Zhang, Yuzhong; Li, Shuguang Scheduling with tree-hierarchical processing set restrictions. (Chinese. English summary) Zbl 1474.90170 Oper. Res. Trans. 24, No. 4, 107-112 (2020). MSC: 90B35 90C59 PDFBibTeX XMLCite \textit{Y. Zhang} and \textit{S. Li}, Oper. Res. Trans. 24, No. 4, 107--112 (2020; Zbl 1474.90170) Full Text: DOI
Zhang, Long Two-stage supply chain scheduling with a limited holding time. (Chinese. English summary) Zbl 1389.90140 Oper. Res. Trans. 21, No. 2, 126-134 (2017). MSC: 90B35 90B05 PDFBibTeX XMLCite \textit{L. Zhang}, Oper. Res. Trans. 21, No. 2, 126--134 (2017; Zbl 1389.90140)
Fan, Jing; Lu, Xiwen Supply chain scheduling problem under simple linear deterioration on a single-machine with an unavailability constraint. (Chinese. English summary) Zbl 1374.90155 Oper. Res. Trans. 20, No. 4, 69-76 (2016). MSC: 90B35 90C39 PDFBibTeX XMLCite \textit{J. Fan} and \textit{X. Lu}, Oper. Res. Trans. 20, No. 4, 69--76 (2016; Zbl 1374.90155) Full Text: DOI