Hill, Alessandro; Brickey, Andrea J.; Cipriano, Italo; Goycoolea, Marcos; Newman, Alexandra Optimization strategies for resource-constrained project scheduling problems in underground mining. (English) Zbl 07640780 INFORMS J. Comput. 34, No. 6, 3042-3058 (2022). MSC: 90B35 PDF BibTeX XML Cite \textit{A. Hill} et al., INFORMS J. Comput. 34, No. 6, 3042--3058 (2022; Zbl 07640780) Full Text: DOI OpenURL
Van Eynde, Rob; Vanhoucke, Mario A theoretical framework for instance complexity of the resource-constrained project scheduling problem. (English) Zbl 07639665 Math. Oper. Res. 47, No. 4, 3156-3183 (2022). MSC: 06A07 05C30 90B35 PDF BibTeX XML Cite \textit{R. Van Eynde} and \textit{M. Vanhoucke}, Math. Oper. Res. 47, No. 4, 3156--3183 (2022; Zbl 07639665) Full Text: DOI OpenURL
Watermeyer, Kai; Zimmermann, Jürgen A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints. (English) Zbl 1493.90072 OR Spectrum 44, No. 2, 575-602 (2022). MSC: 90B35 90B50 90C57 PDF BibTeX XML Cite \textit{K. Watermeyer} and \textit{J. Zimmermann}, OR Spectrum 44, No. 2, 575--602 (2022; Zbl 1493.90072) Full Text: DOI OpenURL
Hill, Alessandro; Ticktin, Jordan; Vossen, Thomas W. M. A computational study of constraint programming approaches for resource-constrained project scheduling with autonomous learning effects. (English) Zbl 07493619 Stuckey, Peter J. (ed.), Integration of constraint programming, artificial intelligence, and operations research. 18th international conference, CPAIOR 2021, Vienna, Austria, July 5–8, 2021. Proceedings. Cham: Springer. Lect. Notes Comput. Sci. 12735, 26-44 (2021). MSC: 68T20 90C27 PDF BibTeX XML Cite \textit{A. Hill} et al., Lect. Notes Comput. Sci. 12735, 26--44 (2021; Zbl 07493619) Full Text: DOI OpenURL
Vanhoucke, Mario; Coelho, José An analysis of network and resource indicators for resource-constrained project scheduling problem instances. (English) Zbl 07485310 Comput. Oper. Res. 132, Article ID 105260, 12 p. (2021). MSC: 90Bxx PDF BibTeX XML Cite \textit{M. Vanhoucke} and \textit{J. Coelho}, Comput. Oper. Res. 132, Article ID 105260, 12 p. (2021; Zbl 07485310) Full Text: DOI OpenURL
Xie, Fang; Li, Haitao; Xu, Zhe An approximate dynamic programming approach to project scheduling with uncertain resource availabilities. (English) Zbl 1481.90194 Appl. Math. Modelling 97, 226-243 (2021). MSC: 90B36 90C39 90C40 PDF BibTeX XML Cite \textit{F. Xie} et al., Appl. Math. Modelling 97, 226--243 (2021; Zbl 1481.90194) Full Text: DOI OpenURL
Canca, David; Andrade-Pineda, José Luis; De-Los-Santos, Alicia; González-R, Pedro Luis A quantitative approach for the long-term assessment of railway rapid transit network construction or expansion projects. (English) Zbl 1487.90277 Eur. J. Oper. Res. 294, No. 2, 604-621 (2021). MSC: 90B35 90B06 90B10 90C11 90C57 PDF BibTeX XML Cite \textit{D. Canca} et al., Eur. J. Oper. Res. 294, No. 2, 604--621 (2021; Zbl 1487.90277) Full Text: DOI OpenURL
Balouka, Noemie; Cohen, Izack A robust optimization approach for the multi-mode resource-constrained project scheduling problem. (English) Zbl 1487.90268 Eur. J. Oper. Res. 291, No. 2, 457-470 (2021). MSC: 90B35 90C17 PDF BibTeX XML Cite \textit{N. Balouka} and \textit{I. Cohen}, Eur. J. Oper. Res. 291, No. 2, 457--470 (2021; Zbl 1487.90268) Full Text: DOI OpenURL
Snauwaert, Jakob; Vanhoucke, Mario A new algorithm for resource-constrained project scheduling with breadth and depth of skills. (English) Zbl 1487.90324 Eur. J. Oper. Res. 292, No. 1, 43-59 (2021). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{J. Snauwaert} and \textit{M. Vanhoucke}, Eur. J. Oper. Res. 292, No. 1, 43--59 (2021; Zbl 1487.90324) Full Text: DOI OpenURL
Song, Jie; Martens, Annelies; Vanhoucke, Mario Using schedule risk analysis with resource constraints for project control. (English) Zbl 1487.90325 Eur. J. Oper. Res. 288, No. 3, 736-752 (2021). MSC: 90B35 PDF BibTeX XML Cite \textit{J. Song} et al., Eur. J. Oper. Res. 288, No. 3, 736--752 (2021; Zbl 1487.90325) Full Text: DOI OpenURL
Wang, Qiang; Liu, Changchun; Zheng, Li A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource. (English) Zbl 07637136 Eng. Optim. 52, No. 5, 798-816 (2020). MSC: 90-XX PDF BibTeX XML Cite \textit{Q. Wang} et al., Eng. Optim. 52, No. 5, 798--816 (2020; Zbl 07637136) Full Text: DOI OpenURL
Goto, Hiroyuki; Murray, Alan T. Exact and flexible solution approach to a critical chain project management problem. (English) Zbl 1479.90089 Constraints 25, No. 3-4, 280-297 (2020). MSC: 90B35 90C11 90C05 PDF BibTeX XML Cite \textit{H. Goto} and \textit{A. T. Murray}, Constraints 25, No. 3--4, 280--297 (2020; Zbl 1479.90089) Full Text: DOI OpenURL
