Zhang, Yu; Zhang, Zeqiang; Zeng, Yanqing; Wu, Tengfei Constraint programming for multi-line parallel partial disassembly line balancing problem with optional common stations. (English) Zbl 1525.90227 Appl. Math. Modelling 122, 435-455 (2023). MSC: 90B35 90B30 PDFBibTeX XMLCite \textit{Y. Zhang} et al., Appl. Math. Modelling 122, 435--455 (2023; Zbl 1525.90227) Full Text: DOI
Ham, Andy Dial-a-ride problem: mixed integer programming revisited and constraint programming proposed. (English) Zbl 1523.90029 Eng. Optim. 55, No. 2, 257-270 (2023). MSC: 90B06 90C11 PDFBibTeX XMLCite \textit{A. Ham}, Eng. Optim. 55, No. 2, 257--270 (2023; Zbl 1523.90029) Full Text: DOI
Squillaci, Samuel; Pralet, Cédric; Roussel, Stéphanie Scheduling complex observation requests for a constellation of satellites: large neighborhood search approaches. (English) Zbl 07745677 Cire, Andre A. (ed.), Integration of constraint programming, artificial intelligence, and operations research. 20th international conference, CPAIOR 2023, Nice, France, May 29 – June 1, 2023. Proceedings. Cham: Springer. Lect. Notes Comput. Sci. 13884, 443-459 (2023). MSC: 68T20 90Bxx 90C27 PDFBibTeX XMLCite \textit{S. Squillaci} et al., Lect. Notes Comput. Sci. 13884, 443--459 (2023; Zbl 07745677) Full Text: DOI
Dakle, Parag Pravin; Kadıoğlu, Serdar; Uppuluri, Karthik; Politi, Regina; Raghavan, Preethi; Rallabandi, SaiKrishna; Srinivasamurthy, Ravisutha Ner4Opt: named entity recognition for optimization modelling from natural language. (English) Zbl 07745668 Cire, Andre A. (ed.), Integration of constraint programming, artificial intelligence, and operations research. 20th international conference, CPAIOR 2023, Nice, France, May 29 – June 1, 2023. Proceedings. Cham: Springer. Lect. Notes Comput. Sci. 13884, 299-319 (2023). MSC: 68T20 90Bxx 90C27 PDFBibTeX XMLCite \textit{P. P. Dakle} et al., Lect. Notes Comput. Sci. 13884, 299--319 (2023; Zbl 07745668) Full Text: DOI
Lackner, Marie-Louise; Mrkvicka, Christoph; Musliu, Nysret; Walkiewicz, Daniel; Winter, Felix Exact methods for the oven scheduling problem. (English) Zbl 1521.90067 Constraints 28, No. 2, 320-361 (2023). MSC: 90B35 90C10 90C05 PDFBibTeX XMLCite \textit{M.-L. Lackner} et al., Constraints 28, No. 2, 320--361 (2023; Zbl 1521.90067) Full Text: DOI arXiv
Ribeiro de Abreu, Levi; Guimarães Araújo, Kennedy Anderson; de Athayde Prata, Bruno; Nagano, Marcelo Seido; Moccellin, João Vitor A new variable neighbourhood search with a constraint programming search strategy for the open shop scheduling problem with operation repetitions. (English) Zbl 1523.90195 Eng. Optim. 54, No. 9, 1563-1582 (2022). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{L. Ribeiro de Abreu} et al., Eng. Optim. 54, No. 9, 1563--1582 (2022; Zbl 1523.90195) Full Text: DOI
Hill, Alessandro; Brickey, Andrea J.; Cipriano, Italo; Goycoolea, Marcos; Newman, Alexandra Optimization strategies for resource-constrained project scheduling problems in underground mining. (English) Zbl 1505.90058 INFORMS J. Comput. 34, No. 6, 3042-3058 (2022). MSC: 90B35 PDFBibTeX XMLCite \textit{A. Hill} et al., INFORMS J. Comput. 34, No. 6, 3042--3058 (2022; Zbl 1505.90058) Full Text: DOI
Campeau, Louis-Pierre; Gamache, Michel Short- and medium-term optimization of underground mine planning using constraint programming. (English) Zbl 1512.90087 Constraints 27, No. 4, 414-431 (2022). MSC: 90B35 90C26 PDFBibTeX XMLCite \textit{L.-P. Campeau} and \textit{M. Gamache}, Constraints 27, No. 4, 414--431 (2022; Zbl 1512.90087) Full Text: DOI
