantity model with repair failure and limited capacity. (English) Zbl 1351.90090 Appl. Math. Modelling 37, No. 5, 2765-2774 (2013). MSC: 90B30 90B25 90B05 PDFBibTeX XMLCite \textit{A. A. Taleizadeh} et al., Appl. Math. Modelling 37, No. 5, 2765--2774 (2013; Zbl 1351.90090) Full Text: DOI
Pal, Brojeswar; Sana, Shib Sankar; Chaudhuri, Kripasindhu Maximising profits for an EPQ model with unreliable machine and rework of random defective items. (English) Zbl 1307.90016 Int. J. Syst. Sci. 44, No. 3, 582-594 (2013). MSC: 90B05 90B25 90B30 PDFBibTeX XMLCite \textit{B. Pal} et al., Int. J. Syst. Sci. 44, No. 3, 582--594 (2013; Zbl 1307.90016) Full Text: DOI
Sarkar, Biswajit An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production. (English) Zbl 1245.90007 Appl. Math. Comput. 218, No. 17, 8295-8308 (2012). MSC: 90B05 PDFBibTeX XMLCite \textit{B. Sarkar}, Appl. Math. Comput. 218, No. 17, 8295--8308 (2012; Zbl 1245.90007) Full Text: DOI
Tsao, Yu-Chung; Chen, Tsung-Hui; Huang, Sheng-Min A production policy considering reworking of imperfect items and trade credit. (English) Zbl 1213.90113 Flex. Serv. Manuf. J. 23, No. 1, 48-63 (2011). MSC: 90B30 90B60 90B05 PDFBibTeX XMLCite \textit{Y.-C. Tsao} et al., Flex. Serv. Manuf. J. 23, No. 1, 48--63 (2011; Zbl 1213.90113) Full Text: DOI
Chiu, Yuan-Shyi Peter; Chen, Kuang-Ku; Cheng, Feng-Tsung; Wu, Mei-Fang Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown. (English) Zbl 1189.90052 Comput. Math. Appl. 59, No. 2, 919-932 (2010). MSC: 90B30 60K10 PDFBibTeX XMLCite \textit{Y.-S. P. Chiu} et al., Comput. Math. Appl. 59, No. 2, 919--932 (2010; Zbl 1189.90052) Full Text: DOI
Taleizadeh, Ata Allah; Niaki, Seyed Taghi Akhavan; Najafi, Amir Abbas Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint. (English) Zbl 1178.90136 J. Comput. Appl. Math. 233, No. 8, 1834-1849 (2010). MSC: 90B30 90B35 PDFBibTeX XMLCite \textit{A. A. Taleizadeh} et al., J. Comput. Appl. Math. 233, No. 8, 1834--1849 (2010; Zbl 1178.90136) Full Text: DOI
Chiu, Singa Wang Robust planning in optimization for production system subject to random machine breakdown and failure in rework. (English) Zbl 1177.90107 Comput. Oper. Res. 37, No. 5, 899-908 (2010). MSC: 90B25 90B30 90B10 PDFBibTeX XMLCite \textit{S. W. Chiu}, Comput. Oper. Res. 37, No. 5, 899--908 (2010; Zbl 1177.90107) Full Text: DOI
Chiu, Singa Wang Production lot size problem with failure in repair and backlogging derived without derivatives. (English) Zbl 1129.90018 Eur. J. Oper. Res. 188, No. 2, 610-615 (2008). MSC: 90B25 90B30 PDFBibTeX XMLCite \textit{S. W. Chiu}, Eur. J. Oper. Res. 188, No. 2, 610--615 (2008; Zbl 1129.90018) Full Text: DOI
Chiu, Singa Wang Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging. (English) Zbl 1164.90010 Appl. Stoch. Models Bus. Ind. 23, No. 2, 165-178 (2007). Reviewer: A. D. Borisenko (Kyïv) MSC: 90B30 PDFBibTeX XMLCite \textit{S. W. Chiu}, Appl. Stoch. Models Bus. Ind. 23, No. 2, 165--178 (2007; Zbl 1164.90010) Full Text: DOI
Chiu, Singa Wang; Wang, Shan-Ling; Chiu, Yuan-Shyi Peter Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. (English) Zbl 1123.90002 Eur. J. Oper. Res. 180, No. 2, 664-676 (2007). MSC: 90B05 90B30 91B70 PDFBibTeX XMLCite \textit{S. W. Chiu} et al., Eur. J. Oper. Res. 180, No. 2, 664--676 (2007; Zbl 1123.90002) Full Text: DOI