Coelho, José; Vanhoucke, Mario Going to the core of hard resource-constrained project scheduling instances. (English) Zbl 1458.90278 Comput. Oper. Res. 121, Article ID 104976, 16 p. (2020). MSC: 90B35 PDF BibTeX XML Cite \textit{J. Coelho} and \textit{M. Vanhoucke}, Comput. Oper. Res. 121, Article ID 104976, 16 p. (2020; Zbl 1458.90278) Full Text: DOI Link OpenURL
Hu, Xuejun; Wang, Jianjiang; Cui, Nanfang; Huang, Hao Robust resource allocation method for the RCPSP from a resource transferring perspective. (Chinese. English summary) Zbl 1463.91065 J. Syst. Eng. 35, No. 2, 173-187 (2020). MSC: 91B32 90B36 90C59 PDF BibTeX XML Cite \textit{X. Hu} et al., J. Syst. Eng. 35, No. 2, 173--187 (2020; Zbl 1463.91065) Full Text: DOI OpenURL
Watermeyer, Kai; Zimmermann, Jürgen A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints. (English) Zbl 1446.90087 OR Spectrum 42, No. 2, 427-460 (2020). MSC: 90B35 90C57 PDF BibTeX XML Cite \textit{K. Watermeyer} and \textit{J. Zimmermann}, OR Spectrum 42, No. 2, 427--460 (2020; Zbl 1446.90087) Full Text: DOI OpenURL
Xiang, Qian; Zhou, Yayun; Lv, Zhijun Improved differential evolution parameter control and bidirectional scheduling algorithm for the resource-constrained project. (Chinese. English summary) Zbl 1449.90377 Acta Autom. Sin. 46, No. 2, 283-293 (2020). MSC: 90C59 90B35 PDF BibTeX XML Cite \textit{Q. Xiang} et al., Acta Autom. Sin. 46, No. 2, 283--293 (2020; Zbl 1449.90377) Full Text: DOI OpenURL
Tesch, Alexander A polyhedral study of event-based models for the resource-constrained project scheduling problem. (English) Zbl 1436.90056 J. Sched. 23, No. 2, 233-251 (2020). MSC: 90B35 68M20 90C11 PDF BibTeX XML Cite \textit{A. Tesch}, J. Sched. 23, No. 2, 233--251 (2020; Zbl 1436.90056) Full Text: DOI OpenURL
Kosztyán, Zsolt T.; Szalkai, István Multimode resource-constrained project scheduling in flexible projects. (English) Zbl 1442.90076 J. Glob. Optim. 76, No. 1, 211-241 (2020). MSC: 90B35 PDF BibTeX XML Cite \textit{Z. T. Kosztyán} and \textit{I. Szalkai}, J. Glob. Optim. 76, No. 1, 211--241 (2020; Zbl 1442.90076) Full Text: DOI OpenURL
Araujo, Janniele A. S.; Santos, Haroldo G.; Gendron, Bernard; Jena, Sanjay Dominik; Brito, Samuel S.; Souza, Danilo S. Strong bounds for resource constrained project scheduling: preprocessing and cutting planes. (English) Zbl 1458.90247 Comput. Oper. Res. 113, Article ID 104782, 16 p. (2020). MSC: 90B35 90C11 PDF BibTeX XML Cite \textit{J. A. S. Araujo} et al., Comput. Oper. Res. 113, Article ID 104782, 16 p. (2020; Zbl 1458.90247) Full Text: DOI arXiv OpenURL
Lazarev, Alexander; Khusnullin, Nail; Musatova, Elena; Yadrentsev, Denis; Kharlamov, Maxim; Ponomarev, Konstantin Minimization of the weighted total sparsity of cosmonaut training courses. (English) Zbl 1465.90113 Evtushenko, Yury (ed.) et al., Optimization and applications. 9th international conference, OPTIMA 2018, Petrovac, Montenegro, October 1–5, 2018. Revised selected papers. Cham: Springer. Commun. Comput. Inf. Sci. 974, 202-215 (2019). MSC: 90C35 90C59 PDF BibTeX XML Cite \textit{A. Lazarev} et al., Commun. Comput. Inf. Sci. 974, 202--215 (2019; Zbl 1465.90113) Full Text: DOI OpenURL
Gimadi, E. Kh.; Goncharov, E. N.; Mishin, D. V. On some implementations of solving the resource constrained project scheduling problems. (English) Zbl 1474.90144 Yugosl. J. Oper. Res. 29, No. 1, 31-42 (2019). MSC: 90B35 90C27 90C57 PDF BibTeX XML Cite \textit{E. Kh. Gimadi} et al., Yugosl. J. Oper. Res. 29, No. 1, 31--42 (2019; Zbl 1474.90144) Full Text: DOI OpenURL
Tirkolaee, Erfan Babaee; Goli, Alireza; Hematian, Milad; Sangaiah, Arun Kumar; Han, Tao Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms. (English) Zbl 1462.90052 Computing 101, No. 6, 547-570 (2019). MSC: 90B35 PDF BibTeX XML Cite \textit{E. B. Tirkolaee} et al., Computing 101, No. 6, 547--570 (2019; Zbl 1462.90052) Full Text: DOI OpenURL
Beşikçi, Umut; Bilge, Ümit; Ulusoy, Gündüz Resource portfolio problem under relaxed resource dedication policy in multi-mode multi-project scheduling. (English) Zbl 1452.90165 Int. J. Math. Oper. Res. 14, No. 4, 541-567 (2019). MSC: 90B35 90B50 90C57 91B32 PDF BibTeX XML Cite \textit{U. Beşikçi} et al., Int. J. Math. Oper. Res. 14, No. 4, 541--567 (2019; Zbl 1452.90165) OpenURL
Servranckx, Tom; Vanhoucke, Mario A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs. (English) Zbl 1403.90657 Eur. J. Oper. Res. 273, No. 3, 841-860 (2019). MSC: 90C59 90B35 PDF BibTeX XML Cite \textit{T. Servranckx} and \textit{M. Vanhoucke}, Eur. J. Oper. Res. 273, No. 3, 841--860 (2019; Zbl 1403.90657) Full Text: DOI Link OpenURL