Ghandehari, Najmeh; Kianfar, Kamran Mixed-integer linear programming, constraint programming and column generation approaches for operating room planning under block strategy. (English) Zbl 1505.90057 Appl. Math. Modelling 105, 438-453 (2022). MSC: 90B35 90C11 PDFBibTeX XMLCite \textit{N. Ghandehari} and \textit{K. Kianfar}, Appl. Math. Modelling 105, 438--453 (2022; Zbl 1505.90057) Full Text: DOI
Karlsson, Emil; Rönnberg, Elina Logic-based Benders decomposition with a partial assignment acceleration technique for avionics scheduling. (English) Zbl 1520.90110 Comput. Oper. Res. 146, Article ID 105916, 21 p. (2022). MSC: 90B35 90C11 PDFBibTeX XMLCite \textit{E. Karlsson} and \textit{E. Rönnberg}, Comput. Oper. Res. 146, Article ID 105916, 21 p. (2022; Zbl 1520.90110) Full Text: DOI
Luo, Yiqing L.; Beck, J. Christopher Packing by scheduling: using constraint programming to solve a complex 2D cutting stock problem. (English) Zbl 1504.90129 Schaus, Pierre (ed.), Integration of constraint programming, artificial intelligence, and operations research. 19th international conference, CPAIOR 2022, Los Angeles, CA, USA, June 20–23, 2022. Proceedings. Cham: Springer. Lect. Notes Comput. Sci. 13292, 249-265 (2022). MSC: 90C27 PDFBibTeX XMLCite \textit{Y. L. Luo} and \textit{J. C. Beck}, Lect. Notes Comput. Sci. 13292, 249--265 (2022; Zbl 1504.90129) Full Text: DOI
Gehring, Marco; Volk, Rebekka; Schultmann, Frank On the integration of diverging material flows into resource-constrained project scheduling. (English) Zbl 1524.90141 Eur. J. Oper. Res. 303, No. 3, 1071-1087 (2022). MSC: 90B35 PDFBibTeX XMLCite \textit{M. Gehring} et al., Eur. J. Oper. Res. 303, No. 3, 1071--1087 (2022; Zbl 1524.90141) Full Text: DOI
Bofill, Miquel; Coll, Jordi; Martín, Gerard; Suy, Josep; Villaret, Mateu The sample analysis machine scheduling problem: definition and comparison of exact solving approaches. (English) Zbl 1511.90163 Comput. Oper. Res. 142, Article ID 105730, 13 p. (2022). MSC: 90B35 PDFBibTeX XMLCite \textit{M. Bofill} et al., Comput. Oper. Res. 142, Article ID 105730, 13 p. (2022; Zbl 1511.90163) Full Text: DOI
Naderi, Bahman; Begen, Mehmet A.; Zaric, Gregory S. Type-2 integrated process-planning and scheduling problem: reformulation and solution algorithms. (English) Zbl 1511.90201 Comput. Oper. Res. 142, Article ID 105728, 19 p. (2022). MSC: 90B35 90C11 PDFBibTeX XMLCite \textit{B. Naderi} et al., Comput. Oper. Res. 142, Article ID 105728, 19 p. (2022; Zbl 1511.90201) Full Text: DOI
Müller, David; Müller, Marcus G.; Kress, Dominik; Pesch, Erwin An algorithm selection approach for the flexible job shop scheduling problem: choosing constraint programming solvers through machine learning. (English) Zbl 1507.90065 Eur. J. Oper. Res. 302, No. 3, 874-891 (2022). MSC: 90B35 68T07 PDFBibTeX XMLCite \textit{D. Müller} et al., Eur. J. Oper. Res. 302, No. 3, 874--891 (2022; Zbl 1507.90065) Full Text: DOI
Frihat, Mohamed; Hadj-Alouane, Atidel B.; Sadfi, Chérif Optimization of the integrated problem of employee timetabling and job shop scheduling. (English) Zbl 1511.90176 Comput. Oper. Res. 137, Article ID 105332, 15 p. (2022). MSC: 90B35 90C11 PDFBibTeX XMLCite \textit{M. Frihat} et al., Comput. Oper. Res. 137, Article ID 105332, 15 p. (2022; Zbl 1511.90176) Full Text: DOI
Kizilay, Damla; Çil, Zeynel Abidin Constraint programming approach for multi-objective two-sided assembly line balancing problem with multi-operator stations. (English) Zbl 1523.90169 Eng. Optim. 53, No. 8, 1315-1330 (2021). MSC: 90B35 90C11 90C29 PDFBibTeX XMLCite \textit{D. Kizilay} and \textit{Z. A. Çil}, Eng. Optim. 53, No. 8, 1315--1330 (2021; Zbl 1523.90169) Full Text: DOI
