×

zbMATH — the first resource for mathematics

Sarkar, Biswajit

Compute Distance To:
Author ID: sarkar.biswajit Recent zbMATH articles by "Sarkar, Biswajit"
Published as: Sarkar, B.; Sarkar, Biswajit
External Links: ORCID
Documents Indexed: 53 Publications since 1975

Publications by Year

Citations contained in zbMATH Open

38 Publications have been cited 503 times in 227 Documents Cited by Year
An EOQ model with delay in payments and time varying deterioration rate. Zbl 1255.90021
Sarkar, Biswajit
56
2012
A production-inventory model with probabilistic deterioration in two-echelon supply chain management. Zbl 1351.90018
Sarkar, Biswajit
52
2013
An EPQ model with inflation in an imperfect production system. Zbl 1208.90012
Sarkar, Biswajit; Moon, Ilkyeong
36
2011
An inventory model with trade-credit policy and variable deterioration for fixed lifetime products. Zbl 1326.90008
Sarkar, Biswajit; Saren, Sharmila; Cárdenas-Barrón, Leopoldo Eduardo
34
2015
An inventory model with reliability in an imperfect production process. Zbl 1239.90008
Sarkar, Biswajit
29
2012
An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production. Zbl 1245.90007
Sarkar, Biswajit
26
2012
Supply chain coordination with variable backorder, inspections, and discount policy for fixed lifetime products. Zbl 1400.90034
Sarkar, Biswajit
22
2016
An integrated inventory model with variable lead time, defective units and delay in payments. Zbl 1334.90012
Sarkar, Biswajit; Gupta, Hiranmoy; Chaudhuri, Kripasindhu; Goyal, Suresh Kumar
22
2014
Product inspection policy for an imperfect production system with inspection errors and warranty cost. Zbl 1346.90287
Sarkar, Biswajit; Saren, Sharmila
18
2016
Optimal reliability, production lot size and safety stock in an imperfect production system. Zbl 1201.90069
Sarkar, Biswajit; Sana, Shib Sankar; Chaudhuri, Kripasindhu
17
2010
A finite replenishment model with increasing demand under inflation. Zbl 1188.90016
Sarkar, Biswajit; Sana, Shib Sankar; Chaudhuri, Kripasindhu
17
2010
Integrated vendor-buyer supply chain model with Vendor’s setup cost reduction. Zbl 1334.90013
Sarkar, Biswajit; Majumder, Arunava
16
2013
Periodic review fuzzy inventory model with variable lead time and fuzzy demand. Zbl 1371.90016
Sarkar, Biswajit; Mahapatra, Amalendu Singha
15
2017
An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments. Zbl 1426.90012
Cárdenas-Barrón, Leopoldo Eduardo; Sarkar, Biswajit; Treviño-Garza, Gerardo
14
2013
Effect of unequal lot sizes, variable setup cost, and carbon emission cost in a supply chain model. Zbl 1394.90045
Sarkar, Biswajit; Saren, Sharmila; Sinha, Debjani; Hur, Sun
12
2015
An EMQ model with price and time dependent demand under the effect of reliability and inflation. Zbl 1410.90019
Sarkar, Biswajit; Mandal, Papiya; Sarkar, Sumon
12
2014
Partial trade-credit policy of retailer with exponentially deteriorating items. Zbl 1392.90007
Sarkar, Biswajit; Saren, Sharmila
11
2015
Easy and improved algorithms to joint determination of the replenishment lot size and number of shipments for an EPQ model with rework. Zbl 1390.90013
Cárdenas-Barrón, Leopoldo Eduardo; Sarkar, Biswajit; Treviño-Garza, Gerardo
11
2013
Two-echelon supply chain model with manufacturing quality improvement and setup cost reduction. Zbl 1404.90032
Sarkar, Biswajit; Majumder, Arunava; Sarkar, Mitali; Dey, Bikash Koli; Roy, Gargi
10
2017
