Kubiak, Wiesław On a conjecture for the university timetabling problem. (English) Zbl 1465.90028 Discrete Appl. Math. 299, 26-49 (2021). MSC: 90B35 90C27 PDFBibTeX XMLCite \textit{W. Kubiak}, Discrete Appl. Math. 299, 26--49 (2021; Zbl 1465.90028) Full Text: DOI
de Werra, Dominique; Kis, Tamás; Kubiak, Wieslaw Preemptive open shop scheduling with multiprocessors: Polynomial cases and applications. (English) Zbl 1168.90483 J. Sched. 11, No. 1, 75-83 (2008). MSC: 90B35 PDFBibTeX XMLCite \textit{D. de Werra} et al., J. Sched. 11, No. 1, 75--83 (2008; Zbl 1168.90483) Full Text: DOI Link
Janiak, Adam; Kovalyov, Mikhail Y.; Kubiak, Wieslaw; Werner, Frank Positive half-products and scheduling with controllable processing times. (English) Zbl 1066.90031 Eur. J. Oper. Res. 165, No. 2, 416-422 (2005). MSC: 90B35 90C59 65Y20 PDFBibTeX XMLCite \textit{A. Janiak} et al., Eur. J. Oper. Res. 165, No. 2, 416--422 (2005; Zbl 1066.90031) Full Text: DOI
Kubiak, Wieslaw Minimization of ordered, symmetric half-products. (English) Zbl 1084.90030 Discrete Appl. Math. 146, No. 3, 287-300 (2005). MSC: 90C09 90B35 PDFBibTeX XMLCite \textit{W. Kubiak}, Discrete Appl. Math. 146, No. 3, 287--300 (2005; Zbl 1084.90030) Full Text: DOI
Cheng, Jinliang; Kubiak, Wieslaw A half-product based approximation scheme for agreeably weighted completion time variance. (English) Zbl 1132.90322 Eur. J. Oper. Res. 162, No. 1, 45-54 (2005). MSC: 90B35 90B05 90C59 68W25 PDFBibTeX XMLCite \textit{J. Cheng} and \textit{W. Kubiak}, Eur. J. Oper. Res. 162, No. 1, 45--54 (2005; Zbl 1132.90322) Full Text: DOI
Kubiak, Wieslaw; Cheng, Jinliang; Kovalyov, Mikhail Y. Fast fully polynomial approximation schemes for minimizing completion time variance. (English) Zbl 0998.90038 Eur. J. Oper. Res. 137, No. 2, 303-309 (2002). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{W. Kubiak} et al., Eur. J. Oper. Res. 137, No. 2, 303--309 (2002; Zbl 0998.90038) Full Text: DOI
Kubiak, Wieslaw; Timkovsky, Vadim Total completion time minimization in two-machine job shops with unit-time operations. (English) Zbl 0953.90523 Eur. J. Oper. Res. 94, No. 2, 310-320 (1996). MSC: 90B35 PDFBibTeX XMLCite \textit{W. Kubiak} and \textit{V. Timkovsky}, Eur. J. Oper. Res. 94, No. 2, 310--320 (1996; Zbl 0953.90523) Full Text: DOI
Błażewicz, J.; Kubiak, W.; Szwarcfiter, J. Scheduling unit-time tasks on flow-shops under resource constraints. (English) Zbl 0694.90065 Multi-attribute decision making via O.R.-based expert systems, Proc. Int. Conf., Passau/FRG 1986, Ann. Oper. Res. 16, No. 1-4, 255-266 (1988). MSC: 90B35 68Q25 90C39 PDFBibTeX XML
Błażewicz, J.; Kubiak, W.; Röck, H.; Szwarcfiter, J. Minimizing mean flow time with parallel processors and resource constraints. (English) Zbl 0606.68030 Acta Inf. 24, 513-524 (1987). MSC: 68M20 90B35 68Q25 PDFBibTeX XMLCite \textit{J. Błażewicz} et al., Acta Inf. 24, 513--524 (1987; Zbl 0606.68030) Full Text: DOI