Hill, Alessandro; Ticktin, Jordan; Vossen, Thomas W. M. A computational study of constraint programming approaches for resource-constrained project scheduling with autonomous learning effects. (English) Zbl 07493619 Stuckey, Peter J. (ed.), Integration of constraint programming, artificial intelligence, and operations research. 18th international conference, CPAIOR 2021, Vienna, Austria, July 5–8, 2021. Proceedings. Cham: Springer. Lect. Notes Comput. Sci. 12735, 26-44 (2021). MSC: 68T20 90C27 PDFBibTeX XMLCite \textit{A. Hill} et al., Lect. Notes Comput. Sci. 12735, 26--44 (2021; Zbl 07493619) Full Text: DOI
Zhang, Luping; Yu, Chunxia; Wong, T. N. A graph-based constraint programming approach for the integrated process planning and scheduling problem. (English) Zbl 1510.90136 Comput. Oper. Res. 131, Article ID 105282, 10 p. (2021). MSC: 90B35 PDFBibTeX XMLCite \textit{L. Zhang} et al., Comput. Oper. Res. 131, Article ID 105282, 10 p. (2021; Zbl 1510.90136) Full Text: DOI
Michel, L.; Schaus, P.; Van Hentenryck, P. MiniCP: a lightweight solver for constraint programming. (English) Zbl 1480.90231 Math. Program. Comput. 13, No. 1, 133-184 (2021). MSC: 90C30 PDFBibTeX XMLCite \textit{L. Michel} et al., Math. Program. Comput. 13, No. 1, 133--184 (2021; Zbl 1480.90231) Full Text: DOI
Chevroton, Hugo; Kergosien, Yannick; Berghman, Lotte; Billaut, Jean-Charles Solving an integrated scheduling and routing problem with inventory, routing and penalty costs. (English) Zbl 1487.90281 Eur. J. Oper. Res. 294, No. 2, 571-589 (2021). MSC: 90B35 90B05 90B06 PDFBibTeX XMLCite \textit{H. Chevroton} et al., Eur. J. Oper. Res. 294, No. 2, 571--589 (2021; Zbl 1487.90281) Full Text: DOI HAL
Lunardi, Willian T.; Birgin, Ernesto G.; Ronconi, Débora P.; Voos, Holger Metaheuristics for the online printing shop scheduling problem. (English) Zbl 1487.90304 Eur. J. Oper. Res. 293, No. 2, 419-441 (2021). MSC: 90B35 90C11 90C59 PDFBibTeX XMLCite \textit{W. T. Lunardi} et al., Eur. J. Oper. Res. 293, No. 2, 419--441 (2021; Zbl 1487.90304) Full Text: DOI arXiv
Edis, Emrah B. Constraint programming approaches to disassembly line balancing problem with sequencing decisions. (English) Zbl 1510.90085 Comput. Oper. Res. 126, Article ID 105111, 20 p. (2021). MSC: 90B30 PDFBibTeX XMLCite \textit{E. B. Edis}, Comput. Oper. Res. 126, Article ID 105111, 20 p. (2021; Zbl 1510.90085) Full Text: DOI
Armellini, Davide; Borzone, Paolo; Ceschia, Sara; Di Gaspero, Luca; Schaerf, Andrea Modeling and solving the steelmaking and casting scheduling problem. (English) Zbl 07766415 Int. Trans. Oper. Res. 27, No. 1, 57-90 (2020). MSC: 90-XX PDFBibTeX XMLCite \textit{D. Armellini} et al., Int. Trans. Oper. Res. 27, No. 1, 57--90 (2020; Zbl 07766415) Full Text: DOI
Hellsten, Erik Orm; Sacramento, David; Pisinger, David An adaptive large neighbourhood search heuristic for routing and scheduling feeder vessels in multi-terminal ports. (English) Zbl 1487.90296 Eur. J. Oper. Res. 287, No. 2, 682-698 (2020). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{E. O. Hellsten} et al., Eur. J. Oper. Res. 287, No. 2, 682--698 (2020; Zbl 1487.90296) Full Text: DOI
Hà, Minh Hoàng; Nguyen, Tat Dat; Nguyen Duy, Thinh; Pham, Hoang Giang; Do, Thuy; Rousseau, Louis-Martin A new constraint programming model and a linear programming-based adaptive large neighborhood search for the vehicle routing problem with synchronization constraints. (English) Zbl 1458.90098 Comput. Oper. Res. 124, Article ID 105085, 13 p. (2020). MSC: 90B06 90B35 90C59 PDFBibTeX XMLCite \textit{M. H. Hà} et al., Comput. Oper. Res. 124, Article ID 105085, 13 p. (2020; Zbl 1458.90098) Full Text: DOI arXiv
Abidin Çil, Zeynel; Kizilay, Damla Constraint programming model for multi-manned assembly line balancing problem. (English) Zbl 1458.90243 Comput. Oper. Res. 124, Article ID 105069, 14 p. (2020). MSC: 90B35 90C11 PDFBibTeX XMLCite \textit{Z. Abidin Çil} and \textit{D. Kizilay}, Comput. Oper. Res. 124, Article ID 105069, 14 p. (2020; Zbl 1458.90243) Full Text: DOI
