Liu, Ying; Zhou, Jing; Lim, Andrew; Hu, Qian A tree search heuristic for the resource constrained project scheduling problem with transfer times. (English) Zbl 07594677 Eur. J. Oper. Res. 304, No. 3, 939-951 (2023). MSC: 90Bxx PDF BibTeX XML Cite \textit{Y. Liu} et al., Eur. J. Oper. Res. 304, No. 3, 939--951 (2023; Zbl 07594677) Full Text: DOI OpenURL
Gehring, Marco; Volk, Rebekka; Schultmann, Frank On the integration of diverging material flows into resource-constrained project scheduling. (English) Zbl 07567019 Eur. J. Oper. Res. 303, No. 3, 1071-1087 (2022). MSC: 90Bxx PDF BibTeX XML Cite \textit{M. Gehring} et al., Eur. J. Oper. Res. 303, No. 3, 1071--1087 (2022; Zbl 07567019) Full Text: DOI OpenURL
Watermeyer, Kai; Zimmermann, Jürgen A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints. (English) Zbl 1493.90072 OR Spectrum 44, No. 2, 575-602 (2022). MSC: 90B35 90B50 90C57 PDF BibTeX XML Cite \textit{K. Watermeyer} and \textit{J. Zimmermann}, OR Spectrum 44, No. 2, 575--602 (2022; Zbl 1493.90072) Full Text: DOI OpenURL
Van Eynde, Rob; Vanhoucke, Mario A reduction tree approach for the discrete time/cost trade-off problem. (English) Zbl 07546512 Comput. Oper. Res. 143, Article ID 105750, 20 p. (2022). MSC: 90Bxx PDF BibTeX XML Cite \textit{R. Van Eynde} and \textit{M. Vanhoucke}, Comput. Oper. Res. 143, Article ID 105750, 20 p. (2022; Zbl 07546512) Full Text: DOI OpenURL
Van Eynde, Rob; Vanhoucke, Mario New summary measures and datasets for the multi-project scheduling problem. (English) Zbl 1495.90085 Eur. J. Oper. Res. 299, No. 3, 853-868 (2022). MSC: 90B35 PDF BibTeX XML Cite \textit{R. Van Eynde} and \textit{M. Vanhoucke}, Eur. J. Oper. Res. 299, No. 3, 853--868 (2022; Zbl 1495.90085) Full Text: DOI OpenURL
Yousefzadeh, H. R. Investigating a claim about resource complexity measure. (English) Zbl 1485.90048 Iran. J. Numer. Anal. Optim. 11, No. 2, 401-405 (2021). MSC: 90B35 68M20 PDF BibTeX XML Cite \textit{H. R. Yousefzadeh}, Iran. J. Numer. Anal. Optim. 11, No. 2, 401--405 (2021; Zbl 1485.90048) Full Text: DOI OpenURL
Vanhoucke, Mario; Coelho, José An analysis of network and resource indicators for resource-constrained project scheduling problem instances. (English) Zbl 07485310 Comput. Oper. Res. 132, Article ID 105260, 12 p. (2021). MSC: 90Bxx PDF BibTeX XML Cite \textit{M. Vanhoucke} and \textit{J. Coelho}, Comput. Oper. Res. 132, Article ID 105260, 12 p. (2021; Zbl 07485310) Full Text: DOI OpenURL
Xie, Fang; Li, Haitao; Xu, Zhe An approximate dynamic programming approach to project scheduling with uncertain resource availabilities. (English) Zbl 1481.90194 Appl. Math. Modelling 97, 226-243 (2021). MSC: 90B36 90C39 90C40 PDF BibTeX XML Cite \textit{F. Xie} et al., Appl. Math. Modelling 97, 226--243 (2021; Zbl 1481.90194) Full Text: DOI OpenURL
Snauwaert, Jakob; Vanhoucke, Mario A new algorithm for resource-constrained project scheduling with breadth and depth of skills. (English) Zbl 1487.90324 Eur. J. Oper. Res. 292, No. 1, 43-59 (2021). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{J. Snauwaert} and \textit{M. Vanhoucke}, Eur. J. Oper. Res. 292, No. 1, 43--59 (2021; Zbl 1487.90324) Full Text: DOI OpenURL
Goto, Hiroyuki; Murray, Alan T. Exact and flexible solution approach to a critical chain project management problem. (English) Zbl 1479.90089 Constraints 25, No. 3-4, 280-297 (2020). MSC: 90B35 90C11 90C05 PDF BibTeX XML Cite \textit{H. Goto} and \textit{A. T. Murray}, Constraints 25, No. 3--4, 280--297 (2020; Zbl 1479.90089) Full Text: DOI OpenURL
Coelho, José; Vanhoucke, Mario Going to the core of hard resource-constrained project scheduling instances. (English) Zbl 1458.90278 Comput. Oper. Res. 121, Article ID 104976, 16 p. (2020). MSC: 90B35 PDF BibTeX XML Cite \textit{J. Coelho} and \textit{M. Vanhoucke}, Comput. Oper. Res. 121, Article ID 104976, 16 p. (2020; Zbl 1458.90278) Full Text: DOI Link OpenURL
Gerhards, Patrick The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds. (English) Zbl 1454.90018 OR Spectrum 42, No. 4, 901-933 (2020). MSC: 90B35 91B32 90C11 PDF BibTeX XML Cite \textit{P. Gerhards}, OR Spectrum 42, No. 4, 901--933 (2020; Zbl 1454.90018) Full Text: DOI OpenURL
Watermeyer, Kai; Zimmermann, Jürgen A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints. (English) Zbl 1446.90087 OR Spectrum 42, No. 2, 427-460 (2020). MSC: 90B35 90C57 PDF BibTeX XML Cite \textit{K. Watermeyer} and \textit{J. Zimmermann}, OR Spectrum 42, No. 2, 427--460 (2020; Zbl 1446.90087) Full Text: DOI OpenURL
