Berterottière, Lucas; Dauzère-Pérès, Stéphane; Yugma, Claude Flexible job-shop scheduling with transportation resources. (English) Zbl 07765828 Eur. J. Oper. Res. 312, No. 3, 890-909 (2024). MSC: 90Bxx PDFBibTeX XMLCite \textit{L. Berterottière} et al., Eur. J. Oper. Res. 312, No. 3, 890--909 (2024; Zbl 07765828) Full Text: DOI
Tamssaouet, Karim; Dauzère-Pérès, Stéphane A general efficient neighborhood structure framework for the job-shop and flexible job-shop scheduling problems. (English) Zbl 07737880 Eur. J. Oper. Res. 311, No. 2, 455-471 (2023). MSC: 90Bxx PDFBibTeX XMLCite \textit{K. Tamssaouet} and \textit{S. Dauzère-Pérès}, Eur. J. Oper. Res. 311, No. 2, 455--471 (2023; Zbl 07737880) Full Text: DOI
Shen, Liji; Dauzère-Pérès, Stéphane; Maecker, Söhnke Energy cost efficient scheduling in flexible job-shop manufacturing systems. (English) Zbl 07709898 Eur. J. Oper. Res. 310, No. 3, 992-1016 (2023). MSC: 90Bxx PDFBibTeX XMLCite \textit{L. Shen} et al., Eur. J. Oper. Res. 310, No. 3, 992--1016 (2023; Zbl 07709898) Full Text: DOI
Akartunalı, Kerem; Dauzère-Pérès, Stéphane Dynamic lot sizing with stochastic demand timing. (English) Zbl 1507.90005 Eur. J. Oper. Res. 302, No. 1, 221-229 (2022). MSC: 90B05 90B30 90C15 90C39 PDFBibTeX XMLCite \textit{K. Akartunalı} and \textit{S. Dauzère-Pérès}, Eur. J. Oper. Res. 302, No. 1, 221--229 (2022; Zbl 1507.90005) Full Text: DOI
Charles, Mehdi; Dauzère-Pérès, Stéphane; Kedad-Sidhoum, Safia; Mazhoud, Issam Motivations and analysis of the capacitated lot-sizing problem with setup times and minimum and maximum ending inventories. (English) Zbl 1507.90006 Eur. J. Oper. Res. 302, No. 1, 203-220 (2022). MSC: 90B05 90B30 90C59 PDFBibTeX XMLCite \textit{M. Charles} et al., Eur. J. Oper. Res. 302, No. 1, 203--220 (2022; Zbl 1507.90006) Full Text: DOI
Beraudy, Sébastien; Absi, Nabil; Dauzère-Pérès, Stéphane Timed route approaches for large multi-product multi-step capacitated production planning problems. (English) Zbl 1495.90063 Eur. J. Oper. Res. 300, No. 2, 602-614 (2022). MSC: 90B30 90B35 PDFBibTeX XMLCite \textit{S. Beraudy} et al., Eur. J. Oper. Res. 300, No. 2, 602--614 (2022; Zbl 1495.90063) Full Text: DOI
Shen, Liji; Dauzère-Pérès, Stéphane; Neufeld, Janis S. Corrigendum to: “Solving the flexible job shop scheduling problem with sequence-dependent setup times”. (English) Zbl 1490.90135 Eur. J. Oper. Res. 296, No. 2, 748 (2022). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{L. Shen} et al., Eur. J. Oper. Res. 296, No. 2, 748 (2022; Zbl 1490.90135) Full Text: DOI
Tamssaouet, Karim; Dauzère-Pérès, Stéphane; Knopp, Sebastian; Bitar, Abdoul; Yugma, Claude Multiobjective optimization for complex flexible job-shop scheduling problems. (English) Zbl 1487.90329 Eur. J. Oper. Res. 296, No. 1, 87-100 (2022). MSC: 90B35 90C29 90C59 PDFBibTeX XMLCite \textit{K. Tamssaouet} et al., Eur. J. Oper. Res. 296, No. 1, 87--100 (2022; Zbl 1487.90329) Full Text: DOI
Altazin, Estelle; Dauzère-Pérès, Stéphane; Ramond, François; Tréfond, Sabine A multi-objective optimization-simulation approach for real time rescheduling in dense railway systems. (English) Zbl 1443.90172 Eur. J. Oper. Res. 286, No. 2, 662-672 (2020). MSC: 90B35 90B06 PDFBibTeX XMLCite \textit{E. Altazin} et al., Eur. J. Oper. Res. 286, No. 2, 662--672 (2020; Zbl 1443.90172) Full Text: DOI
