×

Fatemi Ghomi, Seyyed Mohammad Taghi

Author ID: fatemi-ghomi.seyyed-mohammad-taghi Recent zbMATH articles by "Fatemi Ghomi, Seyyed Mohammad Taghi"
Published as: Fatemi Ghomi, S. M. T.; Ghomi, S. M. T. Fatemi; Fatemi Ghomi, Seyyed Mohammad Taghi; Ghomi, Seyyed Mohammad Taghi Fatemi; Ghomi, Fatemi S. M. T.
Documents Indexed: 65 Publications since 1999
Co-Authors: 56 Co-Authors with 65 Joint Publications
512 Co-Co-Authors

Publications by Year

Citations contained in zbMATH Open

51 Publications have been cited 328 times in 274 Documents Cited by Year
Hybrid flowshop scheduling with machine and resource-dependent processing times. Zbl 1211.90077
Behnamian, J.; Fatemi Ghomi, S. M. T.
22
2011
An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times. Zbl 1102.90029
Zandieh, M.; Fatemi Ghomi, S. M. T.; Moattar Husseini, S. M.
19
2006
Prepositioning emergency earthquake response supplies: a new multi-objective particle swarm optimization algorithm. Zbl 1465.90126
Mohammadi, R.; Ghomi, S. M. T. Fatemi; Jolai, F.
15
2016
Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates. Zbl 1427.90169
Ebrahimi, M.; Fatemi Ghomi, S. M. T.; Karimi, B.
15
2014
An inventory model under uncertain inflationary conditions, finite production rate and inflation-dependent demand rate for deteriorating items with shortages. Zbl 1155.90312
Mirzazadeh, A.; Seyyed Esfahani, M. M.; Fatemi Ghomi, S. M. T.
14
2009
A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains. Zbl 1125.90025
Torabi, S. A.; Fatemi Ghomi, S. M. T.; Karimi, B.
13
2006
Scheduling open shops with parallel machines to minimize total completion time. Zbl 1200.90083
Naderi, B.; Fatemi Ghomi, S. M. T.; Aminnayeri, M.; Zandieh, M.
12
2011
Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times. Zbl 1197.90195
Behnamian, J.; Fatemi Ghomi, S. M. T.; Zandieh, M.
12
2010
Integrated markdown pricing and aggregate production planning in a two echelon supply chain: a hybrid fuzzy multiple objective approach. Zbl 1349.90295
Yaghin, R. Ghasemy; Torabi, S. A.; Ghomi, S. M. T. Fatemi
11
2012
A contribution and new heuristics for open shop scheduling. Zbl 1171.90403
Naderi, B.; Fatemi Ghomi, S. M. T.; Aminnayeri, M.; Zandieh, M.
10
2010
A multi-objective quantity discount and joint optimization model for coordination of a single-buyer multi-vendor supply chain. Zbl 1232.90115
Kamali, Amir; Ghomi, S. M. T. Fatemi; Jolai, F.
10
2011
Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines. Zbl 1127.90029
Jenabi, M.; Ghomi, Fatemi S. M. T.; Torabi, S. A.; Karimi, B.
9
2007
Optimal control of service rates and arrivals in Jackson networks. Zbl 1011.90016
Azaron, Amir; Fatemi Ghomi, S. M. T.
9
2003
The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine. Zbl 1293.90022
Behnamian, J.; Ghomi, S. M. T. Fatemi
9
2013
Stochastic mixed-model assembly line sequencing problem: mathematical modeling and Q-learning based simulated annealing hyper-heuristics. Zbl 1430.90300
Mosadegh, H.; Fatemi Ghomi, S. M. T.; Süer, G. A.
9
2020
Scheduling job shop problems with sequence-dependent setup times. Zbl 1198.90198
Naderi, B.; Zandieh, M.; Fatemi Ghomi, S. M. T.