Controllable lead time, service level constraint, and transportation discounts in a continuous review inventory model. Zbl 1353.90019
Shin, Dongmin; Guchhait, Rekha; Sarkar, Biswajit; Mittal, Mandeep
10
2016
Min-max distribution free continuous-review model with a service level constraint and variable lead time. Zbl 1364.90025
Moon, Ilkyeong; Shin, Eunjoo; Sarkar, Biswajit
9
2014
Preservation of deteriorating seasonal products with stock-dependent consumption rate and shortages. Zbl 1364.90028
Sarkar, Biswajit; Mandal, Buddhadev; Sarkar, Sumon
7
2017
Optimization of sample size and order size in an inventory model with quality inspection and return of defective items. Zbl 1411.90015
Cheikhrouhou, Naoufel; Sarkar, Biswajit; Ganguly, Baishakhi; Malik, Asif Iqbal; Batista, Rafael; Lee, Young Hae
6
2018
Fuzzy \(\phi\)-tolerance competition graphs. Zbl 1381.05059
Pramanik, Tarasankar; Samanta, Sovan; Sarkar, Biswajit; Pal, Madhumangal
6
2017
Lost sales reduction and quality improvement with variable lead time and fuzzy costs in an imperfect production system. Zbl 1405.90019
Soni, Hardik N.; Sarkar, Biswajit; Mahapatra, Amalendu Singha; Mazumder, S. K.
4
2018
Demand uncertainty and learning in fuzziness in a continuous review inventory model. Zbl 1377.68246
Soni, Hardik N.; Sarkar, Biswajit; Joshi, Manisha
4
2017
Recycling of lifetime dependent deteriorated products through different supply chains. Zbl 1414.90043
Iqbal, Muhammad Waqas; Sarkar, Biswajit
3
2019
An integrated inventory model involving discrete setup cost reduction, variable safety factor, selling price dependent demand, and investment. Zbl 1414.90037
Dey, Bikash Koli; Sarkar, Biswajit; Sarkar, Mitali; Pareek, Sarla
3
2019
Supply chain model with stochastic lead time, trade-credit financing, and transportation discounts. Zbl 1426.90048
Kim, Sung Jun; Sarkar, Biswajit
3
2017
An integrated inventory model with variable transportation cost, two-stage inspection, and defective items. Zbl 1373.90009
Sarkar, Biswajit; Shaw, Bijoy Kumar; Kim, Taebok; Sarkar, Mitali; Shin, Dongmin
3
2017
Stochastic machine breakdown and discrete delivery in an imperfect inventory-production system. Zbl 1362.90065
Taleizadeh, Ata Allah; Samimi, Hadi; Sarkar, Biswajit; Mohammadi, Babak
3
2017
A comparative study between inventory followed by shortages and shortages followed by inventory under trade-credit policy. Zbl 1392.90006
Khanra, S.; Mandal, Buddhadev; Sarkar, B.
3
2015
Integrated vendor-buyer strategies for imperfect production systems with maintenance and warranty policy. Zbl 1437.90011
Khanna, Aditi; Gautam, Prerna; Sarkar, Biswajit; Jaggi, Chandra K.
2
2020
Application of preservation technology for lifetime dependent products in an integrated production system. Zbl 1438.90094
Iqbal, Muhammad Waqas; Sarkar, Biswajit
2
2020
A multi-retailer supply chain model with backorder and variable production cost. Zbl 1405.90015
Majumder, Arunava; Jaggi, Chandra K.; Sarkar, Biswajit
2
2018
Influence of controllable lead time, premium price, and unequal shipments under environmental effects in a supply chain management. Zbl 1425.90004
Ganguly, Baishakhi; Sarkar, Biswajit; Sarkar, Mitali; Pareek, Sarla; Omair, Muhammad
1
2019
Supply chain with customer-based two-level credit policies under an imperfect quality environment. Zbl 1425.90007
Khanna, Aditi; Kishore, Aakanksha; Sarkar, Biswajit; Jaggi, Chandra K.