Erfani, Behrad; Ebrahimnejad, Sadoullah; Moosavi, Amirhossein An integrated dynamic facility layout and job shop scheduling problem: a hybrid NSGA-II and local search algorithm. (English) Zbl 1449.90150 J. Ind. Manag. Optim. 16, No. 4, 1801-1834 (2020). MSC: 90B50 90B80 90B35 PDF BibTeX XML Cite \textit{B. Erfani} et al., J. Ind. Manag. Optim. 16, No. 4, 1801--1834 (2020; Zbl 1449.90150) Full Text: DOI OpenURL
Pellerin, Robert; Perrier, Nathalie; Berthaut, François A survey of hybrid metaheuristics for the resource-constrained project scheduling problem. (English) Zbl 1430.90286 Eur. J. Oper. Res. 280, No. 2, 395-416 (2020). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{R. Pellerin} et al., Eur. J. Oper. Res. 280, No. 2, 395--416 (2020; Zbl 1430.90286) Full Text: DOI OpenURL
Zamani, Reza An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains. (English) Zbl 1425.90054 RAIRO, Oper. Res. 53, No. 4, 1309-1330 (2019). MSC: 90B50 90B35 90B40 90-08 68R05 PDF BibTeX XML Cite \textit{R. Zamani}, RAIRO, Oper. Res. 53, No. 4, 1309--1330 (2019; Zbl 1425.90054) Full Text: DOI OpenURL
Vanhoucke, Mario; Coelho, José Resource-constrained project scheduling with activity splitting and setup times. (English) Zbl 1458.90362 Comput. Oper. Res. 109, 230-249 (2019). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{M. Vanhoucke} and \textit{J. Coelho}, Comput. Oper. Res. 109, 230--249 (2019; Zbl 1458.90362) Full Text: DOI OpenURL
van den Eeckhout, M.; Maenhout, B.; Vanhoucke, M. A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints. (English) Zbl 1458.90361 Comput. Oper. Res. 101, 144-161 (2019). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{M. van den Eeckhout} et al., Comput. Oper. Res. 101, 144--161 (2019; Zbl 1458.90361) Full Text: DOI Link OpenURL
Zou, Xin; Zhang, Lihui; Zhang, Qian A biobjective optimization model for deadline satisfaction in line-of-balance scheduling with work interruptions consideration. (English) Zbl 1427.90167 Math. Probl. Eng. 2018, Article ID 6534021, 12 p. (2018). MSC: 90B35 90C29 90C59 PDF BibTeX XML Cite \textit{X. Zou} et al., Math. Probl. Eng. 2018, Article ID 6534021, 12 p. (2018; Zbl 1427.90167) Full Text: DOI OpenURL
Muritiba, Albert Einstein Fernandes; Rodrigues, Carlos Diego; da Costa, Francíio Araùjo A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem. (English) Zbl 1391.90258 Comput. Oper. Res. 92, 145-154 (2018). MSC: 90B35 90C35 90C60 90C27 PDF BibTeX XML Cite \textit{A. E. F. Muritiba} et al., Comput. Oper. Res. 92, 145--154 (2018; Zbl 1391.90258) Full Text: DOI OpenURL
Dolgui, Alexandre; Kovalev, Sergey; Kovalyov, Mikhail Y.; Malyutin, Sergey; Soukhal, Ameur Optimal workforce assignment to operations of a paced assembly line. (English) Zbl 1380.90150 Eur. J. Oper. Res. 264, No. 1, 200-211 (2018). MSC: 90B70 90B35 90C11 90C59 PDF BibTeX XML Cite \textit{A. Dolgui} et al., Eur. J. Oper. Res. 264, No. 1, 200--211 (2018; Zbl 1380.90150) Full Text: DOI HAL OpenURL
Tritschler, Martin; Naber, Anulark; Kolisch, Rainer A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles. (English) Zbl 1403.90370 Eur. J. Oper. Res. 262, No. 1, 262-273 (2017). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{M. Tritschler} et al., Eur. J. Oper. Res. 262, No. 1, 262--273 (2017; Zbl 1403.90370) Full Text: DOI OpenURL
Verbeeck, Cédric; Van Peteghem, Vincent; Vanhoucke, Mario; Vansteenwegen, Pieter; Aghezzaf, El-Houssaine A metaheuristic solution approach for the time-constrained project scheduling problem. (English) Zbl 1368.90077 OR Spectrum 39, No. 2, 353-371 (2017). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{C. Verbeeck} et al., OR Spectrum 39, No. 2, 353--371 (2017; Zbl 1368.90077) Full Text: DOI Link OpenURL
Zoraghi, Nima; Shahsavar, Aria; Abbasi, Babak; Van Peteghem, Vincent Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies. (English) Zbl 1360.90007 Top 25, No. 1, 49-79 (2017). MSC: 90-02 90B35 90B05 90C11 PDF BibTeX XML Cite \textit{N. Zoraghi} et al., Top 25, No. 1, 49--79 (2017; Zbl 1360.90007) Full Text: DOI OpenURL
Xiao, Jing; Wu, Zhou; Hong, Xi-Xi; Tang, Jian-Chao; Tang, Yong Integration of electromagnetism with multi-objective evolutionary algorithms for RCPSP. (English) Zbl 1346.90398 Eur. J. Oper. Res. 251, No. 1, 22-35 (2016). MSC: 90B35 90C29 90C59 PDF BibTeX XML Cite \textit{J. Xiao} et al., Eur. J. Oper. Res. 251, No. 1, 22--35 (2016; Zbl 1346.90398) Full Text: DOI OpenURL
