Nuijten, Wilhelmus Petronella Maria Time and resource constrained scheduling. A constraint satisfaction approach. (English. Dutch summary) Zbl 0837.90068 Eindhoven: Univ. of Technology. x, 157 p. (1994). Reviewer: J.Terno (Dresden) MSC: 90B35 PDFBibTeX XMLCite \textit{W. P. M. Nuijten}, Time and resource constrained scheduling. A constraint satisfaction approach. Eindhoven: Univ. of Technology (1994; Zbl 0837.90068)
Straubel, R.; Holznagel, B.; Wittmüss, A.; Bärmann, U. Heuristic solving of NP-complete job-shop scheduling problems by multicriteria optimization. (English) Zbl 0826.90065 Ríos, Sixto (ed.), Decision theory and decision analysis: trends and challenges. With the assistance and collaboration of David Ríos Insua and Sixto Ríos-Insua. Papers presented at a conference held at the Real Academia de Ciencias de Madrid, Spain, June 2-5, 1993. Boston, MA: Kluwer Academic Publishers. 243-258 (1994). MSC: 90B35 68T35 PDFBibTeX XMLCite \textit{R. Straubel} et al., in: Decision theory and decision analysis: trends and challenges. With the assistance and collaboration of David Ríos Insua and Sixto Ríos-Insua. Papers presented at a conference held at the Real Academia de Ciencias de Madrid, Spain, June 2-5, 1993. Boston, MA: Kluwer Academic Publishers. 243--258 (1994; Zbl 0826.90065)
Józefowska, Joanna; Jurisch, Bernd; Kubiak, Wieslaw Scheduling shops to minimize the weighted number of late jobs. (English) Zbl 0823.90061 Oper. Res. Lett. 16, No. 5, 277-283 (1994). MSC: 90B35 90C39 90C60 PDFBibTeX XMLCite \textit{J. Józefowska} et al., Oper. Res. Lett. 16, No. 5, 277--283 (1994; Zbl 0823.90061) Full Text: DOI
Dewess, G.; Knobloch, E.; Helbig, P. Bounds and initial solutions for frame iteration in machine scheduling. (English) Zbl 0819.90043 Optimization 28, No. 3-4, 339-349 (1994). MSC: 90B35 65C05 PDFBibTeX XMLCite \textit{G. Dewess} et al., Optimization 28, No. 3--4, 339--349 (1994; Zbl 0819.90043) Full Text: DOI
Udo, Godwin J. A simulation study of due-date assignment rules in a dynamic job shop. (English) Zbl 0814.90052 J. Oper. Res. Soc. 45, No. 12, 1425-1435 (1994). MSC: 90B35 PDFBibTeX XMLCite \textit{G. J. Udo}, J. Oper. Res. Soc. 45, No. 12, 1425--1435 (1994; Zbl 0814.90052) Full Text: DOI
Wilhelm, S. The job shop tardiness problem: A corrected model. (English) Zbl 0816.90090 Eur. J. Oper. Res. 79, No. 3, 549-550 (1994). MSC: 90B35 PDFBibTeX XMLCite \textit{S. Wilhelm}, Eur. J. Oper. Res. 79, No. 3, 549--550 (1994; Zbl 0816.90090) Full Text: DOI
Colorni, Alberto; Dorigo, Marco; Maniezzo, Vittorio; Trubian, Marco Ant system for job-shop scheduling. (English) Zbl 0814.90047 Belg. J. Oper. Res. Stat. Comput. Sci. 34, No. 1, 39-53 (1994). MSC: 90B35 90C27 PDFBibTeX XMLCite \textit{A. Colorni} et al., Belg. J. Oper. Res. Stat. Comput. Sci. 34, No. 1, 39--53 (1994; Zbl 0814.90047)
Carlier, J.; Pinson, E. Adjustment of heads and tails for the job-shop problem. (English) Zbl 0812.90063 Eur. J. Oper. Res. 78, No. 2, 146-161 (1994). MSC: 90B35 PDFBibTeX XMLCite \textit{J. Carlier} and \textit{E. Pinson}, Eur. J. Oper. Res. 78, No. 2, 146--161 (1994; Zbl 0812.90063) Full Text: DOI