Lunardi, Willian T.; Birgin, Ernesto G.; Laborie, Philippe; Ronconi, Débora P.; Voos, Holger Mixed integer linear programming and constraint programming models for the online printing shop scheduling problem. (English) Zbl 1458.90326 Comput. Oper. Res. 123, Article ID 105020, 20 p. (2020). MSC: 90B35 90C11 90C59 PDFBibTeX XMLCite \textit{W. T. Lunardi} et al., Comput. Oper. Res. 123, Article ID 105020, 20 p. (2020; Zbl 1458.90326) Full Text: DOI arXiv
Sacramento, David; Solnon, Christine; Pisinger, David Constraint programming and local search heuristic: a matheuristic approach for routing and scheduling feeder vessels in multi-terminal ports. (English) Zbl 1457.90074 SN Oper. Res. Forum 1, No. 4, Paper No. 32, 34 p. (2020). MSC: 90B35 90B06 90B10 90C59 PDFBibTeX XMLCite \textit{D. Sacramento} et al., SN Oper. Res. Forum 1, No. 4, Paper No. 32, 34 p. (2020; Zbl 1457.90074) Full Text: DOI HAL
Gerhards, Patrick The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds. (English) Zbl 1454.90018 OR Spectrum 42, No. 4, 901-933 (2020). MSC: 90B35 91B32 90C11 PDFBibTeX XMLCite \textit{P. Gerhards}, OR Spectrum 42, No. 4, 901--933 (2020; Zbl 1454.90018) Full Text: DOI
Van Cauwelaert, Sascha; Dejemeppe, Cyrille; Schaus, Pierre An efficient filtering algorithm for the unary resource constraint with transition times and optional activities. (English) Zbl 1446.90085 J. Sched. 23, No. 4, 431-449 (2020). MSC: 90B35 68M20 PDFBibTeX XMLCite \textit{S. Van Cauwelaert} et al., J. Sched. 23, No. 4, 431--449 (2020; Zbl 1446.90085) Full Text: DOI
Bukchin, Yossi; Raviv, Tal; Zaides, Ilya The consecutive multiprocessor job scheduling problem. (English) Zbl 1441.90058 Eur. J. Oper. Res. 284, No. 2, 427-438 (2020). MSC: 90B35 PDFBibTeX XMLCite \textit{Y. Bukchin} et al., Eur. J. Oper. Res. 284, No. 2, 427--438 (2020; Zbl 1441.90058) Full Text: DOI
van Bulck, David; Goossens, Dries; Schönberger, Jörn; Guajardo, Mario RobinX: a three-field classification and unified data format for round-robin sports timetabling. (English) Zbl 1430.90293 Eur. J. Oper. Res. 280, No. 2, 568-580 (2020). MSC: 90B35 90-04 PDFBibTeX XMLCite \textit{D. van Bulck} et al., Eur. J. Oper. Res. 280, No. 2, 568--580 (2020; Zbl 1430.90293) Full Text: DOI
Osorio-Valenzuela, Luis; Pereira, Jordi; Quezada, Franco; Vásquez, Óscar C. Minimizing the number of machines with limited workload capacity for scheduling jobs with interval constraints. (English) Zbl 1481.90183 Appl. Math. Modelling 74, 512-527 (2019). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{L. Osorio-Valenzuela} et al., Appl. Math. Modelling 74, 512--527 (2019; Zbl 1481.90183) Full Text: DOI
Yahouni, Zakaria; Mebarki, Nasser; Sari, Zaki Evaluation of a new decision-aid parameter for job shop scheduling under uncertainties. (English) Zbl 1423.90102 RAIRO, Oper. Res. 53, No. 2, 593-608 (2019). MSC: 90B35 90B36 68M20 PDFBibTeX XMLCite \textit{Z. Yahouni} et al., RAIRO, Oper. Res. 53, No. 2, 593--608 (2019; Zbl 1423.90102) Full Text: DOI HAL
Laborie, Philippe; Rogerie, Jérôme; Shaw, Paul; Vilím, Petr IBM ILOG CP optimizer for scheduling. 20+ years of scheduling with constraints at IBM/ILOG. (English) Zbl 1400.90169 Constraints 23, No. 2, 210-250 (2018). MSC: 90B35 90C27 90-03 01A61 90-04 PDFBibTeX XMLCite \textit{P. Laborie} et al., Constraints 23, No. 2, 210--250 (2018; Zbl 1400.90169) Full Text: DOI
Hooker, J. N.; van Hoeve, W.-J. Constraint programming and operations research. (English) Zbl 1402.90148 Constraints 23, No. 2, 172-195 (2018). MSC: 90C27 PDFBibTeX XMLCite \textit{J. N. Hooker} and \textit{W. J. van Hoeve}, Constraints 23, No. 2, 172--195 (2018; Zbl 1402.90148) Full Text: DOI