9
2009
Two-machine flow shop total tardiness scheduling problem with deteriorating jobs. Zbl 1254.90066
Bank, Maedeh; Fatemi Ghomi, Seyyed Mohammad Taghi; Jolai, Fariborz; Behnamian, J.
7
2012
A note on minimizing makespan on a single batch processing machine with nonidentical job sizes. Zbl 1177.90166
Kashan, Ali Husseinzadeh; Karimi, Behrooz; Fatemi Ghomi, S. M. T.
7
2009
A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over. Zbl 1090.90204
Karimi, B.; Fatemi Ghomi, S. M. T.; Wilson, John M.
7
2006
Bi-criteria assembly line balancing by considering flexible operation times. Zbl 1228.90034
Hamta, Nima; Ghomi, S. M. T. Fatemi; Jolai, F.; Bahalke, Unes
6
2011
Effect of two-echelon trade credit on pricing-inventory policy of non-instantaneous deteriorating products with probabilistic demand and deterioration functions. Zbl 1400.90008
Maihami, Reza; Karimi, Behrooz; Fatemi Ghomi, Seyyed Mohammad Taghi
6
2017
An integrated quality, maintenance and production model based on the delayed monitoring under the ARMA control chart. Zbl 07497106
Jafarian-Namin, Samrad; Fallahnezhad, Mohammad Saber; Tavakkoli-Moghaddam, Reza; Salmasnia, Ali; Fatemi Ghomi, Seyyed Mohammad Taghi
6
2021
Acceleration strategies of Benders decomposition for the security constraints power system expansion planning. Zbl 1332.90177
Jenabi, M.; Fatemi Ghomi, S. M. T.; Torabi, S. A.; Hosseinian, S. H.
6
2015
Group shops scheduling with makespan criterion subject to random release dates and processing times. Zbl 1171.90389
Ahmadizar, Fardin; Ghazanfari, Mehdi; Fatemi Ghomi, Seyyed Mohammad Taghi
5
2010
The finite horizon economic lot scheduling in flexible flow lines. Zbl 1122.90360
Torabi, S. A.; Fatemi Ghomi, S. M. T.; Karimi, B.
5
2005
A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network. Zbl 0949.90012
Fatemi Ghomi, S. M. T.; Hashemin, S. S.
5
1999
A possibilistic multiple objective pricing and lot-sizing model with multiple demand classes. Zbl 1284.91294
Ghasemy Yaghin, R.; Fatemi Ghomi, S. M. T.; Torabi, S. A.
5
2013
Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times. Zbl 1349.90355
Iranpoor, Mehdi; Ghomi, S. M. T. Fatemi; Zandieh, M.
5
2013
A study on open shop scheduling to minimise total tardiness. Zbl 1356.90059
Naderi, B.; Ghomi, S. M. T. Fatemi; Aminnayeri, M.; Zandieh, M.
5
2011
A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept. Zbl 1103.90047
Rabbani, M.; Fatemi Ghomi, S. M. T.; Jolai, F.; Lahiji, N. S.
4
2007
Path critical index and activity critical index in PERT networks. Zbl 0998.90009
Ghomi, Fatemi S. M. T.; Teimouri, E.
4
2002
A new structural mechanism for reducibility of stochastic PERT networks. Zbl 1012.90004
Fatemi Ghomi, S. M. T.; Rabbani, M.
4
2003
MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups. Zbl 1197.90221
Mohammadi, M.; Fatemi Ghomi, S. M. T.; Karimi, B.; Torabi, S. A.
4
2010
Fuzzy development of mean and range control charts using statistical properties of different representative values. Zbl 1303.62113
Alizadeh, H. Moheb; Ghomi, S. M. T. Fatemi
4
2011
Pricing and inventory control in a supply chain of deteriorating items: a non-cooperative strategy with probabilistic parameters. Zbl 1397.90026
Maihami, Reza; Karimi, Behrooz; Ghomi, Seyyed Mohammad Taghi Fatemi
3
2017
A heuristic method for resource constrained allocation in multi-project scheduling. Zbl 1005.90034
Fatemi Ghomi, S. M. T.; Ashjari, B.
