×
Compute Distance To:
Author ID: li.rong-kwei Recent zbMATH articles by "Li, Rong-Kwei"
Published as: Li, R. K.; Li, R.-K.; Li, Rong-Kwei
Documents Indexed: 14 Publications since 1995
Co-Authors: 7 Co-Authors with 6 Joint Publications
21 Co-Co-Authors

Publications by Year

Citations contained in zbMATH Open

9 Publications have been cited 37 times in 35 Documents Cited by Year
Process capability analysis for an entire product. Zbl 1037.90514
Chen, K. S.; Huang, M. L.; Li, R. K.
13
2001
Integrating order release control with due-date assignment rules. Zbl 0943.90512
Tsai, C.-H.; Chang, G.-T.; Li, R.-K.
8
1997
The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks. Zbl 0949.90515
Huang, C.-L.; Huang, Y.-H.; Chang, T.-Y.; Chang, S.-H.; Chung, C.-H.; Huang, D.-T.; Li, R.-K.
5
1999
Constraint time buffer determination model. Zbl 0949.90652
Tu, Y.-M.; Li, R.-K.
4
1998
Enhancement of theory of constraints replenishment using a novel generic buffer management procedure. Zbl 1176.90041
Yuan, Kuo-Jung; Chang, Sheng-Hung; Li, Rong-Kwei
2
2003
Mixing macro and micro flowtime estimation model: Wafer fab example. Zbl 0949.90562
Tseng, T.-Y.; Ho, T.-F.; Li, R.-K.
2
1999
Minimizing total earliness and tardiness for common due date single-machine scheduling with an unavailability interval. Zbl 1400.90173
Low, Chinyao; Li, Rong-Kwei; Wu, Guan-He
1
2016
Feature modification framework for feature based design systems. Zbl 0914.90145
Li, R.-K.; Lin, C.-Y.; Wu, H.-H.
1
1995
A new rescheduling method for computer based scheduling systems. Zbl 0913.90188
Wu, H.-H.; Li, R.-K.
1
1995
Minimizing total earliness and tardiness for common due date single-machine scheduling with an unavailability interval. Zbl 1400.90173
Low, Chinyao; Li, Rong-Kwei; Wu, Guan-He
1
2016
Enhancement of theory of constraints replenishment using a novel generic buffer management procedure. Zbl 1176.90041
Yuan, Kuo-Jung; Chang, Sheng-Hung; Li, Rong-Kwei
2
2003
Process capability analysis for an entire product. Zbl 1037.90514
Chen, K. S.; Huang, M. L.; Li, R. K.
13
2001
The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks. Zbl 0949.90515
Huang, C.-L.; Huang, Y.-H.; Chang, T.-Y.; Chang, S.-H.; Chung, C.-H.; Huang, D.-T.; Li, R.-K.
5
1999
Mixing macro and micro flowtime estimation model: Wafer fab example. Zbl 0949.90562
Tseng, T.-Y.; Ho, T.-F.; Li, R.-K.
2
1999
Constraint time buffer determination model. Zbl 0949.90652
Tu, Y.-M.; Li, R.-K.
4
1998
Integrating order release control with due-date assignment rules. Zbl 0943.90512
Tsai, C.-H.; Chang, G.-T.; Li, R.-K.
8
1997
Feature modification framework for feature based design systems. Zbl 0914.90145
Li, R.-K.; Lin, C.-Y.; Wu, H.-H.
1
1995
A new rescheduling method for computer based scheduling systems. Zbl 0913.90188
Wu, H.-H.; Li, R.-K.
1
1995

Citations by Year