Polyakovskiy, Sergey; M’Hallah, Rym A hybrid feasibility constraints-guided search to the two-dimensional bin packing problem with due dates. (English) Zbl 1403.90486 Eur. J. Oper. Res. 266, No. 3, 819-839 (2018). MSC: 90B80 90C27 PDFBibTeX XMLCite \textit{S. Polyakovskiy} and \textit{R. M'Hallah}, Eur. J. Oper. Res. 266, No. 3, 819--839 (2018; Zbl 1403.90486) Full Text: DOI arXiv
Kreter, Stefan; Schutt, Andreas; Stuckey, Peter J. Using constraint programming for solving RCPSP/MAX-cal. (English) Zbl 1387.90092 Constraints 22, No. 3, 432-462 (2017). MSC: 90B35 PDFBibTeX XMLCite \textit{S. Kreter} et al., Constraints 22, No. 3, 432--462 (2017; Zbl 1387.90092) Full Text: DOI
Cappart, Quentin; Schaus, Pierre Rescheduling railway traffic on real time situations using time-interval variables. (English) Zbl 1491.90081 Salvagnin, Domenico (ed.) et al., Integration of AI and OR techniques in constraint programming. 14th international conference, CPAIOR 2017, Padua, Italy, June 5–8, 2017. Proceedings. Cham: Springer. Lect. Notes Comput. Sci. 10335, 312-327 (2017). MSC: 90B35 PDFBibTeX XMLCite \textit{Q. Cappart} and \textit{P. Schaus}, Lect. Notes Comput. Sci. 10335, 312--327 (2017; Zbl 1491.90081) Full Text: DOI
Talbi, El-Ghazali Combining metaheuristics with mathematical programming, constraint programming and machine learning. (English) Zbl 1342.90194 Ann. Oper. Res. 240, No. 1, 171-215 (2016). MSC: 90C30 90C59 PDFBibTeX XMLCite \textit{E.-G. Talbi}, Ann. Oper. Res. 240, No. 1, 171--215 (2016; Zbl 1342.90194) Full Text: DOI
Goel, V.; Slusky, M.; van Hoeve, W.-J.; Furman, K. C.; Shao, Y. Constraint programming for LNG ship scheduling and inventory management. (English) Zbl 1339.90049 Eur. J. Oper. Res. 241, No. 3, 662-673 (2015). MSC: 90B06 90B05 90B90 90C90 PDFBibTeX XMLCite \textit{V. Goel} et al., Eur. J. Oper. Res. 241, No. 3, 662--673 (2015; Zbl 1339.90049) Full Text: DOI
Grimes, Diarmuid; Hebrard, Emmanuel Solving variants of the job shop scheduling problem through conflict-directed search. (English) Zbl 1329.90061 INFORMS J. Comput. 27, No. 2, 268-284 (2015). MSC: 90B35 90C27 PDFBibTeX XMLCite \textit{D. Grimes} and \textit{E. Hebrard}, INFORMS J. Comput. 27, No. 2, 268--284 (2015; Zbl 1329.90061) Full Text: DOI
Shirzadeh Chaleshtarti, A.; Shadrokh, S.; Fathi, Y. Branch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurement. (English) Zbl 1407.90174 Math. Probl. Eng. 2014, Article ID 634649, 15 p. (2014). MSC: 90B35 90C57 90C35 PDFBibTeX XMLCite \textit{A. Shirzadeh Chaleshtarti} et al., Math. Probl. Eng. 2014, Article ID 634649, 15 p. (2014; Zbl 1407.90174) Full Text: DOI
Schutt, Andreas; Feydy, Thibaut; Stuckey, Peter J.; Wallace, Mark G. Solving RCPSP/max by lazy clause generation. (English) Zbl 1280.90067 J. Sched. 16, No. 3, 273-289 (2013). MSC: 90B35 68M20 90C09 PDFBibTeX XMLCite \textit{A. Schutt} et al., J. Sched. 16, No. 3, 273--289 (2013; Zbl 1280.90067) Full Text: DOI Link
Talbi, El-Ghazali Combining metaheuristics with mathematical programming, constraint programming and machine learning. (English) Zbl 1273.90004 4OR 11, No. 2, 101-150 (2013). MSC: 90-02 90C59 68T05 PDFBibTeX XMLCite \textit{E.-G. Talbi}, 4OR 11, No. 2, 101--150 (2013; Zbl 1273.90004) Full Text: DOI
Li, Haitao; Jiang, Dali New model and heuristics for safety stock placement in general acyclic supply chain networks. (English) Zbl 1251.90056 Comput. Oper. Res. 39, No. 7, 1333-1344 (2012). MSC: 90B06 90B05 PDFBibTeX XMLCite \textit{H. Li} and \textit{D. Jiang}, Comput. Oper. Res. 39, No. 7, 1333--1344 (2012; Zbl 1251.90056) Full Text: DOI