3
2002
Realistic two-stage flowshop batch scheduling problems with transportation capacity and times. Zbl 1236.90049
Behnamian, J.; Ghomi, S. M. T. Fatemi; Jolai, F.; Amirtaheri, O.
3
2012
Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness. Zbl 1286.90062
Mahnam, Mehdi; Moslehi, Ghasem; Fatemi Ghomi, Seyyed Mohammad Taghi
3
2013
A hybrid credibility-based fuzzy multiple objective optimisation to differential pricing and inventory policies with arbitrage consideration. Zbl 1334.91038
Yaghin, R. Ghasemy; Fatemi Ghomi, S. M. T.; Torabi, S. A.
3
2015
Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs. Zbl 1307.90064
Navaei, Javad; Fatemi Ghomi, Seyyed Mohammad Taghi; Jolai, Fariborz; Mozdgir, Ashkan
3
2014
A multi-phase covering Pareto-optimal front method to multi-objective parallel machine scheduling. Zbl 1197.90321
Behnamian, J.; Zandieh, M.; Fatemi Ghomi, S. M. T.
3
2010
Grouping in decomposition method for multi-item capacitated lot-sizing problem with immediate lost sales and joint and item-dependent setup cost. Zbl 1207.90010
Narenji, M.; Fatemi Ghomi, S. M. T.; Nooraie, S. V. R.
2
2011
Extension of common cycle lot-size scheduling for multi-product, multi-stage arborescent flow-shop environment. Zbl 1005.90027
Fatemi Ghomi, S. M. T.; Torabi, S. A.
2
2002
A dynamic dispatching problem to allocate relief vehicles after a disaster. Zbl 1523.90027
Gharib, Mehrdad; Fatemi Ghomi, Seyyed Mohammad Taghi; Jolai, Fariborz
2
2021
Fuzzy hypothesis testing with vague data using likelihood ratio test. Zbl 1329.62157
Alizadeh, H. Moheb; Khamseh, A. R. Arshadi; Ghomi, S. M. T. Fatemi
2
2013
A new hybrid algorithm of scatter search and Nelder-Mead algorithms to optimize joint economic lot sizing problem. Zbl 1321.90026
Sarakhsi, M. Khojaste; Fatemi Ghomi, S. M. T.; Karimi, B.
1
2016
Application of the preventive maintenance scheduling to increase the equipment reliability: case study- bag filters in cement factory. Zbl 1438.90103
Ebrahimi, Masoud; Ghomi, Seyyed Mohammad Taghi Fatemi; Karimi, Behrooz
1
2020
Lower bound for the mean project completion time in dynamic PERT networks. Zbl 1138.90352
Azaron, Amir; Fatemi Ghomi, S. M. T.
1
2008
Solving an integrated cell formation and group layout problem using a simulated annealing enhanced by linear programming. Zbl 1491.90080
Forghani, Kamran; Fatemi Ghomi, S. M. T.; Kia, Reza
1
2020
Multi-objective multi-factory scheduling. Zbl 1469.90075
Behnamian, Javad; Ghomi, Seyyed Mohammad Taghi Fatemi
1
2021
A game-theoretic model to analyze value creation with simultaneous cooperation and competition of supply chain partners. Zbl 1407.90057
Kafi, F.; Fatemi Ghomi, S. M. T.
1
2014
An integrated quality, maintenance and production model based on the delayed monitoring under the ARMA control chart. Zbl 07497106
Jafarian-Namin, Samrad; Fallahnezhad, Mohammad Saber; Tavakkoli-Moghaddam, Reza; Salmasnia, Ali; Fatemi Ghomi, Seyyed Mohammad Taghi
6
2021
A dynamic dispatching problem to allocate relief vehicles after a disaster. Zbl 1523.90027
Gharib, Mehrdad; Fatemi Ghomi, Seyyed Mohammad Taghi; Jolai, Fariborz
2
2021
Multi-objective multi-factory scheduling. Zbl 1469.90075
Behnamian, Javad; Ghomi, Seyyed Mohammad Taghi Fatemi
1
2021
Stochastic mixed-model assembly line sequencing problem: mathematical modeling and Q-learning based simulated annealing hyper-heuristics. Zbl 1430.90300
Mosadegh, H.; Fatemi Ghomi, S. M. T.; Süer, G. A.