Chand, Shelvin; Huynh, Quang; Singh, Hemant; Ray, Tapabrata; Wagner, Markus On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems. (English) Zbl 1461.90040 Inf. Sci. 432, 146-163 (2018). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{S. Chand} et al., Inf. Sci. 432, 146--163 (2018; Zbl 1461.90040) Full Text: DOI OpenURL
Almeida, Bernardo F.; Correia, Isabel; Saldanha-da-Gama, Francisco A biased random-key genetic algorithm for the project scheduling problem with flexible resources. (English) Zbl 1394.90261 Top 26, No. 2, 283-308 (2018). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{B. F. Almeida} et al., Top 26, No. 2, 283--308 (2018; Zbl 1394.90261) Full Text: DOI OpenURL
Chen, Zhi; Demeulemeester, Erik; Bai, Sijun; Guo, Yuntao Efficient priority rules for the stochastic resource-constrained project scheduling problem. (English) Zbl 1403.90383 Eur. J. Oper. Res. 270, No. 3, 957-967 (2018). MSC: 90B36 90B35 PDF BibTeX XML Cite \textit{Z. Chen} et al., Eur. J. Oper. Res. 270, No. 3, 957--967 (2018; Zbl 1403.90383) Full Text: DOI OpenURL
Coelho, José; Vanhoucke, Mario An exact composite lower bound strategy for the resource-constrained project scheduling problem. (English) Zbl 1391.90250 Comput. Oper. Res. 93, 135-150 (2018). MSC: 90B35 PDF BibTeX XML Cite \textit{J. Coelho} and \textit{M. Vanhoucke}, Comput. Oper. Res. 93, 135--150 (2018; Zbl 1391.90250) Full Text: DOI OpenURL
Muñoz, Gonzalo; Espinoza, Daniel; Goycoolea, Marcos; Moreno, Eduardo; Queyranne, Maurice; Letelier, Orlando Rivera A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling. (English) Zbl 1403.90353 Comput. Optim. Appl. 69, No. 2, 501-534 (2018). MSC: 90B35 90C05 PDF BibTeX XML Cite \textit{G. Muñoz} et al., Comput. Optim. Appl. 69, No. 2, 501--534 (2018; Zbl 1403.90353) Full Text: DOI arXiv OpenURL
Sajadi, Seyed Mojtaba; Azimi, Parham; Ghamginzadeh, Arman; Rahimzadeh, Ayub A new fuzzy multi-objective multi-mode resource-constrained project scheduling model. (English) Zbl 1452.90172 Int. J. Math. Oper. Res. 11, No. 1, 45-66 (2017). MSC: 90B35 90C29 90C70 PDF BibTeX XML Cite \textit{S. M. Sajadi} et al., Int. J. Math. Oper. Res. 11, No. 1, 45--66 (2017; Zbl 1452.90172) Full Text: DOI OpenURL
Artigues, Christian On the strength of time-indexed formulations for the resource-constrained project scheduling problem. (English) Zbl 1409.90085 Oper. Res. Lett. 45, No. 2, 154-159 (2017). MSC: 90B35 90C11 90C57 PDF BibTeX XML Cite \textit{C. Artigues}, Oper. Res. Lett. 45, No. 2, 154--159 (2017; Zbl 1409.90085) Full Text: DOI HAL OpenURL
Geiger, Martin Josef A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem. (English) Zbl 1394.90272 Eur. J. Oper. Res. 256, No. 3, 729-741 (2017). MSC: 90B35 90C59 90B36 68M20 90C60 PDF BibTeX XML Cite \textit{M. J. Geiger}, Eur. J. Oper. Res. 256, No. 3, 729--741 (2017; Zbl 1394.90272) Full Text: DOI OpenURL
Goncharov, E. N.; Leonov, Valentin V. Genetic algorithm for the resource-constrained project scheduling problem. (English. Russian original) Zbl 1369.90075 Autom. Remote Control 78, No. 6, 1101-1114 (2017); translation from Avtom. Telemekh. 2017, No. 6, 173-190 (2017). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{E. N. Goncharov} and \textit{V. V. Leonov}, Autom. Remote Control 78, No. 6, 1101--1114 (2017; Zbl 1369.90075); translation from Avtom. Telemekh. 2017, No. 6, 173--190 (2017) Full Text: DOI OpenURL
Zoraghi, Nima; Shahsavar, Aria; Abbasi, Babak; Van Peteghem, Vincent Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies. (English) Zbl 1360.90007 Top 25, No. 1, 49-79 (2017). MSC: 90-02 90B35 90B05 90C11 PDF BibTeX XML Cite \textit{N. Zoraghi} et al., Top 25, No. 1, 49--79 (2017; Zbl 1360.90007) Full Text: DOI OpenURL
Palacio, Juan D.; Larrea, Olga L. A lexicographic approach to the robust resource-constrained project scheduling problem. (English) Zbl 1358.90048 Int. Trans. Oper. Res. 24, No. 1-2, 143-157 (2017). MSC: 90B35 90C11 PDF BibTeX XML Cite \textit{J. D. Palacio} and \textit{O. L. Larrea}, Int. Trans. Oper. Res. 24, No. 1--2, 143--157 (2017; Zbl 1358.90048) Full Text: DOI OpenURL
Klimek, Marcin; Łebkowski, Piotr Insertion algorithms with justification for solving the resource-constrained project scheduling. (English) Zbl 1474.90153 Decis. Mak. Manuf. Serv. 10, No. 1-2, 31-43 (2016). MSC: 90B35 PDF BibTeX XML Cite \textit{M. Klimek} and \textit{P. Łebkowski}, Decis. Mak. Manuf. Serv. 10, No. 1--2, 31--43 (2016; Zbl 1474.90153) Full Text: DOI OpenURL