Benini, Luca; Lombardi, Michele; Milano, Michela; Ruggiero, Martino Optimal resource allocation and scheduling for the CELL BE platform. (English) Zbl 1214.90050 Ann. Oper. Res. 184, 51-77 (2011). MSC: 90B35 90C10 PDFBibTeX XMLCite \textit{L. Benini} et al., Ann. Oper. Res. 184, 51--77 (2011; Zbl 1214.90050) Full Text: DOI
Kovács, András; Beck, J. Christopher A global constraint for total weighted completion time for unary resources. (English) Zbl 1215.90028 Constraints 16, No. 1, 100-123 (2011). MSC: 90B35 68W40 PDFBibTeX XMLCite \textit{A. Kovács} and \textit{J. C. Beck}, Constraints 16, No. 1, 100--123 (2011; Zbl 1215.90028) Full Text: DOI
Pereira Leite, Emilson (ed.) MATLAB – modelling, programming and simulations. (English) Zbl 1213.68014 Rijeka: Sciyo (ISBN 978-953-307-125-1). vii, 442 p. (2010). MSC: 68-04 68U07 68U20 93B51 68-06 90-06 00B15 PDFBibTeX XMLCite \textit{E. Pereira Leite} (ed.), MATLAB -- modelling, programming and simulations. Rijeka: Sciyo (2010; Zbl 1213.68014)
Bagchi, Sugato; Baseman, Roberto J.; Davenport, Andrew; Natarajan, Ramesh; Slonim, Noam; Weiss, Sholom Data analytics and stochastic modelling in a semiconductor fab. (English) Zbl 1224.90065 Appl. Stoch. Models Bus. Ind. 26, No. 1, 1-27 (2010). Reviewer: A. D. Borisenko (Kyïv) MSC: 90B30 PDFBibTeX XMLCite \textit{S. Bagchi} et al., Appl. Stoch. Models Bus. Ind. 26, No. 1, 1--27 (2010; Zbl 1224.90065) Full Text: DOI
Russell, Robert A.; Urban, Timothy L. The location and allocation of products and product families on retail shelves. (English) Zbl 1201.90123 Ann. Oper. Res. 179, 131-147 (2010). MSC: 90B80 PDFBibTeX XMLCite \textit{R. A. Russell} and \textit{T. L. Urban}, Ann. Oper. Res. 179, 131--147 (2010; Zbl 1201.90123) Full Text: DOI
Gacias, Bernat; Artigues, Christian; Lopez, Pierre Parallel machine scheduling with precedence constraints and setup times. (English) Zbl 1231.90192 Comput. Oper. Res. 37, No. 12, 2141-2151 (2010). MSC: 90B35 90C57 PDFBibTeX XMLCite \textit{B. Gacias} et al., Comput. Oper. Res. 37, No. 12, 2141--2151 (2010; Zbl 1231.90192) Full Text: DOI arXiv
Lombardi, Michele; Milano, Michela Allocation and scheduling of conditional task graphs. (English) Zbl 1186.90054 Artif. Intell. 174, No. 7-8, 500-529 (2010). MSC: 90B35 90C35 PDFBibTeX XMLCite \textit{M. Lombardi} and \textit{M. Milano}, Artif. Intell. 174, No. 7--8, 500--529 (2010; Zbl 1186.90054) Full Text: DOI
Bidot, Julien; Vidal, Thierry; Laborie, Philippe; Beck, J. Christopher A theoretic and practical framework for scheduling in a stochastic environment. (English) Zbl 1185.90109 J. Sched. 12, No. 3, 315-344 (2009). MSC: 90B36 90C27 PDFBibTeX XMLCite \textit{J. Bidot} et al., J. Sched. 12, No. 3, 315--344 (2009; Zbl 1185.90109) Full Text: DOI
Carchrae, Tom; Beck, J. Christopher Principles for the design of large neighborhood search. (English) Zbl 1179.90129 J. Math. Model. Algorithms 8, No. 3, 245-270 (2009). MSC: 90B35 90B40 68T05 PDFBibTeX XMLCite \textit{T. Carchrae} and \textit{J. C. Beck}, J. Math. Model. Algorithms 8, No. 3, 245--270 (2009; Zbl 1179.90129) Full Text: DOI
Billaut, Jean-Charles; Sourd, Francis Single machine scheduling with forbidden start times. (English) Zbl 1162.90444 4OR 7, No. 1, 37-50 (2009). MSC: 90B35 90C39 PDFBibTeX XMLCite \textit{J.-C. Billaut} and \textit{F. Sourd}, 4OR 7, No. 1, 37--50 (2009; Zbl 1162.90444) Full Text: DOI
Meyer, Bernd Hybrids of constructive metaheuristics and constraint programming: a case study with ACO. (English) Zbl 1415.90153 Blum, Christian (ed.) et al., Hybrid metaheuristics. An emerging approach to optimization. Berlin: Springer. Stud. Comput. Intell. 114, 151-183 (2008). MSC: 90C59 PDFBibTeX XMLCite \textit{B. Meyer}, Stud. Comput. Intell. 114, 151--183 (2008; Zbl 1415.90153) Full Text: DOI