9
2020
Application of the preventive maintenance scheduling to increase the equipment reliability: case study- bag filters in cement factory. Zbl 1438.90103
Ebrahimi, Masoud; Ghomi, Seyyed Mohammad Taghi Fatemi; Karimi, Behrooz
1
2020
Solving an integrated cell formation and group layout problem using a simulated annealing enhanced by linear programming. Zbl 1491.90080
Forghani, Kamran; Fatemi Ghomi, S. M. T.; Kia, Reza
1
2020
Effect of two-echelon trade credit on pricing-inventory policy of non-instantaneous deteriorating products with probabilistic demand and deterioration functions. Zbl 1400.90008
Maihami, Reza; Karimi, Behrooz; Fatemi Ghomi, Seyyed Mohammad Taghi
6
2017
Pricing and inventory control in a supply chain of deteriorating items: a non-cooperative strategy with probabilistic parameters. Zbl 1397.90026
Maihami, Reza; Karimi, Behrooz; Ghomi, Seyyed Mohammad Taghi Fatemi
3
2017
Prepositioning emergency earthquake response supplies: a new multi-objective particle swarm optimization algorithm. Zbl 1465.90126
Mohammadi, R.; Ghomi, S. M. T. Fatemi; Jolai, F.
15
2016
A new hybrid algorithm of scatter search and Nelder-Mead algorithms to optimize joint economic lot sizing problem. Zbl 1321.90026
Sarakhsi, M. Khojaste; Fatemi Ghomi, S. M. T.; Karimi, B.
1
2016
Acceleration strategies of Benders decomposition for the security constraints power system expansion planning. Zbl 1332.90177
Jenabi, M.; Fatemi Ghomi, S. M. T.; Torabi, S. A.; Hosseinian, S. H.
6
2015
A hybrid credibility-based fuzzy multiple objective optimisation to differential pricing and inventory policies with arbitrage consideration. Zbl 1334.91038
Yaghin, R. Ghasemy; Fatemi Ghomi, S. M. T.; Torabi, S. A.
3
2015
Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates. Zbl 1427.90169
Ebrahimi, M.; Fatemi Ghomi, S. M. T.; Karimi, B.
15
2014
Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs. Zbl 1307.90064
Navaei, Javad; Fatemi Ghomi, Seyyed Mohammad Taghi; Jolai, Fariborz; Mozdgir, Ashkan
3
2014
A game-theoretic model to analyze value creation with simultaneous cooperation and competition of supply chain partners. Zbl 1407.90057
Kafi, F.; Fatemi Ghomi, S. M. T.
1
2014
The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine. Zbl 1293.90022
Behnamian, J.; Ghomi, S. M. T. Fatemi
9
2013
A possibilistic multiple objective pricing and lot-sizing model with multiple demand classes. Zbl 1284.91294
Ghasemy Yaghin, R.; Fatemi Ghomi, S. M. T.; Torabi, S. A.
5
2013
Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times. Zbl 1349.90355
Iranpoor, Mehdi; Ghomi, S. M. T. Fatemi; Zandieh, M.