van Bevern, René; Bredereck, Robert; Bulteau, Laurent; Komusiewicz, Christian; Talmon, Nimrod; Woeginger, Gerhard J. Precedence-constrained scheduling problems parameterized by partial order width. (English) Zbl 1385.90010 Kochetov, Yury (ed.) et al., Discrete optimization and operations research. 9th international conference, DOOR 2016, Vladivostok, Russia, September 19–23, 2016. Proceedings. Cham: Springer (ISBN 978-3-319-44913-5/pbk; 978-3-319-44914-2/ebook). Lecture Notes in Computer Science 9869, 105-120 (2016). MSC: 90B35 PDF BibTeX XML Cite \textit{R. van Bevern} et al., Lect. Notes Comput. Sci. 9869, 105--120 (2016; Zbl 1385.90010) Full Text: DOI arXiv OpenURL
Fasano, Giorgio Resource-constrained scheduling with non-constant capacity and non-regular activities. (English) Zbl 1380.90113 Fasano, Giorgio (ed.) et al., Space engineering. Modeling and optimization with case studies. Cham: Springer (ISBN 978-3-319-41506-2/hbk; 978-3-319-41508-6/ebook). Springer Optimization and Its Applications 114, 103-128 (2016). MSC: 90B35 90C11 90C26 PDF BibTeX XML Cite \textit{G. Fasano}, Springer Optim. Appl. 114, 103--128 (2016; Zbl 1380.90113) Full Text: DOI OpenURL
Salazar-García, Carlos A.; Montoya-Torres, Jairo R.; Alfonso-Lizarazo, Edgar H. Scheduling of multiple projects with constrained resources and preemption. (English) Zbl 1362.90212 Int. J. Oper. Res. 27, No. 1-2, 127-148 (2016). MSC: 90B35 90B50 PDF BibTeX XML Cite \textit{C. A. Salazar-García} et al., Int. J. Oper. Res. 27, No. 1--2, 127--148 (2016; Zbl 1362.90212) Full Text: DOI OpenURL
He, Jieguang; Chen, Xindu; Chen, Xin A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling. (English) Zbl 1349.90353 Comput. Oper. Res. 71, 71-81 (2016). MSC: 90B35 68M20 PDF BibTeX XML Cite \textit{J. He} et al., Comput. Oper. Res. 71, 71--81 (2016; Zbl 1349.90353) Full Text: DOI OpenURL
Poppenborg, Jens; Knust, Sigrid Modeling and optimizing the evacuation of hospitals based on the MRCPSP with resource transfers. (English) Zbl 1349.90388 EURO J. Comput. Optim. 4, No. 3-4, 349-380 (2016). MSC: 90B35 90C27 PDF BibTeX XML Cite \textit{J. Poppenborg} and \textit{S. Knust}, EURO J. Comput. Optim. 4, No. 3--4, 349--380 (2016; Zbl 1349.90388) Full Text: DOI OpenURL
Kreter, Stefan; Rieck, Julia; Zimmermann, Jürgen Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars. (English) Zbl 1346.90361 Eur. J. Oper. Res. 251, No. 2, 387-403 (2016). MSC: 90B35 90B50 90C10 PDF BibTeX XML Cite \textit{S. Kreter} et al., Eur. J. Oper. Res. 251, No. 2, 387--403 (2016; Zbl 1346.90361) Full Text: DOI OpenURL
Xiao, Jing; Wu, Zhou; Hong, Xi-Xi; Tang, Jian-Chao; Tang, Yong Integration of electromagnetism with multi-objective evolutionary algorithms for RCPSP. (English) Zbl 1346.90398 Eur. J. Oper. Res. 251, No. 1, 22-35 (2016). MSC: 90B35 90C29 90C59 PDF BibTeX XML Cite \textit{J. Xiao} et al., Eur. J. Oper. Res. 251, No. 1, 22--35 (2016; Zbl 1346.90398) Full Text: DOI OpenURL
Zhang, Song; Chen, Huaping; Liu, Jian Research on the complicated time-constrained project scheduling in water conservancy. (Chinese. English summary) Zbl 1363.90101 J. Syst. Eng. 31, No. 1, 135-144 (2016). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{S. Zhang} et al., J. Syst. Eng. 31, No. 1, 135--144 (2016; Zbl 1363.90101) Full Text: DOI OpenURL
Faghih-Mohammadi, Fatemeh; Seifi, Abbas; Khalighi-Sikaroudi, Mohammad A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting. (English) Zbl 1333.90041 RAIRO, Oper. Res. 50, No. 1, 91-118 (2016). MSC: 90B35 68M20 91B32 PDF BibTeX XML Cite \textit{F. Faghih-Mohammadi} et al., RAIRO, Oper. Res. 50, No. 1, 91--118 (2016; Zbl 1333.90041) Full Text: DOI OpenURL
Xiong, Jian; Chen, Yingwu; Zhou, Zhongbao Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations. (English) Zbl 1326.90032 J. Ind. Manag. Optim. 12, No. 2, 719-737 (2016). MSC: 90B35 90B50 68M20 90C31 PDF BibTeX XML Cite \textit{J. Xiong} et al., J. Ind. Manag. Optim. 12, No. 2, 719--737 (2016; Zbl 1326.90032) Full Text: DOI OpenURL
Zhang, Zhe; Xu, Jiuping Bi-level multiple mode resource-constrained project scheduling problems under hybrid uncertainty. (English) Zbl 1322.93016 J. Ind. Manag. Optim. 12, No. 2, 565-593 (2016). MSC: 93A30 90B50 93E03 93A13 90C29 PDF BibTeX XML Cite \textit{Z. Zhang} and \textit{J. Xu}, J. Ind. Manag. Optim. 12, No. 2, 565--593 (2016; Zbl 1322.93016) Full Text: DOI OpenURL
Rezaeian, J.; Soleimani, Farham; Mohaselafshary, Somayeh; Arab, Ali Using a meta-heuristic algorithm for solving the multi-mode resource-constrained project scheduling problem. (English) Zbl 1362.90209 Int. J. Oper. Res. 24, No. 1, 1-16 (2015). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{J. Rezaeian} et al., Int. J. Oper. Res. 24, No. 1, 1--16 (2015; Zbl 1362.90209) Full Text: DOI OpenURL
