Song, Jing-Sheng; Xiao, Li; Zhang, Hanqin; Zipkin, Paul Smart policies for multisource inventory systems and general tandem queues with order tracking and expediting. (English) Zbl 1497.90023 Oper. Res. 70, No. 4, 2421-2438 (2022). MSC: 90B05 90B22 PDF BibTeX XML Cite \textit{J.-S. Song} et al., Oper. Res. 70, No. 4, 2421--2438 (2022; Zbl 1497.90023) Full Text: DOI
Hellemans, Tim; Boute, Robert N.; van Houdt, Benny Analysis of lead time correlation under a base-stock policy. (English) Zbl 1430.90019 Eur. J. Oper. Res. 276, No. 2, 519-535 (2019). MSC: 90B05 60J20 PDF BibTeX XML Cite \textit{T. Hellemans} et al., Eur. J. Oper. Res. 276, No. 2, 519--535 (2019; Zbl 1430.90019) Full Text: DOI
Hekimoğlu, Mustafa; Van der Laan, Ervin; Dekker, Rommert Markov-modulated analysis of a spare parts system with random lead times and disruption risks. (English) Zbl 1388.90011 Eur. J. Oper. Res. 269, No. 3, 909-922 (2018). MSC: 90B05 90B06 PDF BibTeX XML Cite \textit{M. Hekimoğlu} et al., Eur. J. Oper. Res. 269, No. 3, 909--922 (2018; Zbl 1388.90011) Full Text: DOI
Karaman, Abdullah S. Approximate evaluation of continuous review \((R,Q)\) policies in two-echelon inventory systems with stochastic transportation times. (English) Zbl 1438.90010 Kybernetika 53, No. 3, 461-479 (2017). MSC: 90B05 60J27 PDF BibTeX XML Cite \textit{A. S. Karaman}, Kybernetika 53, No. 3, 461--479 (2017; Zbl 1438.90010) Full Text: DOI
Singh, Gagandeep; Mougel, Leo; Beauregard, Yvan; Zhao, Yaoyao Fiona Towards optimal engineering multitasking level through stochastic modelling. (English) Zbl 1362.90146 Int. J. Oper. Res. 28, No. 2, 263-278 (2017). MSC: 90B22 PDF BibTeX XML Cite \textit{G. Singh} et al., Int. J. Oper. Res. 28, No. 2, 263--278 (2017; Zbl 1362.90146) Full Text: DOI
Laxmi, P. Vijaya; Soujanya, M. L.; Jyothsna, K. An inventory model with negative customers and service interruptions. (English) Zbl 1452.90027 Int. J. Math. Oper. Res. 9, No. 1, 1-14 (2016). MSC: 90B05 PDF BibTeX XML Cite \textit{P. V. Laxmi} et al., Int. J. Math. Oper. Res. 9, No. 1, 1--14 (2016; Zbl 1452.90027) Full Text: DOI
Jauhari, Wakhid Ahmad Integrated vendor-buyer model with defective items, inspection error and stochastic demand. (English) Zbl 1452.90019 Int. J. Math. Oper. Res. 8, No. 3, 342-359 (2016). MSC: 90B05 PDF BibTeX XML Cite \textit{W. A. Jauhari}, Int. J. Math. Oper. Res. 8, No. 3, 342--359 (2016; Zbl 1452.90019) Full Text: DOI
Reiman, Martin I.; Wan, Haohua; Wang, Qiong On the use of independent base-stock policies in assemble-to-order inventory systems with nonidentical lead times. (English) Zbl 1380.90020 Oper. Res. Lett. 44, No. 4, 436-442 (2016). MSC: 90B05 90B30 90C15 PDF BibTeX XML Cite \textit{M. I. Reiman} et al., Oper. Res. Lett. 44, No. 4, 436--442 (2016; Zbl 1380.90020) Full Text: DOI
Disney, Stephen M.; Maltz, Arnold; Wang, Xun; Warburton, Roger D. H. Inventory management for stochastic lead times with order crossovers. (English) Zbl 1346.90023 Eur. J. Oper. Res. 248, No. 2, 473-486 (2016). MSC: 90B05 90C15 PDF BibTeX XML Cite \textit{S. M. Disney} et al., Eur. J. Oper. Res. 248, No. 2, 473--486 (2016; Zbl 1346.90023) Full Text: DOI Link