5
2013
Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness. Zbl 1286.90062
Mahnam, Mehdi; Moslehi, Ghasem; Fatemi Ghomi, Seyyed Mohammad Taghi
3
2013
Fuzzy hypothesis testing with vague data using likelihood ratio test. Zbl 1329.62157
Alizadeh, H. Moheb; Khamseh, A. R. Arshadi; Ghomi, S. M. T. Fatemi
2
2013
Integrated markdown pricing and aggregate production planning in a two echelon supply chain: a hybrid fuzzy multiple objective approach. Zbl 1349.90295
Yaghin, R. Ghasemy; Torabi, S. A.; Ghomi, S. M. T. Fatemi
11
2012
Two-machine flow shop total tardiness scheduling problem with deteriorating jobs. Zbl 1254.90066
Bank, Maedeh; Fatemi Ghomi, Seyyed Mohammad Taghi; Jolai, Fariborz; Behnamian, J.
7
2012
Realistic two-stage flowshop batch scheduling problems with transportation capacity and times. Zbl 1236.90049
Behnamian, J.; Ghomi, S. M. T. Fatemi; Jolai, F.; Amirtaheri, O.
3
2012
Hybrid flowshop scheduling with machine and resource-dependent processing times. Zbl 1211.90077
Behnamian, J.; Fatemi Ghomi, S. M. T.
22
2011
Scheduling open shops with parallel machines to minimize total completion time. Zbl 1200.90083
Naderi, B.; Fatemi Ghomi, S. M. T.; Aminnayeri, M.; Zandieh, M.
12
2011
A multi-objective quantity discount and joint optimization model for coordination of a single-buyer multi-vendor supply chain. Zbl 1232.90115
Kamali, Amir; Ghomi, S. M. T. Fatemi; Jolai, F.
10
2011
Bi-criteria assembly line balancing by considering flexible operation times. Zbl 1228.90034
Hamta, Nima; Ghomi, S. M. T. Fatemi; Jolai, F.; Bahalke, Unes
6
2011
A study on open shop scheduling to minimise total tardiness. Zbl 1356.90059
Naderi, B.; Ghomi, S. M. T. Fatemi; Aminnayeri, M.; Zandieh, M.
5
2011
Fuzzy development of mean and range control charts using statistical properties of different representative values. Zbl 1303.62113
Alizadeh, H. Moheb; Ghomi, S. M. T. Fatemi
4
2011
Grouping in decomposition method for multi-item capacitated lot-sizing problem with immediate lost sales and joint and item-dependent setup cost. Zbl 1207.90010
Narenji, M.; Fatemi Ghomi, S. M. T.; Nooraie, S. V. R.
2
2011
Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times. Zbl 1197.90195
Behnamian, J.; Fatemi Ghomi, S. M. T.; Zandieh, M.
12
2010
A contribution and new heuristics for open shop scheduling. Zbl 1171.90403
Naderi, B.; Fatemi Ghomi, S. M. T.; Aminnayeri, M.; Zandieh, M.
10
2010
Group shops scheduling with makespan criterion subject to random release dates and processing times. Zbl 1171.90389
Ahmadizar, Fardin; Ghazanfari, Mehdi; Fatemi Ghomi, Seyyed Mohammad Taghi
5
2010
MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups. Zbl 1197.90221
Mohammadi, M.; Fatemi Ghomi, S. M. T.; Karimi, B.; Torabi, S. A.
4
2010
A multi-phase covering Pareto-optimal front method to multi-objective parallel machine scheduling. Zbl 1197.90321
Behnamian, J.; Zandieh, M.; Fatemi Ghomi, S. M. T.
3
2010
An inventory model under uncertain inflationary conditions, finite production rate and inflation-dependent demand rate for deteriorating items with shortages. Zbl 1155.90312
Mirzazadeh, A.; Seyyed Esfahani, M. M.; Fatemi Ghomi, S. M. T.
14
2009
Scheduling job shop problems with sequence-dependent setup times. Zbl 1198.90198
Naderi, B.; Zandieh, M.; Fatemi Ghomi, S. M. T.
9
2009
A note on minimizing makespan on a single batch processing machine with nonidentical job sizes. Zbl 1177.90166
Kashan, Ali Husseinzadeh; Karimi, Behrooz; Fatemi Ghomi, S. M. T.