Cheng, Junzilan; Fowler, John; Kempf, Karl; Mason, Scott Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting. (English) Zbl 1348.90348 Comput. Oper. Res. 53, 275-287 (2015). MSC: 90B50 90B35 90C59 PDF BibTeX XML Cite \textit{J. Cheng} et al., Comput. Oper. Res. 53, 275--287 (2015; Zbl 1348.90348) Full Text: DOI OpenURL
Li, Haitao; Womer, Norman K. Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming. (English) Zbl 1346.90405 Eur. J. Oper. Res. 246, No. 1, 20-33 (2015). MSC: 90B36 90C39 PDF BibTeX XML Cite \textit{H. Li} and \textit{N. K. Womer}, Eur. J. Oper. Res. 246, No. 1, 20--33 (2015; Zbl 1346.90405) Full Text: DOI OpenURL
Wang, Ling; Zheng, Huanyu A teaching-learning-based optimization algorithm for multi-objective resource constrained project scheduling problem. (Chinese. English summary) Zbl 1349.90447 Control Decis. 30, No. 10, 1868-1872 (2015). MSC: 90B36 90C29 65K10 PDF BibTeX XML Cite \textit{L. Wang} and \textit{H. Zheng}, Control Decis. 30, No. 10, 1868--1872 (2015; Zbl 1349.90447) Full Text: DOI OpenURL
Zhang, Lieping; Luo, Yingxiong; Zhang, Yu Hybrid particle swarm and differential evolution algorithm for solving multimode resource-constrained project scheduling problem. (English) Zbl 1331.93067 J. Control Sci. Eng. 2015, Article ID 923791, 6 p. (2015). MSC: 93B40 90B36 90C59 PDF BibTeX XML Cite \textit{L. Zhang} et al., J. Control Sci. Eng. 2015, Article ID 923791, 6 p. (2015; Zbl 1331.93067) Full Text: DOI OpenURL
Niemeier, Martin; Wiese, Andreas Scheduling with an orthogonal resource constraint. (English) Zbl 1325.68038 Algorithmica 71, No. 4, 837-858 (2015). MSC: 68M20 68W25 90B35 PDF BibTeX XML Cite \textit{M. Niemeier} and \textit{A. Wiese}, Algorithmica 71, No. 4, 837--858 (2015; Zbl 1325.68038) Full Text: DOI Link OpenURL
Dupont de Dinechin, Benoît; Munier Kordon, Alix Converging to periodic schedules for cyclic scheduling problems with resources and deadlines. (English) Zbl 1348.90253 Comput. Oper. Res. 51, 227-236 (2014). MSC: 90B35 68M20 PDF BibTeX XML Cite \textit{B. Dupont de Dinechin} and \textit{A. Munier Kordon}, Comput. Oper. Res. 51, 227--236 (2014; Zbl 1348.90253) Full Text: DOI OpenURL
Nabipoor Afruzi, Elham; Najafi, Amir Abbas; Roghanian, Emad; Mazinani, Mostafa A multi-objective imperialist competitive algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations. (English) Zbl 1348.90359 Comput. Oper. Res. 50, 80-96 (2014). MSC: 90B50 90C29 90B35 PDF BibTeX XML Cite \textit{E. Nabipoor Afruzi} et al., Comput. Oper. Res. 50, 80--96 (2014; Zbl 1348.90359) Full Text: DOI OpenURL
Goncharov, E. N. A stochastic greedy algorithm for the resource-constrained project scheduling problem. (Russian) Zbl 1324.90194 Diskretn. Anal. Issled. Oper. 21, No. 3, 11-24 (2014). MSC: 90C59 62P20 PDF BibTeX XML Cite \textit{E. N. Goncharov}, Diskretn. Anal. Issled. Oper. 21, No. 3, 11--24 (2014; Zbl 1324.90194) Full Text: MNR OpenURL
Gomes, Helton Cristiano; de Assis das Neves, Francisco; Souza, Marcone Jamilson Freitas Multi-objective metaheuristic algorithms for the resource-constrained project scheduling problem with precedence relations. (English) Zbl 1307.90081 Comput. Oper. Res. 44, 92-104 (2014). MSC: 90B50 90C59 90C29 PDF BibTeX XML Cite \textit{H. C. Gomes} et al., Comput. Oper. Res. 44, 92--104 (2014; Zbl 1307.90081) Full Text: DOI Link OpenURL
Atli, Omer; Kahraman, Cengiz Resource-constrained project scheduling problem with multiple execution modes and fuzzy/crisp activity durations. (English) Zbl 1305.90173 J. Intell. Fuzzy Syst. 26, No. 4, 2001-2020 (2014). MSC: 90B35 PDF BibTeX XML Cite \textit{O. Atli} and \textit{C. Kahraman}, J. Intell. Fuzzy Syst. 26, No. 4, 2001--2020 (2014; Zbl 1305.90173) Full Text: DOI OpenURL
Wang, Ling; Zheng, Huanyu; Zheng, Xiaolong Surveys on resource-constrained project scheduling under uncertainty. (Chinese. English summary) Zbl 1313.90093 Control Decis. 29, No. 4, 577-584 (2014). MSC: 90B35 90-02 PDF BibTeX XML Cite \textit{L. Wang} et al., Control Decis. 29, No. 4, 577--584 (2014; Zbl 1313.90093) Full Text: DOI OpenURL
Haouari, Mohamed; Kooli, Anis; Néron, Emmanuel; Carlier, Jacques A preemptive bound for the resource constrained project scheduling problem. (English) Zbl 1297.90046 J. Sched. 17, No. 3, 237-248 (2014). MSC: 90B35 90C35 90C05 PDF BibTeX XML Cite \textit{M. Haouari} et al., J. Sched. 17, No. 3, 237--248 (2014; Zbl 1297.90046) Full Text: DOI OpenURL
Ranjbar, Mohammad; Hosseinabadi, Saeed; Abasian, Foroogh Minimizing total weighted late work in the resource-constrained project scheduling problem. (English) Zbl 1427.90157 Appl. Math. Modelling 37, No. 23, 9776-9785 (2013). MSC: 90B35 PDF BibTeX XML Cite \textit{M. Ranjbar} et al., Appl. Math. Modelling 37, No. 23, 9776--9785 (2013; Zbl 1427.90157) Full Text: DOI OpenURL