McCormick, S. T.; Rao, U. S. Some complexity results in cyclic scheduling. (English) Zbl 0810.90071 Math. Comput. Modelling 20, No. 2, 107-122 (1994). MSC: 90B35 90C60 PDFBibTeX XMLCite \textit{S. T. McCormick} and \textit{U. S. Rao}, Math. Comput. Modelling 20, No. 2, 107--122 (1994; Zbl 0810.90071) Full Text: DOI
Janiak, A.; Szkodny, T. Job-shop scheduling with convex models of operations. (English) Zbl 0810.90069 Math. Comput. Modelling 20, No. 2, 59-68 (1994). MSC: 90B35 PDFBibTeX XMLCite \textit{A. Janiak} and \textit{T. Szkodny}, Math. Comput. Modelling 20, No. 2, 59--68 (1994; Zbl 0810.90069) Full Text: DOI
Alfa, A. S.; Dolhun, K. L.; Li, C.-L. A scheduling problem in a semi-open job shop – the case of a cordset manufacturing company. (English) Zbl 0810.90059 Math. Comput. Modelling 20, No. 2, 1-8 (1994). MSC: 90B35 90B30 PDFBibTeX XMLCite \textit{A. S. Alfa} et al., Math. Comput. Modelling 20, No. 2, 1--8 (1994; Zbl 0810.90059) Full Text: DOI
Brucker, Peter; Jurisch, Bernd; Krämer, Andreas The job-shop problem and immediate selection. (English) Zbl 0826.90062 Ann. Oper. Res. 50, 73-114 (1994). Reviewer: H.G.Kahlbacher (Wien) MSC: 90B35 90C60 PDFBibTeX XMLCite \textit{P. Brucker} et al., Ann. Oper. Res. 50, 73--114 (1994; Zbl 0826.90062) Full Text: DOI
Sethi, Suresh; Zhou, Xun Yu Stochastic dynamic job shops and hierarchical production planning. (English) Zbl 0824.93055 IEEE Trans. Autom. Control 39, No. 10, 2061-2076 (1994). Reviewer: K.Uosaki (Tottori) MSC: 93E03 94C15 90B25 93A13 93E20 PDFBibTeX XMLCite \textit{S. Sethi} and \textit{X. Y. Zhou}, IEEE Trans. Autom. Control 39, No. 10, 2061--2076 (1994; Zbl 0824.93055) Full Text: DOI
Wallace, Mark Applying constraints for scheduling. (English) Zbl 0811.90048 Mayoh, Brian (ed.) et al., Constraint programming. Proceedings of the NATO Advanced Study Institute, held in Pärnu, Estonia, August 13-24, 1993. Berlin: Springer-Verlag. NATO ASI Ser., Ser. F, Comput. Syst. Sci. 131, 153-171 (1994). MSC: 90B35 68M20 PDFBibTeX XMLCite \textit{M. Wallace}, NATO ASI Ser., Ser. F, Comput. Syst. Sci. 131, 153--171 (1994; Zbl 0811.90048)
Toker, Ayşegül; Kondakci, Suna; Erkip, Nesim Job shop scheduling under a non-renewable resource constraint. (English) Zbl 0809.90086 J. Oper. Res. Soc. 45, No. 8, 942-947 (1994). MSC: 90B35 PDFBibTeX XMLCite \textit{A. Toker} et al., J. Oper. Res. Soc. 45, No. 8, 942--947 (1994; Zbl 0809.90086) Full Text: DOI
Enns, S. T. Job shop leadtime requirements under conditions of controlled delivery performance. (English) Zbl 0809.90079 Eur. J. Oper. Res. 77, No. 3, 429-439 (1994). MSC: 90B35 90B30 PDFBibTeX XMLCite \textit{S. T. Enns}, Eur. J. Oper. Res. 77, No. 3, 429--439 (1994; Zbl 0809.90079) Full Text: DOI
Serafini, P.; Speranza, M. G. A decomposition approach for a resource constrained scheduling problem. (English) Zbl 0809.90081 Eur. J. Oper. Res. 75, No. 1, 112-135 (1994). MSC: 90B35 PDFBibTeX XMLCite \textit{P. Serafini} and \textit{M. G. Speranza}, Eur. J. Oper. Res. 75, No. 1, 112--135 (1994; Zbl 0809.90081) Full Text: DOI