Baydoun, Georges; Haït, Alain; Pellerin, Robert; Clément, Bernard; Bouvignies, Guillaume A rough-cut capacity planning model with overlapping. (English) Zbl 1339.90017 OR Spectrum 38, No. 2, 335-364 (2016). MSC: 90B05 90C11 PDF BibTeX XML Cite \textit{G. Baydoun} et al., OR Spectrum 38, No. 2, 335--364 (2016; Zbl 1339.90017) Full Text: DOI OpenURL
Schnell, Alexander; Hartl, Richard F. On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations. (English) Zbl 1339.90151 OR Spectrum 38, No. 2, 283-303 (2016). MSC: 90B35 90C57 PDF BibTeX XML Cite \textit{A. Schnell} and \textit{R. F. Hartl}, OR Spectrum 38, No. 2, 283--303 (2016; Zbl 1339.90151) Full Text: DOI OpenURL
Faghih-Mohammadi, Fatemeh; Seifi, Abbas; Khalighi-Sikaroudi, Mohammad A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting. (English) Zbl 1333.90041 RAIRO, Oper. Res. 50, No. 1, 91-118 (2016). MSC: 90B35 68M20 91B32 PDF BibTeX XML Cite \textit{F. Faghih-Mohammadi} et al., RAIRO, Oper. Res. 50, No. 1, 91--118 (2016; Zbl 1333.90041) Full Text: DOI OpenURL
Xiong, Jian; Chen, Yingwu; Zhou, Zhongbao Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations. (English) Zbl 1326.90032 J. Ind. Manag. Optim. 12, No. 2, 719-737 (2016). MSC: 90B35 90B50 68M20 90C31 PDF BibTeX XML Cite \textit{J. Xiong} et al., J. Ind. Manag. Optim. 12, No. 2, 719--737 (2016; Zbl 1326.90032) Full Text: DOI OpenURL
Cheng, Junzilan; Fowler, John; Kempf, Karl; Mason, Scott Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting. (English) Zbl 1348.90348 Comput. Oper. Res. 53, 275-287 (2015). MSC: 90B50 90B35 90C59 PDF BibTeX XML Cite \textit{J. Cheng} et al., Comput. Oper. Res. 53, 275--287 (2015; Zbl 1348.90348) Full Text: DOI OpenURL
Berghman, Lotte; Leus, Roel Practical solutions for a dock assignment problem with trailer transportation. (English) Zbl 1346.90479 Eur. J. Oper. Res. 246, No. 3, 787-799 (2015). MSC: 90B80 90B35 90C10 90C29 90C59 PDF BibTeX XML Cite \textit{L. Berghman} and \textit{R. Leus}, Eur. J. Oper. Res. 246, No. 3, 787--799 (2015; Zbl 1346.90479) Full Text: DOI Link OpenURL
Kellenbrink, Carolin; Helber, Stefan Scheduling resource-constrained projects with a flexible project structure. (English) Zbl 1346.90356 Eur. J. Oper. Res. 246, No. 2, 379-391 (2015). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{C. Kellenbrink} and \textit{S. Helber}, Eur. J. Oper. Res. 246, No. 2, 379--391 (2015; Zbl 1346.90356) Full Text: DOI Link OpenURL
Esenduran, Gökçe; Hall, Nicholas G.; Liu, Zhixin Environmental regulation in project-based industries. (English) Zbl 1315.91051 Nav. Res. Logist. 62, No. 3, 228-247 (2015). MSC: 91B76 90C30 90C90 PDF BibTeX XML Cite \textit{G. Esenduran} et al., Nav. Res. Logist. 62, No. 3, 228--247 (2015; Zbl 1315.91051) Full Text: DOI Link OpenURL
Fu, Fang Integrated scheduling and batch ordering for construction project. (English) Zbl 1427.90139 Appl. Math. Modelling 38, No. 2, 784-797 (2014). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{F. Fu}, Appl. Math. Modelling 38, No. 2, 784--797 (2014; Zbl 1427.90139) Full Text: DOI OpenURL
Naber, Anulark; Kolisch, Rainer MIP models for resource-constrained project scheduling with flexible resource profiles. (English) Zbl 1339.90249 Eur. J. Oper. Res. 239, No. 2, 335-348 (2014). MSC: 90C11 90B35 90C59 PDF BibTeX XML Cite \textit{A. Naber} and \textit{R. Kolisch}, Eur. J. Oper. Res. 239, No. 2, 335--348 (2014; Zbl 1339.90249) Full Text: DOI OpenURL
Messelis, Tommy; De Causmaecker, Patrick An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem. (English) Zbl 1339.90143 Eur. J. Oper. Res. 233, No. 3, 511-528 (2014). MSC: 90B35 90B50 90C27 90C59 90C25 PDF BibTeX XML Cite \textit{T. Messelis} and \textit{P. De Causmaecker}, Eur. J. Oper. Res. 233, No. 3, 511--528 (2014; Zbl 1339.90143) Full Text: DOI Link OpenURL
Van Peteghem, Vincent; Vanhoucke, Mario An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances. (English) Zbl 1305.90203 Eur. J. Oper. Res. 235, No. 1, 62-72 (2014). MSC: 90B35 PDF BibTeX XML Cite \textit{V. Van Peteghem} and \textit{M. Vanhoucke}, Eur. J. Oper. Res. 235, No. 1, 62--72 (2014; Zbl 1305.90203) Full Text: DOI OpenURL
