×
Author ID: sawik.tadeusz-j Recent zbMATH articles by "Sawik, Tadeusz J."
Published as: Sawik, Tadeusz; Sawik, Tadeusz J.; Sawik, T.; Sawik, T. J.
External Links: ORCID
Documents Indexed: 54 Publications since 1976, including 3 Books
Reviewing Activity: 81 Reviews
Co-Authors: 3 Co-Authors with 1 Joint Publication
4 Co-Co-Authors

Publications by Year

Citations contained in zbMATH Open

40 Publications have been cited 225 times in 138 Documents Cited by Year
Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line. Zbl 1073.90514
Sawik, Tadeusz
23
2002
Modelling and scheduling of a flexible manufacturing system. Zbl 0707.90042
Sawik, Tadeusz
16
1990
Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers. Zbl 0969.90048
Sawik, T.
16
2000
Integer programming approach to production scheduling for make-to-order manufacturing. Zbl 1068.90064
Sawik, T.
12
2005
Scheduling flexible flow lines with no in-process buffers. Zbl 0916.90156
Sawik, T. J.
12
1995
Optimization of cost and service level in the presence of supply chain disruption risks: single vs. multiple sourcing. Zbl 1348.90125
Sawik, Tadeusz
12
2014
An exact approach for batch scheduling in flexible flow lines with limited intermediate buffers. Zbl 1052.90038
Sawik, T.
11
2002
Hierarchical approach to production scheduling in make-to-order assembly. Zbl 1094.90016
Sawik, Tadeusz
11
2006
A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing. Zbl 1121.90046
Sawik, Tadeusz
9
2007
Mixed integer programming for scheduling surface mount technology lines. Zbl 1060.90690
Sawik, Tadeusz
8
2001
Integer programming models for the design and balancing of flexible assembly systems. Zbl 0822.90078
Sawik, T.
7
1995
Selection of a dynamic supply portfolio in make-to-order environment with risks. Zbl 1202.90166
Sawik, Tadeusz
7
2011
Scheduling in supply chains using mixed integer programming. Zbl 1230.90004
Sawik, Tadeusz
7
2011
Loading and scheduling of a flexible assembly system by mixed integer programming. Zbl 1099.90023
Sawik, Tadeusz
6
2004
Balancing and scheduling of surface mount technology lines. Zbl 1048.90507
Sawik, Tadeusz
6
2002
A lexicographic approach to bi-objective loading of a flexible assembly system. Zbl 0943.90022
Sawik, Tadeusz
5
1998
Optimal versus heuristic scheduling of surface mount technology lines. Zbl 1094.90557
Kaczmarczyk, Waldemar; Sawik, Tadeusz; Schaller, Andreas; Tirpak, Thomas M.
5
2004
Simultaneous versus sequential loading and scheduling of flexible assembly systems. Zbl 1094.90563
Sawik, Tadeusz
5
2000
Multi-objective master production scheduling in make-to-order manufacturing. Zbl 1154.90375
Sawik, Tadeusz
5
2007
Supply chain disruption management. Using stochastic mixed integer programming. 2nd edition. Zbl 1484.90002
Sawik, Tadeusz
5
2020
A cyclic versus flexible approach to materials ordering in make-to-order assembly. Zbl 1090.90108
Sawik, T.
4
2005
A multilevel machine and vehicle scheduling in a flexible manufacturing system. Zbl 0852.90086
Sawik, T.
4
1996
Supplier selection in make-to-order environment with risks. Zbl 1219.90025
Sawik, Tadeusz
3
2011
Modelling and scheduling a batch-type production on identical machines. Zbl 0637.90047
Sawik, T. J.
3
1988
Scheduling nonpreemptible dependent operations of unequal processing times on nonidentical machines - a state space approach. Zbl 0502.90047
Sawik, Tadeusz J.
2
1982
Scheduling multi-operational tasks on nonidentical machines as a time- optimal control problem. Zbl 0481.90044
Sawik, Tadeusz J.
2
1982
An interactive approach to bicriterion loading of a flexible assembly system. Zbl 0892.90092
Sawik, T. J.
2
1997
A multi-objective customer orders assignment and resource leveling in make-to-order manufacturing. Zbl 1146.90394
Sawik, Tadeusz
2
2007
Stochastic versus deterministic approach to coordinated supply chain scheduling. Zbl 1426.90134
Sawik, Tadeusz
2
2017
A critical path algorithm for scheduling a batch-type production on nonidentical machines. Zbl 0634.90032
Sawik, Tadeusz J.
2
1987
Scheduling lots of dependent unit-time operations on identical machines to minimize schedule length. Zbl 0572.90052
Sawik, Tadeusz J.
2
1985
Simultaneous loading, routing, and assembly plan selection in a flexible assembly system. Zbl 0987.90030
Sawik, T.
1
1998
Hierarchical scheduling flowshops with parallel machines and finite in- process buffers. Zbl 0702.90034
Sawik, Tadeusz
1
1988
Operations scheduling as a time-optimal control problem. Zbl 0449.90049
Sawik, Tadeusz J.
1
1980
Algorithms for simultaneous scheduling of machines and vehicles in a FMS. Zbl 0818.90060
Sawik, Tadeusz
1
1994
Integer programming approach to reactive scheduling in make-to-order manufacturing. Zbl 1170.90398
Sawik, Tadeusz
1
2007
Stochastic optimal control of a multi-facility, multi-product production scheduling with random times of supplies. Zbl 0369.93049
Sawik, Tadeusz
1
1977
Task allocation, operation scheduling and vehicle routing in a flexible manufacturing system. Zbl 0754.90028