Artigues, Christian; Brucker, Peter; Knust, Sigrid; Koné, Oumar; Lopez, Pierre; Mongeau, Marcel A note on “Event-based MILP models for resource-constrained project scheduling problems”. (English) Zbl 1349.90311 Comput. Oper. Res. 40, No. 4, 1060-1063 (2013). MSC: 90B35 90C11 PDF BibTeX XML Cite \textit{C. Artigues} et al., Comput. Oper. Res. 40, No. 4, 1060--1063 (2013; Zbl 1349.90311) Full Text: DOI OpenURL
Jia, Qiong; Seo, Yoonho Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation. (English) Zbl 1348.90400 Comput. Oper. Res. 40, No. 8, 2037-2050 (2013). MSC: 90B80 90B35 90C59 PDF BibTeX XML Cite \textit{Q. Jia} and \textit{Y. Seo}, Comput. Oper. Res. 40, No. 8, 2037--2050 (2013; Zbl 1348.90400) Full Text: DOI OpenURL
Klimek, Marcin; Łebkowski, Piotr A two-phase algorithm for a resource constrained project scheduling problem with discounted cash flows. (English) Zbl 1351.90097 Decis. Mak. Manuf. Serv. 7, No. 1-2, 51-68 (2013). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{M. Klimek} and \textit{P. Łebkowski}, Decis. Mak. Manuf. Serv. 7, No. 1--2, 51--68 (2013; Zbl 1351.90097) Full Text: DOI OpenURL
Zamani, Reza A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem. (English) Zbl 1317.90339 Eur. J. Oper. Res. 229, No. 2, 552-559 (2013). MSC: 90C59 90B35 PDF BibTeX XML Cite \textit{R. Zamani}, Eur. J. Oper. Res. 229, No. 2, 552--559 (2013; Zbl 1317.90339) Full Text: DOI OpenURL
Xu, Jiuping; Zhang, Zhe A fuzzy random resource-constrained scheduling model with multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project. (English) Zbl 1280.90082 J. Sched. 15, No. 2, 253-272 (2012). MSC: 90B80 90B35 90C70 PDF BibTeX XML Cite \textit{J. Xu} and \textit{Z. Zhang}, J. Sched. 15, No. 2, 253--272 (2012; Zbl 1280.90082) Full Text: DOI OpenURL
Khalilzadeh, Mohammad; Kianfar, Fereydoon; Chaleshtari, Ali Shirzadeh; Shadrokh, Shahram; Ranjbar, Mohammad A modified PSO algorithm for minimizing the total costs of resources in MRCPSP. (English) Zbl 1264.90092 Math. Probl. Eng. 2012, Article ID 365697, 18 p. (2012). MSC: 90B35 90C59 90C11 PDF BibTeX XML Cite \textit{M. Khalilzadeh} et al., Math. Probl. Eng. 2012, Article ID 365697, 18 p. (2012; Zbl 1264.90092) Full Text: DOI OpenURL
Haouari, Mohamed; Kooli, Anis; Néron, Emmanuel Enhanced energetic reasoning-based lower bounds for the resource constrained project scheduling problem. (English) Zbl 1251.90152 Comput. Oper. Res. 39, No. 5, 1187-1194 (2012). MSC: 90B35 PDF BibTeX XML Cite \textit{M. Haouari} et al., Comput. Oper. Res. 39, No. 5, 1187--1194 (2012; Zbl 1251.90152) Full Text: DOI OpenURL
Fang, Chen; Wang, Ling An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem. (English) Zbl 1251.90140 Comput. Oper. Res. 39, No. 5, 890-901 (2012). MSC: 90B35 90B50 PDF BibTeX XML Cite \textit{C. Fang} and \textit{L. Wang}, Comput. Oper. Res. 39, No. 5, 890--901 (2012; Zbl 1251.90140) Full Text: DOI OpenURL
Zamani, Reza A polarized adaptive schedule generation scheme for the resource-constrained project scheduling problem. (English) Zbl 1241.90060 RAIRO, Oper. Res. 46, No. 1, 23-39 (2012). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{R. Zamani}, RAIRO, Oper. Res. 46, No. 1, 23--39 (2012; Zbl 1241.90060) Full Text: DOI EuDML Link OpenURL
Klimek, M.; Lebkowski, P. Resource allocation for robust project scheduling. (English) Zbl 1291.90097 Bull. Pol. Acad. Sci., Tech. Sci. 59, No. 1, 51-55 (2011). MSC: 90B35 PDF BibTeX XML Cite \textit{M. Klimek} and \textit{P. Lebkowski}, Bull. Pol. Acad. Sci., Tech. Sci. 59, No. 1, 51--55 (2011; Zbl 1291.90097) Full Text: DOI Link OpenURL
Wang, Ling; Fang, Chen An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem. (English) Zbl 1242.90082 Inf. Sci. 181, No. 20, 4804-4822 (2011). MSC: 90B35 PDF BibTeX XML Cite \textit{L. Wang} and \textit{C. Fang}, Inf. Sci. 181, No. 20, 4804--4822 (2011; Zbl 1242.90082) Full Text: DOI OpenURL
Ballestín, Francisco; Barrios, Agustín; Valls, Vicente An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags. (English) Zbl 1230.90085 J. Sched. 14, No. 4, 391-406 (2011). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{F. Ballestín} et al., J. Sched. 14, No. 4, 391--406 (2011; Zbl 1230.90085) Full Text: DOI OpenURL
Schutt, Andreas; Feydy, Thibaut; Stuckey, Peter J.; Wallace, Mark G. Explaining the cumulative propagator. (English) Zbl 1226.68099 Constraints 16, No. 3, 250-282 (2011). MSC: 68T20 90B35 PDF BibTeX XML Cite \textit{A. Schutt} et al., Constraints 16, No. 3, 250--282 (2011; Zbl 1226.68099) Full Text: DOI OpenURL