Can, Anıl; Ulusoy, Gündüz Multi-project scheduling with two-stage decomposition. (English) Zbl 1303.90044 Ann. Oper. Res. 217, 95-116 (2014). MSC: 90B35 90C09 PDF BibTeX XML Cite \textit{A. Can} and \textit{G. Ulusoy}, Ann. Oper. Res. 217, 95--116 (2014; Zbl 1303.90044) Full Text: DOI OpenURL
Tian, Wendi; Demeulemeester, Erik Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment. (English) Zbl 1296.90060 Ann. Oper. Res. 213, 271-291 (2014). MSC: 90B35 PDF BibTeX XML Cite \textit{W. Tian} and \textit{E. Demeulemeester}, Ann. Oper. Res. 213, 271--291 (2014; Zbl 1296.90060) Full Text: DOI OpenURL
He, Zhengwen; Wang, Nengmin; Li, Pengxiang Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective. (English) Zbl 1296.90050 Ann. Oper. Res. 213, 203-220 (2014). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{Z. He} et al., Ann. Oper. Res. 213, 203--220 (2014; Zbl 1296.90050) Full Text: DOI OpenURL
Afshar-Nadjafi, Behrouz Resource constrained project scheduling subject to due dates: preemption permitted with penalty. (English) Zbl 1291.90088 Adv. Oper. Res. 2014, Article ID 505716, 10 p. (2014). MSC: 90B35 PDF BibTeX XML Cite \textit{B. Afshar-Nadjafi}, Adv. Oper. Res. 2014, Article ID 505716, 10 p. (2014; Zbl 1291.90088) Full Text: DOI OpenURL
Jia, Qiong; Seo, Yoonho Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation. (English) Zbl 1348.90400 Comput. Oper. Res. 40, No. 8, 2037-2050 (2013). MSC: 90B80 90B35 90C59 PDF BibTeX XML Cite \textit{Q. Jia} and \textit{Y. Seo}, Comput. Oper. Res. 40, No. 8, 2037--2050 (2013; Zbl 1348.90400) Full Text: DOI OpenURL
Otto, Alena; Otto, Christian; Scholl, Armin Systematic data generation and test design for solution algorithms on the example of SALBPGen for assembly line balancing. (English) Zbl 1332.90176 Eur. J. Oper. Res. 228, No. 1, 33-45 (2013). MSC: 90C10 90C27 90-04 PDF BibTeX XML Cite \textit{A. Otto} et al., Eur. J. Oper. Res. 228, No. 1, 33--45 (2013; Zbl 1332.90176) Full Text: DOI OpenURL
Chen, Tinggui; Xiao, Renbin A dynamic intelligent decision approach to dependency modeling of project tasks in complex engineering system optimization. (English) Zbl 1299.90391 Math. Probl. Eng. 2013, Article ID 398123, 12 p. (2013). MSC: 90C59 90C40 90B35 PDF BibTeX XML Cite \textit{T. Chen} and \textit{R. Xiao}, Math. Probl. Eng. 2013, Article ID 398123, 12 p. (2013; Zbl 1299.90391) Full Text: DOI OpenURL
Xiong, Jian; Chen, Ying-Wu; Yang, Ke-Wei; Zhao, Qing-Song; Xing, Li-Ning A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations. (English) Zbl 1264.90188 Math. Probl. Eng. 2012, Article ID 786923, 24 p. (2012). MSC: 90C59 90C29 90B36 PDF BibTeX XML Cite \textit{J. Xiong} et al., Math. Probl. Eng. 2012, Article ID 786923, 24 p. (2012; Zbl 1264.90188) Full Text: DOI OpenURL
Khalilzadeh, Mohammad; Kianfar, Fereydoon; Chaleshtari, Ali Shirzadeh; Shadrokh, Shahram; Ranjbar, Mohammad A modified PSO algorithm for minimizing the total costs of resources in MRCPSP. (English) Zbl 1264.90092 Math. Probl. Eng. 2012, Article ID 365697, 18 p. (2012). MSC: 90B35 90C59 90C11 PDF BibTeX XML Cite \textit{M. Khalilzadeh} et al., Math. Probl. Eng. 2012, Article ID 365697, 18 p. (2012; Zbl 1264.90092) Full Text: DOI OpenURL
Li, Haitao; Womer, Keith Optimizing the supply chain configuration for make-to-order manufacturing. (English) Zbl 1253.90049 Eur. J. Oper. Res. 221, No. 1, 118-128 (2012). MSC: 90B06 90C11 90B30 PDF BibTeX XML Cite \textit{H. Li} and \textit{K. Womer}, Eur. J. Oper. Res. 221, No. 1, 118--128 (2012; Zbl 1253.90049) Full Text: DOI OpenURL
Yakhchali, Siamak Haji A path enumeration approach for the analysis of critical activities in fuzzy networks. (English) Zbl 1250.90040 Inf. Sci. 204, 23-35 (2012). MSC: 90B35 PDF BibTeX XML Cite \textit{S. H. Yakhchali}, Inf. Sci. 204, 23--35 (2012; Zbl 1250.90040) Full Text: DOI OpenURL
Bianco, Lucio; Caramia, Massimiliano An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations. (English) Zbl 1244.90088 Eur. J. Oper. Res. 219, No. 1, 73-85 (2012). MSC: 90B35 90C27 90C57 PDF BibTeX XML Cite \textit{L. Bianco} and \textit{M. Caramia}, Eur. J. Oper. Res. 219, No. 1, 73--85 (2012; Zbl 1244.90088) Full Text: DOI OpenURL
Ju, Chunhua; Chen, Tinggui Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm. (English) Zbl 1244.90092 Discrete Dyn. Nat. Soc. 2012, Article ID 713740, 22 p. (2012). MSC: 90B35 90C59 90-04 PDF BibTeX XML Cite \textit{C. Ju} and \textit{T. Chen}, Discrete Dyn. Nat. Soc. 2012, Article ID 713740, 22 p. (2012; Zbl 1244.90092) Full Text: DOI OpenURL