Muthuraman, Kumar; Seshadri, Sridhar; Wu, Qi Inventory management with stochastic lead times. (English) Zbl 1312.93116 Math. Oper. Res. 40, No. 2, 302-327 (2015). MSC: 93E20 90B05 PDF BibTeX XML Cite \textit{K. Muthuraman} et al., Math. Oper. Res. 40, No. 2, 302--327 (2015; Zbl 1312.93116) Full Text: DOI
Jauhari, Wakhid Ahmad Integrated inventory model for single-vendor single-buyer with imperfect production process. (English) Zbl 1362.90031 Int. J. Oper. Res. 20, No. 3, 283-300 (2014). MSC: 90B05 PDF BibTeX XML Cite \textit{W. A. Jauhari}, Int. J. Oper. Res. 20, No. 3, 283--300 (2014; Zbl 1362.90031) Full Text: DOI
Rajkumar, M.; Alexander, C.; Arivarignan, G. A Markovian inventory system with retrial and impatient customers. (English) Zbl 1328.90010 Int. J. Oper. Res. 21, No. 2, 155-171 (2014). MSC: 90B05 90B22 PDF BibTeX XML Cite \textit{M. Rajkumar} et al., Int. J. Oper. Res. 21, No. 2, 155--171 (2014; Zbl 1328.90010) Full Text: DOI
Akan, Mustafa; Ata, Barış; Olsen, Tava Congestion-based lead-time quotation for heterogenous customers with convex-concave delay costs: optimality of a cost-balancing policy based on convex hull functions. (English) Zbl 1263.90019 Oper. Res. 60, No. 6, 1505-1519 (2012). MSC: 90B22 PDF BibTeX XML Cite \textit{M. Akan} et al., Oper. Res. 60, No. 6, 1505--1519 (2012; Zbl 1263.90019) Full Text: DOI Link
Hnaien, Faicel; Dolgui, Alexandre; Louly, Mohamed Aly O. Key performance indicators for supply planning of multilevel serial systems with stochastic lead times. (English) Zbl 1302.90021 Control Cybern. 39, No. 1, 133-148 (2010). MSC: 90B06 90B36 PDF BibTeX XML Cite \textit{F. Hnaien} et al., Control Cybern. 39, No. 1, 133--148 (2010; Zbl 1302.90021) Full Text: Link
Muharremoglu, Alp; Yang, Nan Inventory management with an exogenous supply process. (English) Zbl 1233.90035 Oper. Res. 58, No. 1, 111-129 (2010). MSC: 90B05 PDF BibTeX XML Cite \textit{A. Muharremoglu} and \textit{N. Yang}, Oper. Res. 58, No. 1, 111--129 (2010; Zbl 1233.90035) Full Text: DOI Link
Sheopuri, Anshul; Janakiraman, Ganesh; Seshadri, Sridhar New policies for the stochastic inventory control problem with two supply sources. (English) Zbl 1231.90061 Oper. Res. 58, No. 3, 734-745 (2010). MSC: 90B05 93E20 PDF BibTeX XML Cite \textit{A. Sheopuri} et al., Oper. Res. 58, No. 3, 734--745 (2010; Zbl 1231.90061) Full Text: DOI
Rong, Mahendra; Maiti, Manoranjan A two-warehouse inventory model with stochastic demand, controllable lead time and fuzzy present value: a technique to deal with arbitrary fuzzy number. (English) Zbl 1201.90017 Int. J. Oper. Res. 8, No. 2, 208-229 (2010). MSC: 90B05 PDF BibTeX XML Cite \textit{M. Rong} and \textit{M. Maiti}, Int. J. Oper. Res. 8, No. 2, 208--229 (2010; Zbl 1201.90017) Full Text: DOI