1
2018
Effects of variable production rate and time-dependent holding cost for complementary products in supply chain model. Zbl 1426.90108
Sarkar, Mitali; Hur, Sun; Sarkar, Biswajit
1
2017
Integrated vendor-buyer strategies for imperfect production systems with maintenance and warranty policy. Zbl 1437.90011
Khanna, Aditi; Gautam, Prerna; Sarkar, Biswajit; Jaggi, Chandra K.
2
2020
Application of preservation technology for lifetime dependent products in an integrated production system. Zbl 1438.90094
Iqbal, Muhammad Waqas; Sarkar, Biswajit
2
2020
Recycling of lifetime dependent deteriorated products through different supply chains. Zbl 1414.90043
Iqbal, Muhammad Waqas; Sarkar, Biswajit
3
2019
An integrated inventory model involving discrete setup cost reduction, variable safety factor, selling price dependent demand, and investment. Zbl 1414.90037
Dey, Bikash Koli; Sarkar, Biswajit; Sarkar, Mitali; Pareek, Sarla
3
2019
Influence of controllable lead time, premium price, and unequal shipments under environmental effects in a supply chain management. Zbl 1425.90004
Ganguly, Baishakhi; Sarkar, Biswajit; Sarkar, Mitali; Pareek, Sarla; Omair, Muhammad
1
2019
Optimization of sample size and order size in an inventory model with quality inspection and return of defective items. Zbl 1411.90015
Cheikhrouhou, Naoufel; Sarkar, Biswajit; Ganguly, Baishakhi; Malik, Asif Iqbal; Batista, Rafael; Lee, Young Hae
6
2018
Lost sales reduction and quality improvement with variable lead time and fuzzy costs in an imperfect production system. Zbl 1405.90019
Soni, Hardik N.; Sarkar, Biswajit; Mahapatra, Amalendu Singha; Mazumder, S. K.
4
2018
A multi-retailer supply chain model with backorder and variable production cost. Zbl 1405.90015
Majumder, Arunava; Jaggi, Chandra K.; Sarkar, Biswajit
2
2018
Supply chain with customer-based two-level credit policies under an imperfect quality environment. Zbl 1425.90007
Khanna, Aditi; Kishore, Aakanksha; Sarkar, Biswajit; Jaggi, Chandra K.
1
2018
Periodic review fuzzy inventory model with variable lead time and fuzzy demand. Zbl 1371.90016
Sarkar, Biswajit; Mahapatra, Amalendu Singha
15
2017
Two-echelon supply chain model with manufacturing quality improvement and setup cost reduction. Zbl 1404.90032
Sarkar, Biswajit; Majumder, Arunava; Sarkar, Mitali; Dey, Bikash Koli; Roy, Gargi
10
2017
Preservation of deteriorating seasonal products with stock-dependent consumption rate and shortages. Zbl 1364.90028
Sarkar, Biswajit; Mandal, Buddhadev; Sarkar, Sumon
7
2017
Fuzzy \(\phi\)-tolerance competition graphs. Zbl 1381.05059
Pramanik, Tarasankar; Samanta, Sovan; Sarkar, Biswajit; Pal, Madhumangal
6
2017
Demand uncertainty and learning in fuzziness in a continuous review inventory model. Zbl 1377.68246
Soni, Hardik N.; Sarkar, Biswajit; Joshi, Manisha
4
2017
Supply chain model with stochastic lead time, trade-credit financing, and transportation discounts. Zbl 1426.90048
Kim, Sung Jun; Sarkar, Biswajit
3
2017
An integrated inventory model with variable transportation cost, two-stage inspection, and defective items. Zbl 1373.90009
Sarkar, Biswajit; Shaw, Bijoy Kumar; Kim, Taebok; Sarkar, Mitali; Shin, Dongmin
3
2017
Stochastic machine breakdown and discrete delivery in an imperfect inventory-production system. Zbl 1362.90065
Taleizadeh, Ata Allah; Samimi, Hadi; Sarkar, Biswajit; Mohammadi, Babak
3
2017