Sawik, Tadeusz
1
1991
Monolithic versus hierarchical approach to integrated scheduling in a supply chain. Zbl 1198.90065
Sawik, Tadeusz
1
2009
Time-optimal multi-product production scheduling. Zbl 0332.90022
Sawik, Tadeusz
1
1976
Supply chain disruption management. Using stochastic mixed integer programming. 2nd edition. Zbl 1484.90002
Sawik, Tadeusz
5
2020
Stochastic versus deterministic approach to coordinated supply chain scheduling. Zbl 1426.90134
Sawik, Tadeusz
2
2017
Optimization of cost and service level in the presence of supply chain disruption risks: single vs. multiple sourcing. Zbl 1348.90125
Sawik, Tadeusz
12
2014
Selection of a dynamic supply portfolio in make-to-order environment with risks. Zbl 1202.90166
Sawik, Tadeusz
7
2011
Scheduling in supply chains using mixed integer programming. Zbl 1230.90004
Sawik, Tadeusz
7
2011
Supplier selection in make-to-order environment with risks. Zbl 1219.90025
Sawik, Tadeusz
3
2011
Monolithic versus hierarchical approach to integrated scheduling in a supply chain. Zbl 1198.90065
Sawik, Tadeusz
1
2009
A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing. Zbl 1121.90046
Sawik, Tadeusz
9
2007
Multi-objective master production scheduling in make-to-order manufacturing. Zbl 1154.90375
Sawik, Tadeusz
5
2007
A multi-objective customer orders assignment and resource leveling in make-to-order manufacturing. Zbl 1146.90394
Sawik, Tadeusz
2
2007
Integer programming approach to reactive scheduling in make-to-order manufacturing. Zbl 1170.90398
Sawik, Tadeusz
1
2007
Hierarchical approach to production scheduling in make-to-order assembly. Zbl 1094.90016
Sawik, Tadeusz
11
2006
Integer programming approach to production scheduling for make-to-order manufacturing. Zbl 1068.90064
Sawik, T.
12
2005
A cyclic versus flexible approach to materials ordering in make-to-order assembly. Zbl 1090.90108
Sawik, T.
4
2005
Loading and scheduling of a flexible assembly system by mixed integer programming. Zbl 1099.90023
Sawik, Tadeusz
6
2004
Optimal versus heuristic scheduling of surface mount technology lines. Zbl 1094.90557
Kaczmarczyk, Waldemar; Sawik, Tadeusz; Schaller, Andreas; Tirpak, Thomas M.
5
2004
Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line. Zbl 1073.90514
Sawik, Tadeusz
23
2002
An exact approach for batch scheduling in flexible flow lines with limited intermediate buffers. Zbl 1052.90038
Sawik, T.
11
2002
Balancing and scheduling of surface mount technology lines. Zbl 1048.90507
Sawik, Tadeusz
6
2002
Mixed integer programming for scheduling surface mount technology lines. Zbl 1060.90690
Sawik, Tadeusz
8
2001
Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers. Zbl 0969.90048
Sawik, T.
16
2000
Simultaneous versus sequential loading and scheduling of flexible assembly systems. Zbl 1094.90563
Sawik, Tadeusz
5
2000
A lexicographic approach to bi-objective loading of a flexible assembly system. Zbl 0943.90022
Sawik, Tadeusz
5
1998
Simultaneous loading, routing, and assembly plan selection in a flexible assembly system. Zbl 0987.90030
Sawik, T.
1
1998
An interactive approach to bicriterion loading of a flexible assembly system. Zbl 0892.90092
Sawik, T. J.
2
1997
A multilevel machine and vehicle scheduling in a flexible manufacturing system. Zbl 0852.90086
Sawik, T.
4
1996
Scheduling flexible flow lines with no in-process buffers. Zbl 0916.90156
Sawik, T. J.
12
1995
Integer programming models for the design and balancing of flexible assembly systems. Zbl 0822.90078
Sawik, T.
7
1995
Algorithms for simultaneous scheduling of machines and vehicles in a FMS. Zbl 0818.90060
Sawik, Tadeusz
1
1994
Task allocation, operation scheduling and vehicle routing in a flexible manufacturing system. Zbl 0754.90028
Sawik, Tadeusz
1
1991
Modelling and scheduling of a flexible manufacturing system. Zbl 0707.90042
Sawik, Tadeusz
16
1990
Modelling and scheduling a batch-type production on identical machines. Zbl 0637.90047
Sawik, T. J.
3
1988
Hierarchical scheduling flowshops with parallel machines and finite in- process buffers. Zbl 0702.90034
Sawik, Tadeusz
1
1988
A critical path algorithm for scheduling a batch-type production on nonidentical machines. Zbl 0634.90032
Sawik, Tadeusz J.
2
1987
Scheduling lots of dependent unit-time operations on identical machines to minimize schedule length. Zbl 0572.90052
Sawik, Tadeusz J.
2
1985
Scheduling nonpreemptible dependent operations of unequal processing times on nonidentical machines - a state space approach. Zbl 0502.90047
Sawik, Tadeusz J.
2
1982
Scheduling multi-operational tasks on nonidentical machines as a time- optimal control problem. Zbl 0481.90044
Sawik, Tadeusz J.
2
1982
Operations scheduling as a time-optimal control problem. Zbl 0449.90049
Sawik, Tadeusz J.
1
1980
Stochastic optimal control of a multi-facility, multi-product production scheduling with random times of supplies. Zbl 0369.93049
Sawik, Tadeusz
1
1977
Time-optimal multi-product production scheduling. Zbl 0332.90022
Sawik, Tadeusz
1
1976
all top 5