Hnaien, Faicel; Delorme, Xavier; Dolgui, Alexandre Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times. (English) Zbl 1188.90009 Comput. Oper. Res. 37, No. 11, 1835-1843 (2010). MSC: 90B05 90C29 PDF BibTeX XML Cite \textit{F. Hnaien} et al., Comput. Oper. Res. 37, No. 11, 1835--1843 (2010; Zbl 1188.90009) Full Text: DOI
Song, Jing-Sheng; Zipkin, Paul Inventories with multiple supply sources and networks of queues with overflow bypasses. (English) Zbl 1232.90093 Manage. Sci. 55, No. 3, 362-372 (2009). MSC: 90B05 90B22 PDF BibTeX XML Cite \textit{J.-S. Song} and \textit{P. Zipkin}, Manage. Sci. 55, No. 3, 362--372 (2009; Zbl 1232.90093) Full Text: DOI Link
Sajadieh, Mohsen S.; Eshghi, Kourosh Sole versus dual sourcing under order dependent lead times and prices. (English) Zbl 1176.90318 Comput. Oper. Res. 36, No. 12, 3272-3280 (2009). MSC: 90B50 90C15 90B05 PDF BibTeX XML Cite \textit{M. S. Sajadieh} and \textit{K. Eshghi}, Comput. Oper. Res. 36, No. 12, 3272--3280 (2009; Zbl 1176.90318) Full Text: DOI
Karaman, Abdullah; Altiok, Tayfur Approximate analysis and optimization of batch ordering policies in capacitated supply chains. (English) Zbl 1152.90363 Eur. J. Oper. Res. 193, No. 1, 222-237 (2009). MSC: 90B15 90B30 PDF BibTeX XML Cite \textit{A. Karaman} and \textit{T. Altiok}, Eur. J. Oper. Res. 193, No. 1, 222--237 (2009; Zbl 1152.90363) Full Text: DOI
Xu, Ningxiong Optimal policy for a two-facility inventory problem with storage constraints and two freight modes. (English) Zbl 1179.90026 Eur. J. Oper. Res. 194, No. 1, 78-84 (2009). MSC: 90B05 90C15 90C39 PDF BibTeX XML Cite \textit{N. Xu}, Eur. J. Oper. Res. 194, No. 1, 78--84 (2009; Zbl 1179.90026) Full Text: DOI
Huang, Kai; Simge, Küçükyavuz On stochastic lot-sizing problems with random lead times. (English) Zbl 1152.90546 Oper. Res. Lett. 36, No. 3, 303-308 (2008). MSC: 90C15 PDF BibTeX XML Cite \textit{K. Huang} and \textit{K. Simge}, Oper. Res. Lett. 36, No. 3, 303--308 (2008; Zbl 1152.90546) Full Text: DOI
Hnaien, Faicel; Dolgui, Alexandre; Marian, Hélène; Louly, Mohamed-Aly Planning order release dates for multilevel linear supply chain with random lead times. (English) Zbl 1179.93033 Syst. Sci. 33, No. 1, 19-25 (2007). MSC: 93A30 90C90 93E03 PDF BibTeX XML Cite \textit{F. Hnaien} et al., Syst. Sci. 33, No. 1, 19--25 (2007; Zbl 1179.93033)
Kim, Jeon G.; Chatfield, Dean; Harrison, Terry P.; Hayya, Jack C. Quantifying the bullwhip effect in a supply chain with stochastic lead time. (English) Zbl 1125.90363 Eur. J. Oper. Res. 173, No. 2, 617-636 (2006). MSC: 90B50 90B22 PDF BibTeX XML Cite \textit{J. G. Kim} et al., Eur. J. Oper. Res. 173, No. 2, 617--636 (2006; Zbl 1125.90363) Full Text: DOI
Kim, Jeon G.; Sun, Daewon; He, Xin James; Hayya, Jack C. The \((s,Q)\) inventory model with Erlang lead time and deterministic demand. (English) Zbl 1075.90004 Nav. Res. Logist. 51, No. 6, 906-923 (2004). MSC: 90B05 90C15 PDF BibTeX XML Cite \textit{J. G. Kim} et al., Nav. Res. Logist. 51, No. 6, 906--923 (2004; Zbl 1075.90004) Full Text: DOI
