Cheong, Taesu; White, Chelsea C. III Inventory replenishment control under supply uncertainty. (English) Zbl 1274.90017 Ann. Oper. Res. 208, 581-592 (2013). MSC: 90B05 90C40 PDF BibTeX XML Cite \textit{T. Cheong} and \textit{C. C. White III}, Ann. Oper. Res. 208, 581--592 (2013; Zbl 1274.90017) Full Text: DOI OpenURL
Konak, Abdullah; Bartolacci, Michael R.; Gavish, Bezalel A dynamic programming approach for batch sizing in a multi-stage production process with random yields. (English) Zbl 1233.90142 Appl. Math. Comput. 218, No. 4, 1399-1406 (2011). MSC: 90B30 90C90 PDF BibTeX XML Cite \textit{A. Konak} et al., Appl. Math. Comput. 218, No. 4, 1399--1406 (2011; Zbl 1233.90142) Full Text: DOI OpenURL
Hou, Kuo-Lung; Lin, Li-Chiao Investing in setup reduction in the EOQ model with random yields under a limited capital budget. (English) Zbl 1218.90019 J. Inf. Optim. Sci. 32, No. 1, 75-83 (2011). MSC: 90B05 91G50 PDF BibTeX XML Cite \textit{K.-L. Hou} and \textit{L.-C. Lin}, J. Inf. Optim. Sci. 32, No. 1, 75--83 (2011; Zbl 1218.90019) Full Text: DOI Link OpenURL
Pan, Wenting; So, Kut C. Optimal product pricing and component production quantities for an assembly system under supply uncertainty. (English) Zbl 1231.90050 Oper. Res. 58, No. 6, 1792-1797 (2010). MSC: 90B05 90B30 91B24 PDF BibTeX XML Cite \textit{W. Pan} and \textit{K. C. So}, Oper. Res. 58, No. 6, 1792--1797 (2010; Zbl 1231.90050) Full Text: DOI OpenURL
Lin, L.-C.; Hou, K.-L. An inventory system with investment to reduce yield variability and set-up cost. (English) Zbl 1122.90306 J. Oper. Res. Soc. 56, No. 1, 67-74 (2005). MSC: 90B05 PDF BibTeX XML Cite \textit{L. C. Lin} and \textit{K. L. Hou}, J. Oper. Res. Soc. 56, No. 1, 67--74 (2005; Zbl 1122.90306) Full Text: DOI OpenURL
Lin, Li-Chiao; Hou, Kuo-Lung Optimal ordering policies and capital investment in setup reduction for continuous review inventory system with random yields. (English) Zbl 1139.90313 J. Stat. Manag. Syst. 6, No. 1, 65-77 (2003). MSC: 90B05 90C05 90B30 PDF BibTeX XML Cite \textit{L.-C. Lin} and \textit{K.-L. Hou}, J. Stat. Manag. Syst. 6, No. 1, 65--77 (2003; Zbl 1139.90313) Full Text: DOI OpenURL
Grosfeld-Nir, Abraham; Gerchak, Yigal Multistage production to order with rework capability. (English) Zbl 1232.90184 Manage. Sci. 48, No. 5, 652-664 (2002). MSC: 90B30 PDF BibTeX XML Cite \textit{A. Grosfeld-Nir} and \textit{Y. Gerchak}, Manage. Sci. 48, No. 5, 652--664 (2002; Zbl 1232.90184) Full Text: DOI OpenURL
Agnihothri, Sal; Lee, Ji Soo; Kim, Jeongseob Lot sizing with random yields and tardiness costs. (English) Zbl 0956.90001 Comput. Oper. Res. 27, No. 5, 437-459 (2000). MSC: 90B05 90B30 PDF BibTeX XML Cite \textit{S. Agnihothri} et al., Comput. Oper. Res. 27, No. 5, 437--459 (2000; Zbl 0956.90001) Full Text: DOI OpenURL
Wang, Yunzeng; Gerchak, Yigal Periodic review production models with variable capacity, random yield, and uncertain demand. (English) Zbl 0851.90059 Manage. Sci. 42, No. 1, 130-137 (1996). MSC: 90B30 90B05 PDF BibTeX XML Cite \textit{Y. Wang} and \textit{Y. Gerchak}, Manage. Sci. 42, No. 1, 130--137 (1996; Zbl 0851.90059) Full Text: DOI OpenURL
Yano, Candace Arai; Lee, Hau L. Lot sizing with random yields: A review. (English) Zbl 0832.90031 Oper. Res. 43, No. 2, 311-334 (1995). MSC: 90B05 PDF BibTeX XML Cite \textit{C. A. Yano} and \textit{H. L. Lee}, Oper. Res. 43, No. 2, 311--334 (1995; Zbl 0832.90031) Full Text: DOI Link OpenURL
Grosfeld-Nir, Abraham; Robinson, Lawrence W. Production to order on a two machine line with random yields and rigid demand. (English) Zbl 0928.90020 Eur. J. Oper. Res. 80, No. 2, 264-276 (1995). MSC: 90B30 PDF BibTeX XML Cite \textit{A. Grosfeld-Nir} and \textit{L. W. Robinson}, Eur. J. Oper. Res. 80, No. 2, 264--276 (1995; Zbl 0928.90020) Full Text: DOI OpenURL