Correia, Isabel; Lourenço, Lídia Lampreia; Saldanha-da-Gama, Francisco Project scheduling with flexible resources: formulation and inequalities. (English) Zbl 1244.90091 OR Spectrum 34, No. 3, 635-663 (2012). MSC: 90B35 90C11 PDF BibTeX XML Cite \textit{I. Correia} et al., OR Spectrum 34, No. 3, 635--663 (2012; Zbl 1244.90091) Full Text: DOI OpenURL
Homberger, Jörg A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling. (English) Zbl 1238.90065 OR Spectrum 34, No. 1, 107-132 (2012). MSC: 90B35 PDF BibTeX XML Cite \textit{J. Homberger}, OR Spectrum 34, No. 1, 107--132 (2012; Zbl 1238.90065) Full Text: DOI OpenURL
Coelho, José; Vanhoucke, Mario Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers. (English) Zbl 1237.90086 Eur. J. Oper. Res. 213, No. 1, 73-82 (2011). MSC: 90B35 PDF BibTeX XML Cite \textit{J. Coelho} and \textit{M. Vanhoucke}, Eur. J. Oper. Res. 213, No. 1, 73--82 (2011; Zbl 1237.90086) Full Text: DOI Link OpenURL
Van Peteghem, Vincent; Vanhoucke, Mario Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem. (English) Zbl 1237.90100 J. Heuristics 17, No. 6, 705-728 (2011). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{V. Van Peteghem} and \textit{M. Vanhoucke}, J. Heuristics 17, No. 6, 705--728 (2011; Zbl 1237.90100) Full Text: DOI OpenURL
Bendavid, Illana; Golany, Boaz Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology. (English) Zbl 1233.90179 Ann. Oper. Res. 189, 25-42 (2011). MSC: 90B36 PDF BibTeX XML Cite \textit{I. Bendavid} and \textit{B. Golany}, Ann. Oper. Res. 189, 25--42 (2011; Zbl 1233.90179) Full Text: DOI OpenURL
Bendavid, Illana; Golany, Boaz Predetermined intervals for start times of activities in the stochastic project scheduling problem. (English) Zbl 1233.90178 Ann. Oper. Res. 186, 429-442 (2011). MSC: 90B36 PDF BibTeX XML Cite \textit{I. Bendavid} and \textit{B. Golany}, Ann. Oper. Res. 186, 429--442 (2011; Zbl 1233.90178) Full Text: DOI OpenURL
Lim, Andrew; Ma, Hong; Rodrigues, Brian; Tan, Sun Teck; Xiao, Fei New concepts for activity float in resource-constrained project management. (English) Zbl 1205.90160 Comput. Oper. Res. 38, No. 6, 917-930 (2011). MSC: 90B50 90C59 PDF BibTeX XML Cite \textit{A. Lim} et al., Comput. Oper. Res. 38, No. 6, 917--930 (2011; Zbl 1205.90160) Full Text: DOI OpenURL
Węglarz, Jan; Józefowska, Joanna; Mika, Marek; Waligóra, Grzegorz Project scheduling with finite or infinite number of activity processing modes – a survey. (English) Zbl 1208.90082 Eur. J. Oper. Res. 208, No. 3, 177-205 (2011). MSC: 90B35 90-02 PDF BibTeX XML Cite \textit{J. Węglarz} et al., Eur. J. Oper. Res. 208, No. 3, 177--205 (2011; Zbl 1208.90082) Full Text: DOI OpenURL
Hurink, J. L.; Kok, A. L.; Paulus, J. J.; Schutten, J. M. J. Time-constrained project scheduling with adjacent resources. (English) Zbl 1231.90198 Comput. Oper. Res. 38, No. 1, 310-319 (2011). MSC: 90B35 PDF BibTeX XML Cite \textit{J. L. Hurink} et al., Comput. Oper. Res. 38, No. 1, 310--319 (2011; Zbl 1231.90198) Full Text: DOI Link OpenURL
Ballestín, Francisco; Blanco, Rosa Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems. (English) Zbl 1231.90173 Comput. Oper. Res. 38, No. 1, 51-62 (2011). MSC: 90B35 90C59 90C29 PDF BibTeX XML Cite \textit{F. Ballestín} and \textit{R. Blanco}, Comput. Oper. Res. 38, No. 1, 51--62 (2011; Zbl 1231.90173) Full Text: DOI OpenURL
Koné, Oumar; Artigues, Christian; Lopez, Pierre; Mongeau, Marcel Event-based MILP models for resource-constrained project scheduling problems. (English) Zbl 1231.90202 Comput. Oper. Res. 38, No. 1, 3-13 (2011). MSC: 90B35 90C11 PDF BibTeX XML Cite \textit{O. Koné} et al., Comput. Oper. Res. 38, No. 1, 3--13 (2011; Zbl 1231.90202) Full Text: DOI OpenURL
Horbach, Andrei A Boolean satisfiability approach to the resource-constrained project scheduling problem. (English) Zbl 1209.90170 Ann. Oper. Res. 181, 89-107 (2010). MSC: 90B35 PDF BibTeX XML Cite \textit{A. Horbach}, Ann. Oper. Res. 181, 89--107 (2010; Zbl 1209.90170) Full Text: DOI Link OpenURL
Kuster, Jürgen; Jannach, Dietmar; Friedrich, Gerhard Applying local rescheduling in response to schedule disruptions. (English) Zbl 1202.90136 Ann. Oper. Res. 180, 265-282 (2010). MSC: 90B35 PDF BibTeX XML Cite \textit{J. Kuster} et al., Ann. Oper. Res. 180, 265--282 (2010; Zbl 1202.90136) Full Text: DOI OpenURL
