Vanhoucke, Mario; Coelho, José Resource-constrained project scheduling with activity splitting and setup times. (English) Zbl 1458.90362 Comput. Oper. Res. 109, 230-249 (2019). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{M. Vanhoucke} and \textit{J. Coelho}, Comput. Oper. Res. 109, 230--249 (2019; Zbl 1458.90362) Full Text: DOI
Leyman, Pieter; van Driessche, Niels; Vanhoucke, Mario; de Causmaecker, Patrick The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models. (English) Zbl 1458.90318 Comput. Oper. Res. 103, 184-197 (2019). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{P. Leyman} et al., Comput. Oper. Res. 103, 184--197 (2019; Zbl 1458.90318) Full Text: DOI Link
Servranckx, Tom; Vanhoucke, Mario A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs. (English) Zbl 1403.90657 Eur. J. Oper. Res. 273, No. 3, 841-860 (2019). MSC: 90C59 90B35 PDFBibTeX XMLCite \textit{T. Servranckx} and \textit{M. Vanhoucke}, Eur. J. Oper. Res. 273, No. 3, 841--860 (2019; Zbl 1403.90657) Full Text: DOI Link
Zhu, Xia; Ruiz, Rubén; Li, Shiyu; Li, Xiaoping An effective heuristic for project scheduling with resource availability cost. (English) Zbl 1394.90322 Eur. J. Oper. Res. 257, No. 3, 746-762 (2017). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{X. Zhu} et al., Eur. J. Oper. Res. 257, No. 3, 746--762 (2017; Zbl 1394.90322) Full Text: DOI Link
Leyman, Pieter; Vanhoucke, Mario Capital- and resource-constrained project scheduling with net present value optimization. (English) Zbl 1394.90285 Eur. J. Oper. Res. 256, No. 3, 757-776 (2017). MSC: 90B35 90C59 90C90 PDFBibTeX XMLCite \textit{P. Leyman} and \textit{M. Vanhoucke}, Eur. J. Oper. Res. 256, No. 3, 757--776 (2017; Zbl 1394.90285) Full Text: DOI Link
Li, Hongbo; Demeulemeester, Erik A genetic algorithm for the robust resource leveling problem. (English) Zbl 1341.90067 J. Sched. 19, No. 1, 43-60 (2016). MSC: 90B50 90B35 68M20 90C59 PDFBibTeX XMLCite \textit{H. Li} and \textit{E. Demeulemeester}, J. Sched. 19, No. 1, 43--60 (2016; Zbl 1341.90067) Full Text: DOI
Suresh, M.; Dutta, Pankaj; Jain, Karuna Resource constrained multi-project scheduling problem with resource transfer times. (English) Zbl 1335.90048 Asia-Pac. J. Oper. Res. 32, No. 6, Article ID 1550048, 30 p. (2015). MSC: 90B36 90B50 90C59 PDFBibTeX XMLCite \textit{M. Suresh} et al., Asia-Pac. J. Oper. Res. 32, No. 6, Article ID 1550048, 30 p. (2015; Zbl 1335.90048) Full Text: DOI
Van Peteghem, Vincent; Vanhoucke, Mario Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem. (English) Zbl 1237.90100 J. Heuristics 17, No. 6, 705-728 (2011). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{V. Van Peteghem} and \textit{M. Vanhoucke}, J. Heuristics 17, No. 6, 705--728 (2011; Zbl 1237.90100) Full Text: DOI
Vanhoucke, Mario A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows. (English) Zbl 1197.90235 Int. J. Prod. Res. 48, No. 7, 1983-2001 (2010). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{M. Vanhoucke}, Int. J. Prod. Res. 48, No. 7, 1983--2001 (2010; Zbl 1197.90235) Full Text: DOI HAL
Tareghian, Hamed R.; Taheri, Seyyed Hassan A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search. (English) Zbl 1227.90019 Appl. Math. Comput. 190, No. 2, 1136-1145 (2007). MSC: 90B50 90C35 90C59 PDFBibTeX XMLCite \textit{H. R. Tareghian} and \textit{S. H. Taheri}, Appl. Math. Comput. 190, No. 2, 1136--1145 (2007; Zbl 1227.90019) Full Text: DOI
Debels, Dieter; De Reyck, Bert; Leus, Roel; Vanhoucke, Mario A hybrid scatter search/electromagnetism meta-heuristic for project scheduling. (English) Zbl 1079.90051 Eur. J. Oper. Res. 169, No. 2, 638-653 (2006). MSC: 90B35 90C59 90B40 PDFBibTeX XMLCite \textit{D. Debels} et al., Eur. J. Oper. Res. 169, No. 2, 638--653 (2006; Zbl 1079.90051) Full Text: DOI