Dauzère-Pérès, Stéphane; Hassoun, Michael On the importance of variability when managing metrology capacity. (English) Zbl 1430.90189 Eur. J. Oper. Res. 282, No. 1, 267-276 (2020). MSC: 90B22 90B30 PDFBibTeX XMLCite \textit{S. Dauzère-Pérès} and \textit{M. Hassoun}, Eur. J. Oper. Res. 282, No. 1, 267--276 (2020; Zbl 1430.90189) Full Text: DOI
Christ, Quentin; Dauzère-Pérès, Stéphane; Lepelletier, Guillaume An iterated min-max procedure for practical workload balancing on non-identical parallel machines in manufacturing systems. (English) Zbl 1430.90227 Eur. J. Oper. Res. 279, No. 2, 419-428 (2019). MSC: 90B30 90B35 90C05 PDFBibTeX XMLCite \textit{Q. Christ} et al., Eur. J. Oper. Res. 279, No. 2, 419--428 (2019; Zbl 1430.90227) Full Text: DOI
Engebrethsen, Erna; Dauzère-Pérès, Stéphane Transportation mode selection in inventory models: a literature review. (English) Zbl 1430.90016 Eur. J. Oper. Res. 279, No. 1, 1-25 (2019). MSC: 90B05 90B06 PDFBibTeX XMLCite \textit{E. Engebrethsen} and \textit{S. Dauzère-Pérès}, Eur. J. Oper. Res. 279, No. 1, 1--25 (2019; Zbl 1430.90016) Full Text: DOI
Absi, Nabil; Archetti, Claudia; Dauzère-Pérès, Stéphane; Feillet, Dominique; Speranza, M. Grazia Comparing sequential and integrated approaches for the production routing problem. (English) Zbl 1388.90048 Eur. J. Oper. Res. 269, No. 2, 633-646 (2018). MSC: 90B30 90B06 90B05 90C26 PDFBibTeX XMLCite \textit{N. Absi} et al., Eur. J. Oper. Res. 269, No. 2, 633--646 (2018; Zbl 1388.90048) Full Text: DOI
Shen, Liji; Dauzère-Pérès, Stéphane; Neufeld, Janis S. Solving the flexible job shop scheduling problem with sequence-dependent setup times. (English) Zbl 1374.90171 Eur. J. Oper. Res. 265, No. 2, 503-516 (2018); corrigendum ibid. 296, No. 2, 748 (2022). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{L. Shen} et al., Eur. J. Oper. Res. 265, No. 2, 503--516 (2018; Zbl 1374.90171) Full Text: DOI
Knopp, Sebastian; Dauzère-Pérès, Stéphane; Yugma, Claude A batch-oblivious approach for complex job-shop scheduling problems. (English) Zbl 1380.90119 Eur. J. Oper. Res. 263, No. 1, 50-61 (2017). MSC: 90B35 90C59 90C90 PDFBibTeX XMLCite \textit{S. Knopp} et al., Eur. J. Oper. Res. 263, No. 1, 50--61 (2017; Zbl 1380.90119) Full Text: DOI
Brahimi, Nadjib; Absi, Nabil; Dauzère-Pérès, Stéphane; Nordli, Atle Single-item dynamic lot-sizing problems: an updated survey. (English) Zbl 1380.90010 Eur. J. Oper. Res. 263, No. 3, 838-863 (2017). MSC: 90B05 PDFBibTeX XMLCite \textit{N. Brahimi} et al., Eur. J. Oper. Res. 263, No. 3, 838--863 (2017; Zbl 1380.90010) Full Text: DOI Link
Absi, Nabil; Dauzère-Pérès, Stéphane; Kedad-Sidhoum, Safia; Penz, Bernard; Rapine, Christophe The single-item green lot-sizing problem with fixed carbon emissions. (English) Zbl 1347.90002 Eur. J. Oper. Res. 248, No. 3, 849-855 (2016). MSC: 90B05 90C11 90C60 90C39 PDFBibTeX XMLCite \textit{N. Absi} et al., Eur. J. Oper. Res. 248, No. 3, 849--855 (2016; Zbl 1347.90002) Full Text: DOI
Wolosewicz, Cathy; Dauzère-Pérès, Stéphane; Aggoune, Riad A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem. (English) Zbl 1346.90062 Eur. J. Oper. Res. 244, No. 1, 3-12 (2015). MSC: 90B05 90B35 90C59 PDFBibTeX XMLCite \textit{C. Wolosewicz} et al., Eur. J. Oper. Res. 244, No. 1, 3--12 (2015; Zbl 1346.90062) Full Text: DOI