Hadjiconstantinou, Eleni; Klerides, Evelina A new path-based cutting plane approach for the discrete time-cost tradeoff problem. (English) Zbl 1194.90039 Comput. Manag. Sci. 7, No. 3, 313-336 (2010). MSC: 90B35 90B10 90C57 PDF BibTeX XML Cite \textit{E. Hadjiconstantinou} and \textit{E. Klerides}, Comput. Manag. Sci. 7, No. 3, 313--336 (2010; Zbl 1194.90039) Full Text: DOI OpenURL
Hartmann, Sönke; Briskorn, Dirk A survey of variants and extensions of the resource-constrained project scheduling problem. (English) Zbl 1205.90123 Eur. J. Oper. Res. 207, No. 1, 1-14 (2010). MSC: 90B35 PDF BibTeX XML Cite \textit{S. Hartmann} and \textit{D. Briskorn}, Eur. J. Oper. Res. 207, No. 1, 1--14 (2010; Zbl 1205.90123) Full Text: DOI Link OpenURL
Yakhchali, Siamak Haji; Ghodsypour, Seyed Hassan On the latest starting times and criticality of activities in a network with imprecise durations. (English) Zbl 1193.90118 Appl. Math. Modelling 34, No. 8, 2044-2058 (2010). MSC: 90B35 90C70 PDF BibTeX XML Cite \textit{S. H. Yakhchali} and \textit{S. H. Ghodsypour}, Appl. Math. Modelling 34, No. 8, 2044--2058 (2010; Zbl 1193.90118) Full Text: DOI OpenURL
Rodrigues, Sávio B.; Yamashita, Denise S. An exact algorithm for minimizing resource availability costs in project scheduling. (English) Zbl 1188.90108 Eur. J. Oper. Res. 206, No. 3, 562-568 (2010). MSC: 90B35 PDF BibTeX XML Cite \textit{S. B. Rodrigues} and \textit{D. S. Yamashita}, Eur. J. Oper. Res. 206, No. 3, 562--568 (2010; Zbl 1188.90108) Full Text: DOI OpenURL
Browning, Tyson R.; Yassine, Ali A. A random generator of resource-constrained multi-project network problems. (English) Zbl 1184.90029 J. Sched. 13, No. 2, 143-161 (2010). MSC: 90B15 90B36 PDF BibTeX XML Cite \textit{T. R. Browning} and \textit{A. A. Yassine}, J. Sched. 13, No. 2, 143--161 (2010; Zbl 1184.90029) Full Text: DOI OpenURL
Krüger, Doreen; Scholl, Armin Managing and modelling general resource transfers in (multi-)project scheduling. (English) Zbl 1183.90177 OR Spectrum 32, No. 2, 369-394 (2010). MSC: 90B35 90C27 PDF BibTeX XML Cite \textit{D. Krüger} and \textit{A. Scholl}, OR Spectrum 32, No. 2, 369--394 (2010; Zbl 1183.90177) Full Text: DOI Link OpenURL
van Peteghem, Vincent; Vanhoucke, Mario A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem. (English) Zbl 1175.90205 Eur. J. Oper. Res. 201, No. 2, 409-418 (2010). MSC: 90B35 PDF BibTeX XML Cite \textit{V. van Peteghem} and \textit{M. Vanhoucke}, Eur. J. Oper. Res. 201, No. 2, 409--418 (2010; Zbl 1175.90205) Full Text: DOI OpenURL
Bendavid, Illana; Golany, Boaz Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology. (English) Zbl 1181.90134 Ann. Oper. Res. 172, 259-276 (2009). MSC: 90B36 PDF BibTeX XML Cite \textit{I. Bendavid} and \textit{B. Golany}, Ann. Oper. Res. 172, 259--276 (2009; Zbl 1181.90134) Full Text: DOI OpenURL
He, Zhengwen; Wang, Nengmin; Jia, Tao; Xu, Yu Simulated annealing and tabu search for multi-mode project payment scheduling. (English) Zbl 1176.90260 Eur. J. Oper. Res. 198, No. 3, 688-696 (2009). MSC: 90B36 PDF BibTeX XML Cite \textit{Z. He} et al., Eur. J. Oper. Res. 198, No. 3, 688--696 (2009; Zbl 1176.90260) Full Text: DOI OpenURL
Boschetti, Marco; Maniezzo, Vittorio Benders decomposition, Lagrangean relaxation and metaheuristic design. (English) Zbl 1176.90485 J. Heuristics 15, No. 3, 283-312 (2009). MSC: 90C27 90C59 PDF BibTeX XML Cite \textit{M. Boschetti} and \textit{V. Maniezzo}, J. Heuristics 15, No. 3, 283--312 (2009; Zbl 1176.90485) Full Text: DOI OpenURL
Ballestín, Francisco; Valls, Vicente; Quintanilla, Sacramento Scheduling projects with limited number of preemptions. (English) Zbl 1162.90442 Comput. Oper. Res. 36, No. 11, 2913-2925 (2009). MSC: 90B35 PDF BibTeX XML Cite \textit{F. Ballestín} et al., Comput. Oper. Res. 36, No. 11, 2913--2925 (2009; Zbl 1162.90442) Full Text: DOI OpenURL
Krüger, Doreen; Scholl, Armin A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times. (English) Zbl 1159.90461 Eur. J. Oper. Res. 197, No. 2, 492-508 (2009). MSC: 90C10 90C27 PDF BibTeX XML Cite \textit{D. Krüger} and \textit{A. Scholl}, Eur. J. Oper. Res. 197, No. 2, 492--508 (2009; Zbl 1159.90461) Full Text: DOI Link OpenURL