7
2009
Lower bound for the mean project completion time in dynamic PERT networks. Zbl 1138.90352
Azaron, Amir; Fatemi Ghomi, S. M. T.
1
2008
Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines. Zbl 1127.90029
Jenabi, M.; Ghomi, Fatemi S. M. T.; Torabi, S. A.; Karimi, B.
9
2007
A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept. Zbl 1103.90047
Rabbani, M.; Fatemi Ghomi, S. M. T.; Jolai, F.; Lahiji, N. S.
4
2007
An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times. Zbl 1102.90029
Zandieh, M.; Fatemi Ghomi, S. M. T.; Moattar Husseini, S. M.
19
2006
A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains. Zbl 1125.90025
Torabi, S. A.; Fatemi Ghomi, S. M. T.; Karimi, B.
13
2006
A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over. Zbl 1090.90204
Karimi, B.; Fatemi Ghomi, S. M. T.; Wilson, John M.
7
2006
The finite horizon economic lot scheduling in flexible flow lines. Zbl 1122.90360
Torabi, S. A.; Fatemi Ghomi, S. M. T.; Karimi, B.
5
2005
Optimal control of service rates and arrivals in Jackson networks. Zbl 1011.90016
Azaron, Amir; Fatemi Ghomi, S. M. T.
9
2003
A new structural mechanism for reducibility of stochastic PERT networks. Zbl 1012.90004
Fatemi Ghomi, S. M. T.; Rabbani, M.
4
2003
Path critical index and activity critical index in PERT networks. Zbl 0998.90009
Ghomi, Fatemi S. M. T.; Teimouri, E.
4
2002
A heuristic method for resource constrained allocation in multi-project scheduling. Zbl 1005.90034
Fatemi Ghomi, S. M. T.; Ashjari, B.
3
2002
Extension of common cycle lot-size scheduling for multi-product, multi-stage arborescent flow-shop environment. Zbl 1005.90027
Fatemi Ghomi, S. M. T.; Torabi, S. A.
2
2002
A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network. Zbl 0949.90012
Fatemi Ghomi, S. M. T.; Hashemin, S. S.
5
1999
all top 5

Cited by 651 Authors