Hamiez, J.-P.; Hao, J.-K. Using solution properties within an enumerative search to solve a sports league scheduling problem. (English) Zbl 1279.90068 Discrete Appl. Math. 156, No. 10, 1683-1693 (2008). MSC: 90B35 90B90 PDFBibTeX XMLCite \textit{J. P. Hamiez} and \textit{J. K. Hao}, Discrete Appl. Math. 156, No. 10, 1683--1693 (2008; Zbl 1279.90068) Full Text: DOI
Yavuz, Mesut; İnan, Umut H.; Fığlalı, Alpaslan Fair referee assignments for professional football leagues. (English) Zbl 1144.90439 Comput. Oper. Res. 35, No. 9, 2937-2951 (2008). MSC: 90B80 90C59 PDFBibTeX XMLCite \textit{M. Yavuz} et al., Comput. Oper. Res. 35, No. 9, 2937--2951 (2008; Zbl 1144.90439) Full Text: DOI
Rasmussen, Rasmus V.; Trick, Michael A. Round robin scheduling – a survey. (English) Zbl 1144.90396 Eur. J. Oper. Res. 188, No. 3, 617-636 (2008). MSC: 90B35 PDFBibTeX XMLCite \textit{R. V. Rasmussen} and \textit{M. A. Trick}, Eur. J. Oper. Res. 188, No. 3, 617--636 (2008; Zbl 1144.90396) Full Text: DOI
Clautiaux, François; Jouglet, Antoine; Carlier, Jacques; Moukrim, Aziz A new constraint programming approach for the orthogonal packing problem. (English) Zbl 1278.90147 Comput. Oper. Res. 35, No. 3, 944-959 (2008). MSC: 90B35 90C27 PDFBibTeX XMLCite \textit{F. Clautiaux} et al., Comput. Oper. Res. 35, No. 3, 944--959 (2008; Zbl 1278.90147) Full Text: DOI
Sourd, Francis Scheduling with periodic availability constraints and irregular cost functions. (English) Zbl 1154.90489 RAIRO, Oper. Res. 41, No. 2, 141-154 (2007). MSC: 90B35 PDFBibTeX XMLCite \textit{F. Sourd}, RAIRO, Oper. Res. 41, No. 2, 141--154 (2007; Zbl 1154.90489) Full Text: DOI EuDML Link
Mercier, Luc; van Hentenryck, Pascal Strong polynomiality of resource constraint propagation. (English) Zbl 1153.90430 Discrete Optim. 4, No. 3-4, 288-314 (2007). MSC: 90B35 PDFBibTeX XMLCite \textit{L. Mercier} and \textit{P. van Hentenryck}, Discrete Optim. 4, No. 3--4, 288--314 (2007; Zbl 1153.90430) Full Text: DOI
Beck, J. Christopher; Prosser, Patrick; Selensky, Evgeny A case study of mutual routing-scheduling reformulation. (English) Zbl 1154.90412 J. Sched. 9, No. 5, 469-491 (2006). MSC: 90B35 PDFBibTeX XMLCite \textit{J. C. Beck} et al., J. Sched. 9, No. 5, 469--491 (2006; Zbl 1154.90412) Full Text: DOI
Voudouris, Christos; Owusu, Gilbert; Dorne, Raphael; Ladde, Cedric; Virginas, Botond ARMS: an automated resource management system for British telecommunications plc. (English) Zbl 1116.90325 Eur. J. Oper. Res. 171, No. 3, 951-961 (2006). MSC: 90B18 90C59 90B70 PDFBibTeX XMLCite \textit{C. Voudouris} et al., Eur. J. Oper. Res. 171, No. 3, 951--961 (2006; Zbl 1116.90325) Full Text: DOI
Sourd, Francis Earliness-tardiness scheduling with setup considerations. (English) Zbl 1075.90032 Comput. Oper. Res. 32, No. 7, 1849-1865 (2005). MSC: 90B35 90C57 PDFBibTeX XMLCite \textit{F. Sourd}, Comput. Oper. Res. 32, No. 7, 1849--1865 (2005; Zbl 1075.90032) Full Text: DOI
Sourd, Francis Optimal timing of a sequence of tasks with general completion costs. (English) Zbl 1112.90340 Eur. J. Oper. Res. 165, No. 1, 82-96 (2005). MSC: 90B35 90C39 PDFBibTeX XMLCite \textit{F. Sourd}, Eur. J. Oper. Res. 165, No. 1, 82--96 (2005; Zbl 1112.90340) Full Text: DOI
Sourd, Francis; Rogerie, Jérôme Continuous filling and emptying of storage systems in constraint-based scheduling. (English) Zbl 1066.90041 Eur. J. Oper. Res. 165, No. 2, 510-524 (2005). MSC: 90B35 PDFBibTeX XMLCite \textit{F. Sourd} and \textit{J. Rogerie}, Eur. J. Oper. Res. 165, No. 2, 510--524 (2005; Zbl 1066.90041) Full Text: DOI
Hamiez, Jean-Philippe; Hao, Jin-Kao A linear-time algorithm to solve the sports league scheduling problem (prob026 of CSPLib). (English) Zbl 1067.90511 Discrete Appl. Math. 143, No. 1-3, 252-265 (2004). MSC: 90B35 PDFBibTeX XMLCite \textit{J.-P. Hamiez} and \textit{J.-K. Hao}, Discrete Appl. Math. 143, No. 1--3, 252--265 (2004; Zbl 1067.90511) Full Text: DOI