Dauzère-Péres, Stephane; Lasserre, Jean-Bernard Integration of lotsizing and scheduling decisions in a job-shop. (English) Zbl 0806.90062 Eur. J. Oper. Res. 75, No. 2, 413-426 (1994). MSC: 90B35 90C10 PDFBibTeX XMLCite \textit{S. Dauzère-Péres} and \textit{J.-B. Lasserre}, Eur. J. Oper. Res. 75, No. 2, 413--426 (1994; Zbl 0806.90062) Full Text: DOI
Glass, C. A.; Gupta, J. N. D.; Potts, C. N. Lot streaming in three-stage production processes. (English) Zbl 0824.90079 Eur. J. Oper. Res. 75, No. 2, 378-394 (1994). Reviewer: Y.M.Shafranskij (Minsk) MSC: 90B35 90B30 90C60 PDFBibTeX XMLCite \textit{C. A. Glass} et al., Eur. J. Oper. Res. 75, No. 2, 378--394 (1994; Zbl 0824.90079) Full Text: DOI
Aarts, E. H. L.; van Laarhoven, P. J. M.; Lenstra, J. K.; Ulder, N. L. J. A computational study of local search algorithms for job shop scheduling. (English) Zbl 0819.90040 ORSA J. Comput. 6, No. 2, 118-125 (1994). MSC: 90B35 90-08 PDFBibTeX XMLCite \textit{E. H. L. Aarts} et al., ORSA J. Comput. 6, No. 2, 118--125 (1994; Zbl 0819.90040) Full Text: DOI
Taillard, Éric D. Parallel taboo search techniques for the job shop scheduling problem. (English) Zbl 0807.90066 ORSA J. Comput. 6, No. 2, 108-117 (1994). MSC: 90B35 65Y05 90C06 90-08 PDFBibTeX XMLCite \textit{É. D. Taillard}, ORSA J. Comput. 6, No. 2, 108--117 (1994; Zbl 0807.90066) Full Text: DOI
Leighton, F. T.; Maggs, Bruce M.; Rao, Satish B. Packet routing and job-shop scheduling in \(O\) (congestion + dilation) steps. (English) Zbl 0811.68062 Combinatorica 14, No. 2, 167-186 (1994). Reviewer: H.Daduna (Hamburg) MSC: 68M20 68M10 68M07 PDFBibTeX XMLCite \textit{F. T. Leighton} et al., Combinatorica 14, No. 2, 167--186 (1994; Zbl 0811.68062) Full Text: DOI
Wang, J.; Yang, J.-Q.; Lee, H. Multicriteria order acceptance decision support in over-demanded job shops: A neural network approach. (English) Zbl 0809.68096 Math. Comput. Modelling 19, No. 5, 1-19 (1994). MSC: 68T05 68T20 PDFBibTeX XMLCite \textit{J. Wang} et al., Math. Comput. Modelling 19, No. 5, 1--19 (1994; Zbl 0809.68096) Full Text: DOI
Dauzère-Péres, Stéphane; Lasserre, Jean-Bernard An integrated approach in production planning and scheduling. (English) Zbl 0816.90070 Lecture Notes in Economics and Mathematical Systems. 411. Berlin: Springer-Verlag. xvi, 137 p. (1994). Reviewer: S.Goyal (Montreal) MSC: 90B30 90B35 90-01 PDFBibTeX XMLCite \textit{S. Dauzère-Péres} and \textit{J.-B. Lasserre}, An integrated approach in production planning and scheduling. Berlin: Springer-Verlag (1994; Zbl 0816.90070)
Brucker, Peter; Jurisch, Bernd; Sievers, Bernd A branch and bound algorithm for the job-shop scheduling problem. (English) Zbl 0802.90057 Discrete Appl. Math. 49, No. 1-3, 107-127 (1994). Reviewer: R.Słowinski (Poznań) MSC: 90B35 90C60 68M20 90-08 PDFBibTeX XMLCite \textit{P. Brucker} et al., Discrete Appl. Math. 49, No. 1--3, 107--127 (1994; Zbl 0802.90057) Full Text: DOI
Brucker, Peter A polynomial algorithm for the two machine job-shop scheduling problem with a fixed number of jobs. (English) Zbl 0807.90061 OR Spektrum 16, No. 1, 5-7 (1994). Reviewer: Y.M.Shafranskij (Minsk) MSC: 90B35 90C60 PDFBibTeX XMLCite \textit{P. Brucker}, OR Spektrum 16, No. 1, 5--7 (1994; Zbl 0807.90061) Full Text: DOI