Bartels, Jan-Hendrik; Gather, Thorsten; Zimmermann, Jürgen Dismantling of nuclear power plants at optimal NPV. (English) Zbl 1225.90051 Ann. Oper. Res. 186, 407-427 (2011). MSC: 90B35 PDF BibTeX XML Cite \textit{J.-H. Bartels} et al., Ann. Oper. Res. 186, 407--427 (2011; Zbl 1225.90051) Full Text: DOI OpenURL
Bruni, M. E.; Beraldi, P.; Guerriero, F.; Pinto, E. A heuristic approach for resource constrained project scheduling with uncertain activity durations. (English) Zbl 1208.90055 Comput. Oper. Res. 38, No. 9, 1305-1318 (2011). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{M. E. Bruni} et al., Comput. Oper. Res. 38, No. 9, 1305--1318 (2011; Zbl 1208.90055) Full Text: DOI OpenURL
Ballestín, Francisco; Blanco, Rosa Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems. (English) Zbl 1231.90173 Comput. Oper. Res. 38, No. 1, 51-62 (2011). MSC: 90B35 90C59 90C29 PDF BibTeX XML Cite \textit{F. Ballestín} and \textit{R. Blanco}, Comput. Oper. Res. 38, No. 1, 51--62 (2011; Zbl 1231.90173) Full Text: DOI OpenURL
Agarwal, Anurag; Colak, Selcuk; Erenguc, Selcuk A neurogenetic approach for the resource-constrained project scheduling problem. (English) Zbl 1231.90170 Comput. Oper. Res. 38, No. 1, 44-50 (2011). MSC: 90B35 90C59 68T05 PDF BibTeX XML Cite \textit{A. Agarwal} et al., Comput. Oper. Res. 38, No. 1, 44--50 (2011; Zbl 1231.90170) Full Text: DOI OpenURL
Barrios, Agustín; Ballestín, Francisco; Valls, Vicente A double genetic algorithm for the MRCPSP/max. (English) Zbl 1231.90175 Comput. Oper. Res. 38, No. 1, 33-43 (2011). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{A. Barrios} et al., Comput. Oper. Res. 38, No. 1, 33--43 (2011; Zbl 1231.90175) Full Text: DOI OpenURL
Koné, Oumar; Artigues, Christian; Lopez, Pierre; Mongeau, Marcel Event-based MILP models for resource-constrained project scheduling problems. (English) Zbl 1231.90202 Comput. Oper. Res. 38, No. 1, 3-13 (2011). MSC: 90B35 90C11 PDF BibTeX XML Cite \textit{O. Koné} et al., Comput. Oper. Res. 38, No. 1, 3--13 (2011; Zbl 1231.90202) Full Text: DOI OpenURL
Kooli, Anis; Haouari, Mohamed; Hidri, Lotfi; Néron, Emmanuel IP-based energetic reasoning for the resource constrained project scheduling problem. (English) Zbl 1237.90092 Haouari, M. (ed.) et al., ISCO 2010. International symposium on combinatorial optimization. Papers based on the presentations at the symposium, Hammamet, Tunesia, March 24–26, 2010. Amsterdam: Elsevier. Electronic Notes in Discrete Mathematics 36, 359-366 (2010). MSC: 90B35 90C10 90C27 PDF BibTeX XML Cite \textit{A. Kooli} et al., Electron. Notes Discrete Math. 36, 359--366 (2010; Zbl 1237.90092) Full Text: DOI OpenURL
Fang, Chen; Wang, Ling A survey on resource-constrained project scheduling. (Chinese. English summary) Zbl 1240.90144 Control Decis. 25, No. 5, 641-650, 656 (2010). MSC: 90B35 90B36 68M20 PDF BibTeX XML Cite \textit{C. Fang} and \textit{L. Wang}, Control Decis. 25, No. 5, 641--650, 656 (2010; Zbl 1240.90144) OpenURL
Kuster, Jürgen; Jannach, Dietmar; Friedrich, Gerhard Applying local rescheduling in response to schedule disruptions. (English) Zbl 1202.90136 Ann. Oper. Res. 180, 265-282 (2010). MSC: 90B35 PDF BibTeX XML Cite \textit{J. Kuster} et al., Ann. Oper. Res. 180, 265--282 (2010; Zbl 1202.90136) Full Text: DOI OpenURL
Najid, Najib M.; Arroub, Marouane An efficient algorithm for the multi-mode resource constrained project scheduling problem with resource flexibility. (English) Zbl 1198.90201 Int. J. Math. Oper. Res. 2, No. 6, 748-761 (2010). MSC: 90B35 90B70 90C59 PDF BibTeX XML Cite \textit{N. M. Najid} and \textit{M. Arroub}, Int. J. Math. Oper. Res. 2, No. 6, 748--761 (2010; Zbl 1198.90201) Full Text: DOI OpenURL
Vanhoucke, Mario A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows. (English) Zbl 1197.90235 Int. J. Prod. Res. 48, No. 7, 1983-2001 (2010). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{M. Vanhoucke}, Int. J. Prod. Res. 48, No. 7, 1983--2001 (2010; Zbl 1197.90235) Full Text: DOI HAL OpenURL
Knust, Sigrid Scheduling non-professional table-tennis leagues. (English) Zbl 1177.90167 Eur. J. Oper. Res. 200, No. 2, 358-367 (2010). MSC: 90B35 90C05 PDF BibTeX XML Cite \textit{S. Knust}, Eur. J. Oper. Res. 200, No. 2, 358--367 (2010; Zbl 1177.90167) Full Text: DOI OpenURL
Wu, Yu; Zhuang, Xin-Cun; Song, Guo-Hui; Xu, Xiao-Dong; Li, Cong-Xin Solving resource-constrained multiple project scheduling problem using timed colored Petri nets. (English) Zbl 1202.90147 J. Shanghai Jiaotong Univ., Sci. 14, No. 6, 713-719 (2009). MSC: 90B35 90C35 68Q85 PDF BibTeX XML Cite \textit{Y. Wu} et al., J. Shanghai Jiaotong Univ., Sci. 14, No. 6, 713--719 (2009; Zbl 1202.90147) Full Text: DOI OpenURL