Gallego, Guillermo; Özer, Özalp Integrating replenishment decisions with advance demand information. (English) Zbl 1232.90047 Manage. Sci. 47, No. 10, 1344-1360 (2001). MSC: 90B05 PDF BibTeX XML Cite \textit{G. Gallego} and \textit{Ö. Özer}, Manage. Sci. 47, No. 10, 1344--1360 (2001; Zbl 1232.90047) Full Text: DOI Link
Anbazhagan, N.; Arivarignan, G. Analysis of two commodity Markovian inventory system with lead time. (English) Zbl 0978.60086 Korean J. Comput. Appl. Math. 8, No. 2, 427-438 (2001). MSC: 60J27 90B05 PDF BibTeX XML Cite \textit{N. Anbazhagan} and \textit{G. Arivarignan}, Korean J. Comput. Appl. Math. 8, No. 2, 427--438 (2001; Zbl 0978.60086)
Fong, Duncan K. H.; Gempesaw, Virginia M.; Ord, J. Keith Analysis of a dual sourcing inventory model with normal unit demand and Erlang mixture lead times. (English) Zbl 0979.90008 Eur. J. Oper. Res. 120, No. 1, 97-107 (2000). MSC: 90B05 91B70 PDF BibTeX XML Cite \textit{D. K. H. Fong} et al., Eur. J. Oper. Res. 120, No. 1, 97--107 (2000; Zbl 0979.90008) Full Text: DOI
Homem-De-Mello, Tito; Shapiro, Alexander; Spearman, Mark L. Finding optimal material release times using simulation-based optimization. (English) Zbl 1231.91275 Manage. Sci. 45, No. 1, 86-102 (1999). MSC: 91B38 91B42 90B30 PDF BibTeX XML Cite \textit{T. Homem-De-Mello} et al., Manage. Sci. 45, No. 1, 86--102 (1999; Zbl 1231.91275) Full Text: DOI Link
Dohi, Tadashi; Shibuya, Takeshi; Osaki, Shunji Models for 1-out-of \(Q\) systems with stochastic lead times and expedited ordering options for spares inventory. (English) Zbl 0922.90050 Eur. J. Oper. Res. 103, No. 1, 255-272 (1997). MSC: 90B05 PDF BibTeX XML Cite \textit{T. Dohi} et al., Eur. J. Oper. Res. 103, No. 1, 255--272 (1997; Zbl 0922.90050) Full Text: DOI
Charnes, John M.; Marmorstein, Howard; Zinn, Walter Safety stock determination with serially correlated demand in a periodic- review inventory system. (English) Zbl 0832.90027 J. Oper. Res. Soc. 46, No. 8, 1006-1013 (1995). MSC: 90B05 PDF BibTeX XML Cite \textit{J. M. Charnes} et al., J. Oper. Res. Soc. 46, No. 8, 1006--1013 (1995; Zbl 0832.90027) Full Text: DOI
Chiang, Chi; Benton, W. C. Sole sourcing versus dual sourcing under stochastic demands and lead times. (English) Zbl 0809.90038 Nav. Res. Logist. 41, No. 5, 609-624 (1994). MSC: 90B05 PDF BibTeX XML Cite \textit{C. Chiang} and \textit{W. C. Benton}, Nav. Res. Logist. 41, No. 5, 609--624 (1994; Zbl 0809.90038) Full Text: DOI
Song, Jing-Sheng Understanding the lead-time effects in stochastic inventory systems with discounted costs. (English) Zbl 0813.90036 Oper. Res. Lett. 15, No. 2, 85-93 (1994). MSC: 90B05 PDF BibTeX XML Cite \textit{J.-S. Song}, Oper. Res. Lett. 15, No. 2, 85--93 (1994; Zbl 0813.90036) Full Text: DOI
Chitgopekar, S. S.; Subba Rao, S. A modification to the holding cost expression in the case of constant lead times and stochastic demands. (English) Zbl 0772.90038 J. Inf. Optim. Sci. 13, No. 3, 363-374 (1992). MSC: 90B05 PDF BibTeX XML Cite \textit{S. S. Chitgopekar} and \textit{S. Subba Rao}, J. Inf. Optim. Sci. 13, No. 3, 363--374 (1992; Zbl 0772.90038) Full Text: DOI