Effects of variable production rate and time-dependent holding cost for complementary products in supply chain model. Zbl 1426.90108
Sarkar, Mitali; Hur, Sun; Sarkar, Biswajit
1
2017
Supply chain coordination with variable backorder, inspections, and discount policy for fixed lifetime products. Zbl 1400.90034
Sarkar, Biswajit
22
2016
Product inspection policy for an imperfect production system with inspection errors and warranty cost. Zbl 1346.90287
Sarkar, Biswajit; Saren, Sharmila
18
2016
Controllable lead time, service level constraint, and transportation discounts in a continuous review inventory model. Zbl 1353.90019
Shin, Dongmin; Guchhait, Rekha; Sarkar, Biswajit; Mittal, Mandeep
10
2016
An inventory model with trade-credit policy and variable deterioration for fixed lifetime products. Zbl 1326.90008
Sarkar, Biswajit; Saren, Sharmila; Cárdenas-Barrón, Leopoldo Eduardo
34
2015
Effect of unequal lot sizes, variable setup cost, and carbon emission cost in a supply chain model. Zbl 1394.90045
Sarkar, Biswajit; Saren, Sharmila; Sinha, Debjani; Hur, Sun
12
2015
Partial trade-credit policy of retailer with exponentially deteriorating items. Zbl 1392.90007
Sarkar, Biswajit; Saren, Sharmila
11
2015
A comparative study between inventory followed by shortages and shortages followed by inventory under trade-credit policy. Zbl 1392.90006
Khanra, S.; Mandal, Buddhadev; Sarkar, B.
3
2015
An integrated inventory model with variable lead time, defective units and delay in payments. Zbl 1334.90012
Sarkar, Biswajit; Gupta, Hiranmoy; Chaudhuri, Kripasindhu; Goyal, Suresh Kumar
22
2014
An EMQ model with price and time dependent demand under the effect of reliability and inflation. Zbl 1410.90019
Sarkar, Biswajit; Mandal, Papiya; Sarkar, Sumon
12
2014
Min-max distribution free continuous-review model with a service level constraint and variable lead time. Zbl 1364.90025
Moon, Ilkyeong; Shin, Eunjoo; Sarkar, Biswajit
9
2014
A production-inventory model with probabilistic deterioration in two-echelon supply chain management. Zbl 1351.90018
Sarkar, Biswajit
52
2013
Integrated vendor-buyer supply chain model with Vendor’s setup cost reduction. Zbl 1334.90013
Sarkar, Biswajit; Majumder, Arunava
16
2013
An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments. Zbl 1426.90012
Cárdenas-Barrón, Leopoldo Eduardo; Sarkar, Biswajit; Treviño-Garza, Gerardo
14
2013
Easy and improved algorithms to joint determination of the replenishment lot size and number of shipments for an EPQ model with rework. Zbl 1390.90013
Cárdenas-Barrón, Leopoldo Eduardo; Sarkar, Biswajit; Treviño-Garza, Gerardo
11
2013
An EOQ model with delay in payments and time varying deterioration rate. Zbl 1255.90021
Sarkar, Biswajit
56
2012
An inventory model with reliability in an imperfect production process. Zbl 1239.90008
Sarkar, Biswajit
29
2012
An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production. Zbl 1245.90007
Sarkar, Biswajit
26
2012
An EPQ model with inflation in an imperfect production system. Zbl 1208.90012
Sarkar, Biswajit; Moon, Ilkyeong
36
2011
Optimal reliability, production lot size and safety stock in an imperfect production system. Zbl 1201.90069
Sarkar, Biswajit; Sana, Shib Sankar; Chaudhuri, Kripasindhu
17
2010
A finite replenishment model with increasing demand under inflation. Zbl 1188.90016
Sarkar, Biswajit; Sana, Shib Sankar; Chaudhuri, Kripasindhu
17
2010
all top 5

