Ji, Bin; Sun, Hongjun; Yuan, Xiaohui; Yuan, Yanbin; Wang, Xiaorong Coordinated optimized scheduling of locks and transshipment in inland waterway transportation using binary NSGA-II. (English) Zbl 07767493 Int. Trans. Oper. Res. 27, No. 3, 1501-1525 (2020). MSC: 90-XX PDFBibTeX XMLCite \textit{B. Ji} et al., Int. Trans. Oper. Res. 27, No. 3, 1501--1525 (2020; Zbl 07767493) Full Text: DOI
Yuan, Yanbin; Ji, Bin; Yuan, Xiaohui; Huang, Yuehua Lockage scheduling of three gorges-gezhouba dams by hybrid of chaotic particle swarm optimization and heuristic-adjusted strategies. (English) Zbl 1410.90099 Appl. Math. Comput. 270, 74-89 (2015). MSC: 90B35 90C59 68M20 68T05 PDFBibTeX XMLCite \textit{Y. Yuan} et al., Appl. Math. Comput. 270, 74--89 (2015; Zbl 1410.90099) Full Text: DOI
Dalfard, Vahid Majazi; Mohammadi, Ghorbanali Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints. (English) Zbl 1268.90018 Comput. Math. Appl. 64, No. 6, 2111-2117 (2012). MSC: 90B35 68T05 90C29 PDFBibTeX XMLCite \textit{V. M. Dalfard} and \textit{G. Mohammadi}, Comput. Math. Appl. 64, No. 6, 2111--2117 (2012; Zbl 1268.90018) Full Text: DOI