Kavlak, Nursel; Ulusoy, Gündüz; Şerifoğlu, Funda Sivrikaya; Birbil, İlker Client-contractor bargaining on net present value in project scheduling with limited resources. (English) Zbl 1158.90349 Nav. Res. Logist. 56, No. 2, 93-112 (2009). MSC: 90B35 PDF BibTeX XML Cite \textit{N. Kavlak} et al., Nav. Res. Logist. 56, No. 2, 93--112 (2009; Zbl 1158.90349) Full Text: DOI OpenURL
Damak, N.; Jarboui, B.; Siarry, P.; Loukil, T. Differential evolution for solving multi-mode resource-constrained project scheduling problems. (English) Zbl 1179.90134 Comput. Oper. Res. 36, No. 9, 2653-2659 (2009). MSC: 90B35 90B50 PDF BibTeX XML Cite \textit{N. Damak} et al., Comput. Oper. Res. 36, No. 9, 2653--2659 (2009; Zbl 1179.90134) Full Text: DOI OpenURL
Chen, Jiaqiong; Askin, Ronald G. Project selection, scheduling and resource allocation with time dependent returns. (English) Zbl 1152.90483 Eur. J. Oper. Res. 193, No. 1, 23-34 (2009). MSC: 90B50 90B35 91B32 PDF BibTeX XML Cite \textit{J. Chen} and \textit{R. G. Askin}, Eur. J. Oper. Res. 193, No. 1, 23--34 (2009; Zbl 1152.90483) Full Text: DOI OpenURL
Mendes, J. J. M.; Gonçalves, J. F.; Resende, M. G. C. A random key based genetic algorithm for the resource constrained project scheduling problem. (English) Zbl 1163.90500 Comput. Oper. Res. 36, No. 1, 92-109 (2009). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{J. J. M. Mendes} et al., Comput. Oper. Res. 36, No. 1, 92--109 (2009; Zbl 1163.90500) Full Text: DOI Link OpenURL
Guldemond, T. A.; Hurink, J. L.; Paulus, J. J.; Schutten, J. M. J. Time-constrained project scheduling. (English) Zbl 1168.90442 J. Sched. 11, No. 2, 137-148 (2008). MSC: 90B35 PDF BibTeX XML Cite \textit{T. A. Guldemond} et al., J. Sched. 11, No. 2, 137--148 (2008; Zbl 1168.90442) Full Text: DOI OpenURL
Quilliot, Alain Preemptive scheduling and antichain polyhedra. (English) Zbl 1155.90356 Discrete Appl. Math. 156, No. 17, 3267-3275 (2008). MSC: 90B22 90C27 90C05 05C65 PDF BibTeX XML Cite \textit{A. Quilliot}, Discrete Appl. Math. 156, No. 17, 3267--3275 (2008; Zbl 1155.90356) Full Text: DOI OpenURL
Ballestín, Francisco; Trautmann, Norbert An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem. (English) Zbl 1154.90353 Int. J. Prod. Res. 46, No. 22, 6231-6249 (2008). MSC: 90B30 PDF BibTeX XML Cite \textit{F. Ballestín} and \textit{N. Trautmann}, Int. J. Prod. Res. 46, No. 22, 6231--6249 (2008; Zbl 1154.90353) Full Text: DOI OpenURL
Damay, Jean; Quilliot, Alain; Sanlaville, Eric Polyhedral reformulation of a scheduling problem and related theoretical results. (English) Zbl 1152.90437 RAIRO, Oper. Res. 42, No. 3, 325-359 (2008). MSC: 90B35 90C05 PDF BibTeX XML Cite \textit{J. Damay} et al., RAIRO, Oper. Res. 42, No. 3, 325--359 (2008; Zbl 1152.90437) Full Text: DOI EuDML Link OpenURL
Moumene, Khaled; Ferland, Jacques A. New representation to reduce the search space for the resource-constrained project scheduling problem. (English) Zbl 1154.90476 RAIRO, Oper. Res. 42, No. 2, 215-228 (2008). MSC: 90B35 PDF BibTeX XML Cite \textit{K. Moumene} and \textit{J. A. Ferland}, RAIRO, Oper. Res. 42, No. 2, 215--228 (2008; Zbl 1154.90476) Full Text: DOI EuDML OpenURL
Sabzehparvar, Majid; Seyed-Hosseini, S. Mohammad A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags. (English) Zbl 1187.90143 J. Supercomput. 44, No. 3, 257-273 (2008). MSC: 90B35 90C27 90-08 68W30 PDF BibTeX XML Cite \textit{M. Sabzehparvar} and \textit{S. M. Seyed-Hosseini}, J. Supercomput. 44, No. 3, 257--273 (2008; Zbl 1187.90143) Full Text: DOI OpenURL
Alvarez-Valdes, R.; Crespo, E.; Tamarit, J. M.; Villa, F. GRASP and path relinking for project scheduling under partially renewable resources. (English) Zbl 1146.90401 Eur. J. Oper. Res. 189, No. 3, 1153-1170 (2008). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{R. Alvarez-Valdes} et al., Eur. J. Oper. Res. 189, No. 3, 1153--1170 (2008; Zbl 1146.90401) Full Text: DOI OpenURL
Ballestín, Francisco; Valls, Vicente; Quintanilla, Sacramento Pre-emption in resource-constrained project scheduling. (English) Zbl 1146.90403 Eur. J. Oper. Res. 189, No. 3, 1136-1152 (2008). MSC: 90B35 PDF BibTeX XML Cite \textit{F. Ballestín} et al., Eur. J. Oper. Res. 189, No. 3, 1136--1152 (2008; Zbl 1146.90403) Full Text: DOI OpenURL
Jarboui, B.; Damak, N.; Siarry, P.; Rebai, A. A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems. (English) Zbl 1180.90125 Appl. Math. Comput. 195, No. 1, 299-308 (2008). MSC: 90B35 90C59 90C27 PDF BibTeX XML Cite \textit{B. Jarboui} et al., Appl. Math. Comput. 195, No. 1, 299--308 (2008; Zbl 1180.90125) Full Text: DOI OpenURL