12 Fatemi Ghomi, Seyyed Mohammad Taghi
10 Azaron, Amir
7 Tavakkoli-Moghaddam, Reza
7 Zandieh, Mostafa
6 Framinan, Jose M.
5 Karimi, Behrooz
5 Mirzazadeh, Abolfazl
5 Naderi, Bahman
5 Ruiz, Rubén
5 Sakawa, Masatoshi
5 Yang, Shanlin
4 Allahverdi, Ali
4 Behnamian, Javad
4 Buscher, Udo
4 Cheng, Bayi
4 Jafarian, Ahmad
4 Jolai, Fariborz
4 Katagiri, Hideki
4 Lee, Wen-Chiung
4 Maihami, Reza
4 Pan, Quanke
4 Torabi, Seyed Ali
3 Abreu, Levi R.
3 Aminnayeri, Majid
3 Cheng, Tai-Chiu Edwin
3 Ghalehkhondabi, Iman
3 Ghasemy Yaghin, R.
3 Ghoreishi, Maryam
3 Karimi-Mamaghan, Maryam
3 Kato, Kosuke
3 Mohammadi, Mehrdad
3 Nagano, Marcelo Seido
3 Nourbakhsh, Vahid
3 Prata, Bruno A.
3 Rabbani, Masoud
3 Salmasnia, Ali
3 Taleizadeh, Ata Allah
3 Weber, Gerhard-Wilhelm
2 Ahmadi, Ehsan
2 Akartunalı, Kerem
2 Aleman, Dionne M.
2 Aydilek, Asiye
2 Aydilek, Harun
2 Chang, Ching-Ter
2 Chang, Koan-Yuh
2 Cheaitou, Ali
2 Chen, Ruey-Maw
2 Chu, Weng-Ming
2 Chung, Yu-Hsiang
2 Davoudpour, Hamid
2 Devika, K. B.
2 Ebrahimi, Masoud
2 Fernandez-Viagas, Victor
2 Gao, Liang
2 Govindan, Kannan
2 Guerriero, Francesca
2 Gupta, Jatinder N. D.
2 Hamdan, Sadeque
2 Hu, Xiaoxuan
2 Jafarian-Namin, Samrad
2 Kuhn, Heinrich
2 Leung, Joseph Y.-T.
2 Li, Kai
2 Lu, Yuanyuan
2 Meyer, Patrick
2 M’Hallah, Rym
2 Najafi, Amir Abbas
2 Nasini, Stefano
2 Neufeld, Janis S.
2 Noori, Siamak
2 Pereira, Jordi
2 Quadt, Daniel
2 Rafiei, Hamed
2 Schulz, Sven
2 Shen, Liji
2 Shi, Leyuan
2 Teunter, Ruud H.
2 Urbach, David R.
2 Wu, Tao
2 Yaghoubi, Saeed
2 Yeh, Wei-Chang
2 Zia, Nadia Pourmohammad
1 Abbas, Moncef
1 Abbassi, Abderrahman
1 Abdelmaguid, Tamer F.
1 Abdzadeh, Behnam
1 Abedinnia, Hamid
1 Abo-Sinna, Mahmoud A.
1 Absi, Nabil
1 Acar, Müge
1 Acebes, Fernando
1 Aghamohammadi-Bosjin, Soroush
1 Ahmadian, Mohammad Mahdi
1 Ahmadizar, Fardin
1 Aitken, James
1 Akhavan Niaki, Seyed Taghi
1 Akrami, B.
1 Aktaş, Emel
1 Al-Salem, Mohammed
1 Alemany, M. M. E.
...and 551 more Authors
all top 5

Cited in 58 Serials

47 European Journal of Operational Research
43 Computers & Operations Research
40 Applied Mathematical Modelling
14 Annals of Operations Research
12 Applied Mathematics and Computation
10 Journal of Industrial and Management Optimization
9 Engineering Optimization
6 International Journal of Systems Science
6 Mathematical Problems in Engineering
5 International Journal of Production Research
5 Soft Computing
5 International Journal of Systems Science. Principles and Applications of Systems and Integration
4 Information Sciences
4 International Transactions in Operational Research
4 RAIRO. Operations Research
4 Optimization Letters
3 Opsearch
3 Asia-Pacific Journal of Operational Research
3 Journal of Applied Mathematics
2 Computers & Mathematics with Applications
2 Naval Research Logistics
2 Journal of Statistical Computation and Simulation
2 Journal of Combinatorial Optimization
2 CEJOR. Central European Journal of Operations Research
2 OR Spectrum
2 4OR
2 INFOR: Information Systems and Operational Research
1 Computing
1 Fuzzy Sets and Systems
1 Mathematics and Computers in Simulation
1 Theoretical Computer Science
1 Optimization
1 Neural Networks
1 International Journal of Information and Management Sciences
1 Discrete Event Dynamic Systems
1 Automation and Remote Control
1 Communications in Statistics. Theory and Methods
1 Mathematical Programming. Series A. Series B
1 Archives of Control Sciences
1 Computational Optimization and Applications
1 Top
1 Complexity
1 INFORMS Journal on Computing
1 Abstract and Applied Analysis
1 Journal of Scheduling
1 Discrete Dynamics in Nature and Society
1 Brazilian Journal of Probability and Statistics
1 Journal of Systems Science and Complexity
1 Sādhanā
1 Journal of Multiple-Valued Logic and Soft Computing
1 Computational Management Science
1 Networks and Spatial Economics
1 Iranian Journal of Fuzzy Systems
1 Algorithms
1 Operations Research and Decisions
1 Journal of Mathematical Modeling
1 International Journal of Applied and Computational Mathematics
1 Stochastics and Quality Control

Citations by Year