Klimek, Marcin; Łebkowski, Piotr Robust buffer allocation for scheduling of a project with predefined milestones. (English) Zbl 1202.90135 Decis. Mak. Manuf. Serv. 3, No. 1-2, 49-72 (2009). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{M. Klimek} and \textit{P. Łebkowski}, Decis. Mak. Manuf. Serv. 3, No. 1--2, 49--72 (2009; Zbl 1202.90135) Full Text: DOI OpenURL
Li, Haitao; Womer, Keith Scheduling projects with multi-skilled personnel by a hybrid MILP/CP Benders decomposition algorithm. (English) Zbl 1185.90112 J. Sched. 12, No. 3, 281-298 (2009). MSC: 90B36 90B80 90C05 90C10 90C11 PDF BibTeX XML Cite \textit{H. Li} and \textit{K. Womer}, J. Sched. 12, No. 3, 281--298 (2009; Zbl 1185.90112) Full Text: DOI OpenURL
Moumene, Khaled; Ferland, Jacques A. Activity list representation for a generalization of the resource-constrained project scheduling problem. (English) Zbl 1176.90234 Eur. J. Oper. Res. 199, No. 1, 46-54 (2009). MSC: 90B35 PDF BibTeX XML Cite \textit{K. Moumene} and \textit{J. A. Ferland}, Eur. J. Oper. Res. 199, No. 1, 46--54 (2009; Zbl 1176.90234) Full Text: DOI OpenURL
Artigues, Christian; Briand, Cyril The resource-constrained activity insertion problem with minimum and maximum time lags. (English) Zbl 1176.90192 J. Sched. 12, No. 5, 447-460 (2009). MSC: 90B35 PDF BibTeX XML Cite \textit{C. Artigues} and \textit{C. Briand}, J. Sched. 12, No. 5, 447--460 (2009; Zbl 1176.90192) Full Text: DOI HAL OpenURL
Ballestín, Francisco; Valls, Vicente; Quintanilla, Sacramento Scheduling projects with limited number of preemptions. (English) Zbl 1162.90442 Comput. Oper. Res. 36, No. 11, 2913-2925 (2009). MSC: 90B35 PDF BibTeX XML Cite \textit{F. Ballestín} et al., Comput. Oper. Res. 36, No. 11, 2913--2925 (2009; Zbl 1162.90442) Full Text: DOI OpenURL
Bomsdorf, Felix; Derigs, Ulrich A model, heuristic procedure and decision support system for solving the movie shoot scheduling problem. (English) Zbl 1193.90094 OR Spectrum 30, No. 4, 751-772 (2008). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{F. Bomsdorf} and \textit{U. Derigs}, OR Spectrum 30, No. 4, 751--772 (2008; Zbl 1193.90094) Full Text: DOI OpenURL
Yu, Ying A hybrid genetic algorithm for multi-mode resource-constrained project scheduling problems. (Chinese. English summary) Zbl 1199.91126 J. Southeast Univ., Nat. Sci. 38, No. 4, 736-740 (2008). MSC: 91B32 90B36 90C59 68W25 PDF BibTeX XML Cite \textit{Y. Yu}, J. Southeast Univ., Nat. Sci. 38, No. 4, 736--740 (2008; Zbl 1199.91126) OpenURL
Ballestín, Francisco; Trautmann, Norbert An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem. (English) Zbl 1154.90353 Int. J. Prod. Res. 46, No. 22, 6231-6249 (2008). MSC: 90B30 PDF BibTeX XML Cite \textit{F. Ballestín} and \textit{N. Trautmann}, Int. J. Prod. Res. 46, No. 22, 6231--6249 (2008; Zbl 1154.90353) Full Text: DOI OpenURL
Damay, Jean; Quilliot, Alain; Sanlaville, Eric Polyhedral reformulation of a scheduling problem and related theoretical results. (English) Zbl 1152.90437 RAIRO, Oper. Res. 42, No. 3, 325-359 (2008). MSC: 90B35 90C05 PDF BibTeX XML Cite \textit{J. Damay} et al., RAIRO, Oper. Res. 42, No. 3, 325--359 (2008; Zbl 1152.90437) Full Text: DOI EuDML Link OpenURL
Moumene, Khaled; Ferland, Jacques A. New representation to reduce the search space for the resource-constrained project scheduling problem. (English) Zbl 1154.90476 RAIRO, Oper. Res. 42, No. 2, 215-228 (2008). MSC: 90B35 PDF BibTeX XML Cite \textit{K. Moumene} and \textit{J. A. Ferland}, RAIRO, Oper. Res. 42, No. 2, 215--228 (2008; Zbl 1154.90476) Full Text: DOI EuDML OpenURL
Ballestín, Francisco; Valls, Vicente; Quintanilla, Sacramento Pre-emption in resource-constrained project scheduling. (English) Zbl 1146.90403 Eur. J. Oper. Res. 189, No. 3, 1136-1152 (2008). MSC: 90B35 PDF BibTeX XML Cite \textit{F. Ballestín} et al., Eur. J. Oper. Res. 189, No. 3, 1136--1152 (2008; Zbl 1146.90403) Full Text: DOI OpenURL
Xu, Ningxiong; McKee, Sally A.; Nozick, Linda K.; Ufomata, Ruke Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem. (English) Zbl 1135.90017 Comput. Oper. Res. 35, No. 10, 3284-3297 (2008). Reviewer: Frank Werner (Magdeburg) MSC: 90B35 90C59 90B10 PDF BibTeX XML Cite \textit{N. Xu} et al., Comput. Oper. Res. 35, No. 10, 3284--3297 (2008; Zbl 1135.90017) Full Text: DOI OpenURL
Mika, Marek; Waligóra, Grzegorz; Węglarz, Jan Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times. (English) Zbl 1137.90508 Eur. J. Oper. Res. 187, No. 3, 1238-1250 (2008). MSC: 90B35 90C59 PDF BibTeX XML Cite \textit{M. Mika} et al., Eur. J. Oper. Res. 187, No. 3, 1238--1250 (2008; Zbl 1137.90508) Full Text: DOI OpenURL