Mika, Marek; Waligóra, Grzegorz; Węglarz, Jan Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times. (English) Zbl 1137.90508 Eur. J. Oper. Res. 187, No. 3, 1238-1250 (2008). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{M. Mika} et al., Eur. J. Oper. Res. 187, No. 3, 1238--1250 (2008; Zbl 1137.90508) Full Text: DOI OpenURL
Vanhoucke, Mario; Coelho, José; Debels, Dieter; Maenhout, Broos; Tavares, Luís V. An evaluation of the adequacy of project network generators with systematically sampled networks. (English) Zbl 1149.90066 Eur. J. Oper. Res. 187, No. 2, 511-524 (2008). MSC: 90B36 90B10 PDF BibTeX XML Cite \textit{M. Vanhoucke} et al., Eur. J. Oper. Res. 187, No. 2, 511--524 (2008; Zbl 1149.90066) Full Text: DOI OpenURL
Valls, Vicente; Ballestín, Francisco; Quintanilla, Sacramento A hybrid genetic algorithm for the resource-constrained project scheduling problem. (English) Zbl 1137.90526 Eur. J. Oper. Res. 185, No. 2, 495-508 (2008). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{V. Valls} et al., Eur. J. Oper. Res. 185, No. 2, 495--508 (2008; Zbl 1137.90526) Full Text: DOI OpenURL
Vanhoucke, Mario; Debels, Dieter The discrete time/cost trade-off problem: Extensions and heuristic procedures. (English) Zbl 1168.90475 J. Sched. 10, No. 4-5, 311-326 (2007). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{M. Vanhoucke} and \textit{D. Debels}, J. Sched. 10, No. 4--5, 311--326 (2007; Zbl 1168.90475) Full Text: DOI OpenURL
Zhu, Guidong; Bard, Jonathan F.; Yu, Gang A two-stage stochastic programming approach for project planning with uncertain activity durations. (English) Zbl 1168.90570 J. Sched. 10, No. 3, 167-180 (2007). MSC: 90C15 90C59 90B36 PDF BibTeX XML Cite \textit{G. Zhu} et al., J. Sched. 10, No. 3, 167--180 (2007; Zbl 1168.90570) Full Text: DOI OpenURL
Ballestín, Francisco When it is worthwhile to work with the stochastic RCPSP? (English) Zbl 1168.90486 J. Sched. 10, No. 3, 153-166 (2007). MSC: 90B36 90B50 90C59 PDF BibTeX XML Cite \textit{F. Ballestín}, J. Sched. 10, No. 3, 153--166 (2007; Zbl 1168.90486) Full Text: DOI OpenURL
Bouffard, Véronique; Ferland, Jacques A. Improving simulated annealing with variable neighborhood search to solve the resource-constrained scheduling problem. (English) Zbl 1153.90415 J. Sched. 10, No. 6, 375-386 (2007). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{V. Bouffard} and \textit{J. A. Ferland}, J. Sched. 10, No. 6, 375--386 (2007; Zbl 1153.90415) Full Text: DOI OpenURL
Tareghian, Hamed R.; Taheri, Seyyed Hassan A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search. (English) Zbl 1227.90019 Appl. Math. Comput. 190, No. 2, 1136-1145 (2007). MSC: 90B50 90C35 90C59 PDF BibTeX XML Cite \textit{H. R. Tareghian} and \textit{S. H. Taheri}, Appl. Math. Comput. 190, No. 2, 1136--1145 (2007; Zbl 1227.90019) Full Text: DOI OpenURL
Lancaster, John; Ozbayrak, Mustafa Evolutionary algorithms applied to project scheduling problems - a survey of the state-of-the-art. (English) Zbl 1141.90430 Int. J. Prod. Res. 45, No. 2, 425-450 (2007). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{J. Lancaster} and \textit{M. Ozbayrak}, Int. J. Prod. Res. 45, No. 2, 425--450 (2007; Zbl 1141.90430) Full Text: DOI OpenURL
Shadrokh, Shahram; Kianfar, Fereydoon A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty. (English) Zbl 1121.90062 Eur. J. Oper. Res. 181, No. 1, 86-101 (2007). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{S. Shadrokh} and \textit{F. Kianfar}, Eur. J. Oper. Res. 181, No. 1, 86--101 (2007; Zbl 1121.90062) Full Text: DOI OpenURL
Buddhakulsomsiri, Jirachai; Kim, David S. Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting. (English) Zbl 1107.90015 Eur. J. Oper. Res. 178, No. 2, 374-390 (2007); corrigendum ibid. 240, No. 2, 602 (2015). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{J. Buddhakulsomsiri} and \textit{D. S. Kim}, Eur. J. Oper. Res. 178, No. 2, 374--390 (2007; Zbl 1107.90015) Full Text: DOI OpenURL
Kimms, Alf; Müller-Bungart, Michael Simulation of stochastic demand data streams for network revenue management problems. (English) Zbl 1144.90413 OR Spectrum 29, No. 1, 5-20 (2007). MSC: 90B50 90B18 PDF BibTeX XML Cite \textit{A. Kimms} and \textit{M. Müller-Bungart}, OR Spectrum 29, No. 1, 5--20 (2007; Zbl 1144.90413) Full Text: DOI OpenURL