Cited by 391 Authors

34 Sarkar, Biswajit
22 Sana, Shibsankar
13 Cárdenas-Barrón, Leopoldo Eduardo
11 Taleizadeh, Ata Allah
10 Chaudhuri, Kripa Sindhu
10 Uthayakumar, Ramasamy
7 Weber, Gerhard-Wilhelm
6 Pal, Brojeswar
6 Palanivel, M.
6 Tiwari, Sunil
5 Jaggi, Chandra K.
5 Maiti, Manoranjan
5 Mirzazadeh, Abolfazl
5 Sarkar, Mitali
5 Shaikh, Ali Akbar
5 Teng, Jinn-Tsair
4 Das, Barun
4 Essam, Daryl L.
4 Khanna, Aditi
4 Kumar de, Sujit
4 Paul, Sanjoy Kumar
4 Saren, Sharmila
4 Sarkar, Sumon
4 Sarker, Ruhul Amin
4 Tripathi, R. P.
3 Chung, Kunjen
3 De, Manoranjan
3 Ghoreishi, Maryam
3 Ghosh, Santanu Kumar
3 Goswami, Adrijit
3 Guchhait, Rekha
3 Hur, Sun
3 Iqbal, Muhammad Waqas
3 Liao, Juijung
3 Moon, Ilkyeong
3 Ouyang, Liang-Yuh
3 Pareek, Sarla
3 Pervin, Magfura
3 Roy, Sankar Kumar
3 Singh, Shiv Raj
3 Treviño-Garza, Gerardo
3 Yang, Chih-Te
2 Chakrabarti, Tripti
2 Chakrabarty, Ranajit
2 Chatterjee, Gargi
2 Chen, Sheng-Chih
2 Chu, Lingling
2 Dye, Chung-Yuan
2 Fatemi Ghomi, Seyyed Mohammad Taghi
2 Ganguly, Baishakhi
2 Gautam, Prerna
2 Goyal, Suresh Kumar
2 Huang, Kuo-Nan
2 Huang, Yung-Fu
2 Jana, Dipak Kumar
2 Kalantari, Solaleh Sadat
2 Karimi, Behrooz
2 Khanra, Sudhansu
2 Khedlekar, Uttam Kumar
2 Kumar Sett, Bimal
2 Lee, Young-Hae
2 Lin, Shyder
2 Maihami, Reza
2 Majumder, Arunava
2 Mandal, Buddhadev
2 Mishra, Poonam
2 Mittal, Mandeep
2 Modak, Nikunja Mohan
2 Panda, Shibaji
2 Priyamvada
2 Qin, Juanjuan
2 Rashmanlou, Hossein
2 Roy, Tapan Kurner
2 Saha, Sujata
2 San-José, Luis Augusto
2 Seikh, Mijanur Rahaman
2 Shah, Nita H.
2 Shaw, Bijoy Kumar
2 Shin, Dongmin
2 Srivastava, Hari Mohan
2 Su, Rung-Hung
2 Talati, Isha
2 Talebi, Ali Asghar
2 Tavakoli, Shayan
2 Wan, Hong
2 Wang, Wan-Tsu
2 Wee, Hui-Ming
2 Weng, Ming-Wei
2 Weng, Tzu-Chun
2 Wu, Chengfeng
2 Wu, Jiang
2 Yang, Honglin
2 Zhang, Ren-Qian
2 Zhou, Wenhui
1 Abdel-Aleem, Ahmed
1 Acevedo Chedid, Jaime
1 Adak, Sudip
1 Agrawal, Swati
1 Ahmadian, Ali
1 Amaya, Rene
...and 291 more Authors
all top 5

Cited in 43 Serials

34 International Journal of Applied and Computational Mathematics
21 RAIRO. Operations Research
18 Annals of Operations Research
17 Applied Mathematics and Computation
17 Journal of Industrial and Management Optimization
15 Applied Mathematical Modelling
15 Mathematical Problems in Engineering
12 European Journal of Operational Research
10 Opsearch
8 YUJOR. Yugoslav Journal of Operations Research
7 International Journal of Systems Science. Principles and Applications of Systems and Integration
4 Discrete Dynamics in Nature and Society
3 Computers & Operations Research
3 Revista de la Real Academia de Ciencias Exactas, Físicas y Naturales. Serie A: Matemáticas. RACSAM
2 International Journal of Systems Science
2 Optimization
2 Top
2 International Transactions in Operational Research
2 Journal of Multiple-Valued Logic and Soft Computing
2 Iranian Journal of Fuzzy Systems
2 Symmetry
1 International Journal of Mathematics and Mathematical Sciences
1 Journal of Optimization Theory and Applications
1 Mathematics and Computers in Simulation
1 Asia-Pacific Journal of Operational Research
1 Mathematical and Computer Modelling
1 International Journal of Information and Management Sciences
1 The Journal of Analysis
1 Complexity
1 Soft Computing
1 Optimization and Engineering
1 Lobachevskii Journal of Mathematics
1 International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems
1 Dynamics of Continuous, Discrete & Impulsive Systems. Series A. Mathematical Analysis
1 Proceedings of the National Academy of Sciences, India. Section A. Physical Sciences
1 Journal of Intelligent and Fuzzy Systems
1 Journal of the Indonesian Mathematical Society
1 Advances in Decision Sciences
1 Croatian Operational Research Review (CRORR)
1 Numerical Algebra, Control and Optimization
1 Journal of the Operations Research Society of China
1 Mathematics
1 Asia Pacific Journal of Mathematics

Citations by Year