Friedman, Moshe F. The effect of stochastic supply times on optimal policies in inventory control. (English) Zbl 0696.90020 Progress in inventory research, Sel. Pap. 4th Int. Symp. Inventories, Budapest/Hung. 1986, 329-333 (1989). MSC: 90B05 PDF BibTeX XML
Anderson, E. J. A note on the dynamic lot-size model with uncertainty in demand and supply processes. (English) Zbl 0669.90038 Manage. Sci. 35, No. 5, 635-640 (1989). MSC: 90B05 PDF BibTeX XML Cite \textit{E. J. Anderson}, Manage. Sci. 35, No. 5, 635--640 (1989; Zbl 0669.90038) Full Text: DOI
Sung, Chang Sup; Yang, Seong Min Continuous review (s,S) inventory model with limited backlogging levels and stochastic lead times. (English) Zbl 0651.90018 J. Oper. Res. Soc. Japan 31, No. 2, 252-264 (1988). MSC: 90B05 PDF BibTeX XML Cite \textit{C. S. Sung} and \textit{S. M. Yang}, J. Oper. Res. Soc. Japan 31, No. 2, 252--264 (1988; Zbl 0651.90018) Full Text: DOI
Kässmann, G.; Kühn, M.; Schneeweiß, Ch. Spicher’s SB-algorithm revisited - feedback versus feedforward control for inventories. (English) Zbl 0601.90036 OR Spektrum 8, 89-98 (1986). MSC: 90B05 PDF BibTeX XML Cite \textit{G. Kässmann} et al., OR Spektrum 8, 89--98 (1986; Zbl 0601.90036) Full Text: DOI
Friedman, Moshe F. Balancing stocks and backlogs with stochastic lead times. A special case. (English) Zbl 0606.90037 Comput. Oper. Res. 11, 233-239 (1984). MSC: 90B05 PDF BibTeX XML Cite \textit{M. F. Friedman}, Comput. Oper. Res. 11, 233--239 (1984; Zbl 0606.90037) Full Text: DOI
Sphicas, Georghios P.; Nasri, Farrokh An inventory model with finite-range stochastic lead times. (English) Zbl 0566.90027 Nav. Res. Logist. Q. 31, 609-616 (1984). Reviewer: B.W.Conolly MSC: 90B05 PDF BibTeX XML Cite \textit{G. P. Sphicas} and \textit{F. Nasri}, Nav. Res. Logist. Q. 31, 609--616 (1984; Zbl 0566.90027) Full Text: DOI
Venezia, Itzhak The covariance structure of sequential forecasts obtained by regression analysis. (English) Zbl 0479.62070 J. Stat. Plann. Inference 5, 121-132 (1981). MSC: 62M20 62M10 62G99 PDF BibTeX XML Cite \textit{I. Venezia}, J. Stat. Plann. Inference 5, 121--132 (1981; Zbl 0479.62070) Full Text: DOI
Tijms, H. C.; Groenevelt, H. Approximations for (s,S) inventory systems with stochastic lead times and a service level constraint. (English) Zbl 0468.90017 Math. Cent., Amst., Afd. Math. Beslisk. BW 152/81, 18 p. (1981). MSC: 90B05 PDF BibTeX XML
Sculli, D.; Wu, S. Y. Stock control with two suppliers and normal lead times. (English) Zbl 0464.90016 J. Oper. Res. Soc. 32, 1003-1009 (1981). MSC: 90B05 65C99 PDF BibTeX XML Cite \textit{D. Sculli} and \textit{S. Y. Wu}, J. Oper. Res. Soc. 32, 1003--1009 (1981; Zbl 0464.90016) Full Text: DOI
Wright, Gordon P. Some optimal ordering policies for inventory systems with stochastic lead times. (English) Zbl 0197.45905 Aust. J. Stat. 12, 8-12 (1970). MSC: 90B05 90C15 PDF BibTeX XML Cite \textit{G. P. Wright}, Aust. J. Stat. 12, 8--12 (1970; Zbl 0197.45905) Full Text: DOI