Absi, Nabil; Dauzère-Pérès, Stéphane; Kedad-Sidhoum, Safia; Penz, Bernard; Rapine, Christophe Lot sizing with carbon emission constraints. (English) Zbl 1292.90105 Eur. J. Oper. Res. 227, No. 1, 55-61 (2013). MSC: 90B30 90C90 90C39 PDFBibTeX XMLCite \textit{N. Absi} et al., Eur. J. Oper. Res. 227, No. 1, 55--61 (2013; Zbl 1292.90105) Full Text: DOI
Mati, Yazid; Dauzère-Pérès, Stèphane; Lahlou, Chams A general approach for optimizing regular criteria in the job-shop scheduling problem. (English) Zbl 1237.90093 Eur. J. Oper. Res. 212, No. 1, 33-42 (2011). MSC: 90B35 PDFBibTeX XMLCite \textit{Y. Mati} et al., Eur. J. Oper. Res. 212, No. 1, 33--42 (2011; Zbl 1237.90093) Full Text: DOI
Martinez, S.; Dauzére-Pérés, S.; Guéret, C.; Mati, Y.; Sauer, N. Complexity of flowshop scheduling problems with a new blocking constraint. (English) Zbl 1079.90056 Eur. J. Oper. Res. 169, No. 3, 855-864 (2006). MSC: 90B35 PDFBibTeX XMLCite \textit{S. Martinez} et al., Eur. J. Oper. Res. 169, No. 3, 855--864 (2006; Zbl 1079.90056) Full Text: DOI
Brahimi, Nadjib; Dauzere-Peres, Stéphane; Najid, Najib M.; Nordli, Atle Single item lot sizing problems. (English) Zbl 1077.90001 Eur. J. Oper. Res. 168, No. 1, 1-16 (2006). MSC: 90B05 90C59 90C60 PDFBibTeX XMLCite \textit{N. Brahimi} et al., Eur. J. Oper. Res. 168, No. 1, 1--16 (2006; Zbl 1077.90001) Full Text: DOI
Sevaux, Marc; Dauzère-Pérès, Stéphane Genetic algorithms to minimize the weighted number of late jobs on a single machine. (English) Zbl 1053.90046 Eur. J. Oper. Res. 151, No. 2, 296-306 (2003). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{M. Sevaux} and \textit{S. Dauzère-Pérès}, Eur. J. Oper. Res. 151, No. 2, 296--306 (2003; Zbl 1053.90046) Full Text: DOI
Dauzère-Pérès, S.; Roux, William; Lasserre, J. B. Multi-resource shop scheduling with resource flexibility. (English) Zbl 0943.90028 Eur. J. Oper. Res. 107, No. 2, 289-305 (1998). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{S. Dauzère-Pérès} et al., Eur. J. Oper. Res. 107, No. 2, 289--305 (1998; Zbl 0943.90028) Full Text: DOI
Salomon, Marc; Solomon, Marius M.; Van Wassenhove, Luk N.; Dumas, Yvan; Dauzère-Pérès, Stephane Solving the discrete lotsizing and scheduling problem with sequence dependent set-up costs and set-up times using the travelling salesman problem with time windows. (English) Zbl 0918.90087 Eur. J. Oper. Res. 100, No. 3, 494-513 (1997). MSC: 90B35 PDFBibTeX XMLCite \textit{M. Salomon} et al., Eur. J. Oper. Res. 100, No. 3, 494--513 (1997; Zbl 0918.90087) Full Text: DOI
Dauzère-Pérès, Stéphane A procedure for the one-machine sequencing problem with dependent jobs. (English) Zbl 0920.90071 Eur. J. Oper. Res. 81, No. 3, 579-589 (1995). MSC: 90B35 PDFBibTeX XMLCite \textit{S. Dauzère-Pérès}, Eur. J. Oper. Res. 81, No. 3, 579--589 (1995; Zbl 0920.90071) Full Text: DOI
Dauzère-Pérès, Stéphane Minimizing late jobs in the general one machine scheduling problem. (English) Zbl 0913.90166 Eur. J. Oper. Res. 81, No. 1, 134-142 (1995). MSC: 90B35 PDFBibTeX XMLCite \textit{S. Dauzère-Pérès}, Eur. J. Oper. Res. 81, No. 1, 134--142 (1995; Zbl 0913.90166) Full Text: DOI
Dauzère-Péres, Stephane; Lasserre, Jean-Bernard Integration of lotsizing and scheduling decisions in a job-shop. (English) Zbl 0806.90062 Eur. J. Oper. Res. 75, No. 2, 413-426 (1994). MSC: 90B35 90C10 PDFBibTeX XMLCite \textit{S. Dauzère-Péres} and \textit{J.-B. Lasserre}, Eur. J. Oper. Res. 75, No. 2, 413--426 (1994; Zbl 0806.90062) Full Text: DOI