Schönberger, J.; Mattfeld, D. C.; Kopfer, H. Memetic algorithm timetabling for non-commercial sport leagues. (English) Zbl 1137.90517 Eur. J. Oper. Res. 153, No. 1, 102-116 (2004). MSC: 90B35 90B70 PDFBibTeX XMLCite \textit{J. Schönberger} et al., Eur. J. Oper. Res. 153, No. 1, 102--116 (2004; Zbl 1137.90517) Full Text: DOI
Henz, Martin; Müller, Tobias; Thiel, Sven Global constraints for round robin tournament scheduling. (English) Zbl 1053.90037 Eur. J. Oper. Res. 153, No. 1, 92-101 (2004). MSC: 90B35 05C90 PDFBibTeX XMLCite \textit{M. Henz} et al., Eur. J. Oper. Res. 153, No. 1, 92--101 (2004; Zbl 1053.90037) Full Text: DOI
Laborie, Philippe Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results. (English) Zbl 1079.68622 Artif. Intell. 143, No. 2, 151-188 (2003). MSC: 68T20 90B35 PDFBibTeX XMLCite \textit{P. Laborie}, Artif. Intell. 143, No. 2, 151--188 (2003; Zbl 1079.68622) Full Text: DOI
Cheang, B.; Li, H.; Lim, A.; Rodrigues, B. Nurse rostering problems – a bibliographic survey. (English) Zbl 1045.90027 Eur. J. Oper. Res. 151, No. 3, 447-460 (2003). MSC: 90B35 PDFBibTeX XMLCite \textit{B. Cheang} et al., Eur. J. Oper. Res. 151, No. 3, 447--460 (2003; Zbl 1045.90027) Full Text: DOI
Houba, Iris H. G.; Hartog, Rob J. M.; Top, Jan L.; Beulens, Adrie J. M.; van Berkel, Linda N. Using recipe classes for supporting detailed planning in food industry: A case study. (English) Zbl 0959.90500 Eur. J. Oper. Res. 122, No. 2, 367-373 (2000). MSC: 90B90 90B35 PDFBibTeX XMLCite \textit{I. H. G. Houba} et al., Eur. J. Oper. Res. 122, No. 2, 367--373 (2000; Zbl 0959.90500) Full Text: DOI
Pesant, Gilles; Gendreau, Michel; Potvin, Jean-Yves; Rousseau, Jean-Marc On the flexibility of constraint programming models: From single to multiple time windows for the traveling salesman problem. (English) Zbl 0998.90065 Eur. J. Oper. Res. 117, No. 2, 253-263 (1999). MSC: 90C27 90C57 PDFBibTeX XMLCite \textit{G. Pesant} et al., Eur. J. Oper. Res. 117, No. 2, 253--263 (1999; Zbl 0998.90065) Full Text: DOI
Jain, A. S.; Meeran, S. Deterministic job-shop scheduling: Past, present and future. (English) Zbl 0938.90028 Eur. J. Oper. Res. 113, No. 2, 390-434 (1999). MSC: 90B35 90-02 PDFBibTeX XMLCite \textit{A. S. Jain} and \textit{S. Meeran}, Eur. J. Oper. Res. 113, No. 2, 390--434 (1999; Zbl 0938.90028) Full Text: DOI
Brucker, Peter; Drexl, Andreas; Möhring, Rolf; Neumann, Klaus; Pesch, Erwin Resource-constrained project scheduling: Notation, classification, models, and methods. (English) Zbl 0937.90030 Eur. J. Oper. Res. 112, No. 1, 3-41 (1999). MSC: 90B35 PDFBibTeX XMLCite \textit{P. Brucker} et al., Eur. J. Oper. Res. 112, No. 1, 3--41 (1999; Zbl 0937.90030) Full Text: DOI
Nuijten, Wim; Le Pape, Claude Constraint-based job shop scheduling with Ilog Scheduler. (English) Zbl 0903.90101 J. Heuristics 3, No. 4, 271-286 (1998). MSC: 90B35 PDFBibTeX XMLCite \textit{W. Nuijten} and \textit{C. Le Pape}, J. Heuristics 3, No. 4, 271--286 (1998; Zbl 0903.90101) Full Text: DOI
Osman, Ibrahim H.; Laporte, Gilbert Metaheuristics: A bibliography. (English) Zbl 0849.90097 Ann. Oper. Res. 63, 513-623 (1996). MSC: 90C27 68T05 90-00 PDFBibTeX XMLCite \textit{I. H. Osman} and \textit{G. Laporte}, Ann. Oper. Res. 63, 513--623 (1996; Zbl 0849.90097) Full Text: DOI
Nuijten, W. P. M.; Aarts, Emile H. L. A computational study of constraint satisfaction for multiple capacitated job shop scheduling. (English) Zbl 0916.90152 Eur. J. Oper. Res. 90, No. 2, 269-284 (1996). MSC: 90B35 PDFBibTeX XMLCite \textit{W. P. M. Nuijten} and \textit{E. H. L. Aarts}, Eur. J. Oper. Res. 90, No. 2, 269--284 (1996; Zbl 0916.90152) Full Text: DOI