Hanen, Claire Study of a NP-hard cyclic scheduling problem: The recurrent job-shop. (English) Zbl 0801.90061 Eur. J. Oper. Res. 72, No. 1, 82-101 (1994). MSC: 90B35 90C60 PDFBibTeX XMLCite \textit{C. Hanen}, Eur. J. Oper. Res. 72, No. 1, 82--101 (1994; Zbl 0801.90061) Full Text: DOI
Morrice, Douglas J.; Gajulapalli, Ravindra S.; Tayur, Sridhar R. A single server queue with cyclically indexed arrival and service rates. (English) Zbl 0802.68012 Queueing Syst. 15, No. 1-4, 165-198 (1994). MSC: 68M20 68U20 PDFBibTeX XMLCite \textit{D. J. Morrice} et al., Queueing Syst. 15, No. 1--4, 165--198 (1994; Zbl 0802.68012) Full Text: DOI
Gunasekaran, A.; Goyal, S. K.; Martikainen, T.; Yli-Olli, P. Economic scheduling of a new order in a job-shop production system. (English) Zbl 0798.90078 Int. J. Syst. Sci. 25, No. 2, 365-376 (1994). MSC: 90B30 90B35 90B05 PDFBibTeX XMLCite \textit{A. Gunasekaran} et al., Int. J. Syst. Sci. 25, No. 2, 365--376 (1994; Zbl 0798.90078) Full Text: DOI
Hurink, Johann; Jurisch, Bernd; Thole, Monika Tabu search for the job-shop scheduling problem with multi-purpose machines. (English) Zbl 0798.90086 OR Spektrum 15, No. 4, 205-215 (1994). MSC: 90B35 90B30 90C27 PDFBibTeX XMLCite \textit{J. Hurink} et al., OR Spektrum 15, No. 4, 205--215 (1994; Zbl 0798.90086) Full Text: DOI
Bahouth, S. B.; Foote, B. L. Managing a two-bottleneck job shop with a two-machine flow shop algorithm. (English) Zbl 0902.90096 Int. J. Prod. Res. 32, No. 10, 2463-2477 (1994). MSC: 90B35 90B30 PDFBibTeX XMLCite \textit{S. B. Bahouth} and \textit{B. L. Foote}, Int. J. Prod. Res. 32, No. 10, 2463--2477 (1994; Zbl 0902.90096) Full Text: DOI
Sim, S. K.; Yeo, K. T.; Lee, W. H. An expert neural network system for dynamic job shop scheduling. (English) Zbl 0906.90094 Int. J. Prod. Res. 32, No. 8, 1759-1773 (1994). MSC: 90B35 68T05 PDFBibTeX XMLCite \textit{S. K. Sim} et al., Int. J. Prod. Res. 32, No. 8, 1759--1773 (1994; Zbl 0906.90094) Full Text: DOI
Kim, S. C.; Bobrowski, P. M. Impact of sequence-dependent setup time on job shop scheduling performance. (English) Zbl 0901.90130 Int. J. Prod. Res. 32, No. 7, 1503-1520 (1994). MSC: 90B35 90B30 PDFBibTeX XMLCite \textit{S. C. Kim} and \textit{P. M. Bobrowski}, Int. J. Prod. Res. 32, No. 7, 1503--1520 (1994; Zbl 0901.90130) Full Text: DOI
Melnyk, S. A.; Tan, K. C.; Denzler, D. R.; Fredendall, L. Evaluating variance control, order review/release and dispatching: A regression analysis. (English) Zbl 0902.90100 Int. J. Prod. Res. 32, No. 5, 1045-1061 (1994). MSC: 90B35 90B30 PDFBibTeX XMLCite \textit{S. A. Melnyk} et al., Int. J. Prod. Res. 32, No. 5, 1045--1061 (1994; Zbl 0902.90100) Full Text: DOI
Grabot, B.; Geneste, L. Dispatching rules in scheduling: A fuzzy approach. (English) Zbl 0899.90111 Int. J. Prod. Res. 32, No. 4, 903-915 (1994). MSC: 90B35 PDFBibTeX XMLCite \textit{B. Grabot} and \textit{L. Geneste}, Int. J. Prod. Res. 32, No. 4, 903--915 (1994; Zbl 0899.90111) Full Text: DOI