Neumann, Klaus; Schwindt, Christoph; Trautmann, Norbert Scheduling of continuous and discontinuous material flows with intermediate storage restrictions. (English) Zbl 1066.90036 Eur. J. Oper. Res. 165, No. 2, 495-509 (2005). MSC: 90B35 90B30 PDFBibTeX XMLCite \textit{K. Neumann} et al., Eur. J. Oper. Res. 165, No. 2, 495--509 (2005; Zbl 1066.90036) Full Text: DOI
Neumann, K.; Schwindt, C.; Zimmermann, J. Order-based neighborhoods for project scheduling with nonregular objective functions. (English) Zbl 1040.90018 Eur. J. Oper. Res. 149, No. 2, 325-343 (2003). Reviewer: Sigrid Knust (Osnabrück) MSC: 90B35 PDFBibTeX XMLCite \textit{K. Neumann} et al., Eur. J. Oper. Res. 149, No. 2, 325--343 (2003; Zbl 1040.90018) Full Text: DOI
Neumann, K.; Zimmermann, J. Resource levelling for projects with schedule-dependent time windows. (English) Zbl 0937.90034 Eur. J. Oper. Res. 117, No. 3, 591-605 (1999). MSC: 90B35 90B50 PDFBibTeX XMLCite \textit{K. Neumann} and \textit{J. Zimmermann}, Eur. J. Oper. Res. 117, No. 3, 591--605 (1999; Zbl 0937.90034) Full Text: DOI
Brucker, Peter; Drexl, Andreas; Möhring, Rolf; Neumann, Klaus; Pesch, Erwin Resource-constrained project scheduling: Notation, classification, models, and methods. (English) Zbl 0937.90030 Eur. J. Oper. Res. 112, No. 1, 3-41 (1999). MSC: 90B35 PDFBibTeX XMLCite \textit{P. Brucker} et al., Eur. J. Oper. Res. 112, No. 1, 3--41 (1999; Zbl 0937.90030) Full Text: DOI
Franck, Birger; Neumann, Klaus; Schwindt, Christoph A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods. (English) Zbl 0888.90079 OR Spektrum 19, No. 2, 77-85 (1997). MSC: 90B30 90B35 PDFBibTeX XMLCite \textit{B. Franck} et al., OR Spektrum 19, No. 2, 77--85 (1997; Zbl 0888.90079) Full Text: DOI