Cited by 282 Authors

27 Sawik, Tadeusz J.
6 Boysen, Nils
4 Fliedner, Malte
4 Mohamed, Zubair M.
4 Öztürk, Cemalettin
4 Scholl, Armin
3 Brandimarte, Paolo
3 Dolgui, Alexandre B.
3 Ornek, Arslan M.
3 Wang, Ling
2 Chen, Chuen-Lung S.
2 Chen, Chun-Lung
2 Delorme, Xavier
2 Hnich, Brahim
2 Kovalëv, Sergeĭ Protasovich
2 Kurz, Mary E.
2 Pastor, Rafael
2 Ruiz, Rubén
2 Tunali, Semra
2 Zandieh, Mostafa
1 Acero-Dominguez, Milton J.
1 Aizemberg, Luiz
1 Akrami, B.
1 Alghazi, Anas
1 Aliano Filho, Angelo
1 Almada-Lobo, Bernardo
1 Almeder, Christian
1 Andrés, Carlos
1 Ash, Cecil
1 Askin, Ronald G.
1 Azarpour, Ali Moayedi
1 Banihashemi, Shokoofeh
1 Barbosa Póvoa, Ana Paula Ferreira Dias
1 Baş, Seda
1 Baveja, Alok
1 Ben-Dov, Yariv T.
1 Bernardo, John J.
1 Bhadury, Joy
1 Bozkir, Cem Deniz Caglar
1 Burdett, Robert L.
1 Buscher, Udo
1 Cailloux, Jocelin
1 Calderini, Matias
1 Cantos Lopes, Thiago
1 Capacho, Liliana
1 Carello, Giuliana
1 Chang, Pingteng
1 Chen, Kedong
1 Chen, Lu
1 Chen, Shih-Pin
1 Chen, Wun-Hwa
1 Choi, Tsan-Ming
1 Collignon, Stephane
1 Das, Ajay
1 Dauzère-Pérès, Stéphane
1 Davarzani, Hoda
1 Davis, Lauren B.
1 Davoudpour, Hamid
1 de Oliveira, Washington Alves
1 Demirli, Kudret
1 Deng, Mingxing
1 Deng, Yirui
1 Diallo, Claver
1 Ding, Junwen
1 El Baz, Jamal
1 El-Wehedi, Fekrat
1 Emde, Simon
1 Essam, Daryl L.
1 Fahimnia, Behnam
1 Fatemi Ghomi, Seyyed Mohammad Taghi
1 Fathi, Yahya
1 Fedtke, Stefan
1 Filippi, Carlo
1 Floudas, Christodoulos Achilleus
1 Fontem, Belleh A.
1 Framinan, Jose M.
1 Frein, Yannick
1 Fujimura, Shigeru
1 Füßler, David
1 Gallay, Olivier
1 Ghalehkhondabi, Iman
1 Gicquel, Celine
1 Golenko-Ginzburg, Dimitri
1 Gomes, M. C.
1 Goyal, Suresh Kumar
1 Gröflin, Heinz
1 Guastaroba, Gianfranco
1 Gunasekaran, Angappa
1 Günther, Hans-Otto
1 Gupta, Manmohan Prasad
1 Guschinskaya, Olga
1 Hammami, Ramzi
1 Hariga, Moncer A.
1 Hedin, Scott R.
1 Hege, L.
1 Henry, Andrea C.
1 Herrera-Hernandez, Maria C.
1 Hsieh, Yi-Chih
1 Huang, Dexian
1 Hung, Lung-Ting
...and 182 more Authors

Citations by Year